Rainas Municipality

Office of the Municipal Executive


Tinpiple, Lamjung, Gandaki Province, Nepal
AOC
Name of Project :-Timure School
Location:- Rainas-3
S.N. Description of work Quantity units net weight(kg) Rate Amount Remarks
1 Grill work for window (10x10 mm 11.32 m2 128.0292 120 15363.50
square rod @ 100 mm c/c Vertically & 4
Nos horizontally with 25x5 mm flat
iron border

Prepared By: Checked By: Approved By:


Sudha Thapa/Lakshman Khanal Er.Bhim Prasad Dahal Ramchandra Adhikari
Rainas Municipality
Office of the Municipal Executive
Tinpiple, Lamjung,Gandaki Province, Nepal
Detail Estimate
Name of Project :-Timure School
Location:- Rainas-3

S.N. Description of work Nos. length(m) Breadth(m) Height(m) Quantity units Remarks
1 Grill work for window (10x10 mm square 11.317 m2
rod @ 100 mm c/c Vertically & 4 Nos
horizontally with 25x5 mm flat iron
border
8 1.219 0.340 3.316 m2 (48"*13")
8 1.200 0.356 3.418 m2 (48"*14")
8 1.219 0.470 4.583 m2 (48"*18.5")

Prepared By: Checked By: Approved By:


Sudha Thapa/Lakshman Khanal Er.Bhim Prasad Dahal Ramchandra Adhikari
Grill work for window (10x10 mm square rod @ 100 mm c/c Vertically & 4 Nos horizontally with 25x5
mm flat iron border
Window size :- 1.6*1.8=2.88 Sq.m.
Items Description : No Length Breadth Height Quantity
Pipe 100*100 mm
Vertical @ 100 mm C/C 15 1.80 0.01 0.01 0.0027
Horizontal 4 1.60 0.01 0.01 0.0006
0.0033
25.91
Grill 25*5 mm for border
Vertical 2 1.80 0.025 0.005 0.00045
Horizontal 2 1.60 0.025 0.005 0.00040
0.00085
6.67

Net weight of size 1.6*1.8 window (2.88 m2) 32.58 Kg.


Net wt. per sq.m. weight 11.31 Kg/m2
Analysis of Rates
Item No :-
Description :- Gabion ( 8 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (8 gauge) at bhotewodar 85.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13 % VAT 11.05
Total per kg 96.55

Item No :-
Description :- Gabion ( 10 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (10 gauge) at Bhotewodar 85.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13 % VAT 11.05
Total per kg 96.55

Item No :-
Description :- Gabion (12 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (12 gauge) at Bhotewodar 86.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13% VAT 11.18
97.68

b. Box Size-2x1x1 44-1-Bii/44-2-i/45


Rainas Municipality
Office of the Municipal Executive
Tinpiple, Lamjung, 4 No. Province, Nepal
Detailed Estimate
Name of Project :- Toilet and Masonary wall
Location: Rainas Municipality
S.N. Description of work Nos. length(m) Breadth(m) Height(m) Quantity units Remarks
1 Earthwork in Excavation 8.0 m3
Long wall 2 3.1 0.9 0.91 5.1 m3
Short wall 2 1.8 0.9 0.91 2.9 m3
2 Stone Soiling 3.1 m3
1 9.8 0.9 0.150 1.3 m3
Floor 1 2.5 4.7 0.15 1.8 m3
3 PCC(1:2:4) 1.6 m3
1 9.8 0.90 0.08 0.7
Floor 1 2.5 4.70 0.08 0.9
4 Stone Masonary(1:4) 4.8 m3
1 9.8 0.7 0.7 4.8
5 DPC Band
1 9.8 0.23 0.2 0.45 m3
6 Brick Masonary(1:4) 4.5 m3
1 9.8 0.23 2.29 5.2 m3
Deduction
Door 2 0.76 0.23 1.83 -0.64 m3
Ventilation 2 0.61 0.23 0.30 -0.08 m3
7 Chaukosh 0.11 m3
Door 2 0.76 0.09 1.83 0.08 m3
Ventilation 2 0.61 0.09 0.30 0.03 m3
8 Panal 3.15 m2
Door 2 0.76 1.83 2.78 m2
Ventilation 2 0.61 0.30 0.37 m2
9 PCC(1:2:4) 1.29 m3
Slab 1 3.35 2.13 0.13 0.93 m3
Sill 1 9.80 0.23 0.08 0.18 m3
Lintel 1 9.80 0.23 0.08 0.18 m3
10 Plaster (1:4) 24.67 m2
Big Room 1 5.64 2.29 12.92 m2
Small Room 1 5.13 2.29 11.75 m2
11 Reinforcement 224.00 Kg
Vertical Rod 16mm Rod 6 3.35 1.58 31.76 Kg
DPC Band 12mm dia 4 9.8 0.89 34.89 Kg
Sill 12 mm dia 2 9.8 0.89 17.44 Kg
Lintel 12mm dia 2 9.8 0.89 17.44 Kg
Stirrups 8mm dia 290 0.3 0.39 33.93 Kg
Slab
Main Bar 10 mm dia 34 2.1 0.62 44.27 Kg
Distribution Bar 10 mm dia 21 3.4 0.62 44.27 Kg
12 Pan 2 2.0 Nos
13 Fittings 1 1.0 Ls
14 Hill Tank 1 1.0 Nos
15 Tile(1:4) 9.76 m2
Floor 2 1.37 1.22 3.34 m2
Side 2 5.49 0.70 7.69 m2
Deduction
Door 2 0.91 0.70 -1.27 m2
Masonary wall
1 Earthwork in excavation 1 10 0.72 0.5 3.6 m3

2 Masonary wall(1:4) 14.99 m3


Straight 1 10 0.72 1.70 12.24 m3
Slpoe 1 4.5 0.72 1.70 2.75 m3

Prepared By Checked By Approved By


Manju Bhandari Atit Khanal Dev Bdr. Adhikari
Rainas Municipality
Office of Rainas Municipal Executive
Tinpiple,Lamjung, 4 No. Provience
2017

sfo{ ;DkGg k|lta]bg


of]hgfsf] gfd Toilet and Masonary wall ;Demf}tfsf] s"n c+s M #REF!
of]hgf :yn M Rainas Municipality vr{ ePsf] s"n c+s M #REF!
sfof{/De ldlt M ;Demf}tf eGbf 3l6 a9 #REF!
:fDkGg ePsf] ldlt M 36L a9Lsf] k|lt;t M #REF!

;Demf}tf adf]lhd v'b ePsf] sfd ;Demf}tf eGbf 3l6 ÷ a9L


s|=:f+Vof sfdsf] laj/0f OsfO{ s}lkmot
kl/0ffd OsfO{ b/ hDdf d"No kl/0ffd OsfO{ b/ hDdf d"No kl/df0f OsfO{ b/ hDdf dNo
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #REF! #REF! #REF!
a9L ePsf] - _ 36L ePsf] - _
Rainas Municipality
Office of the Municipal Executive
Tinpiple, Lamjung, 4 No. Province, Nepal
BoQ
#REF!
#REF!
S.N. Description of work Quantity units Rate Amount Remarks
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
5 #REF! #REF! #REF!
6 #REF! #REF! #REF!
7 #REF! #REF! #REF!
8 #REF! #REF! #REF!
9 #REF! #REF! #REF!
10 #REF! #REF! #REF!
11 #REF! #REF! #REF!
12 #REF! #REF! #REF!
13 #REF! #REF! #REF!
14 #REF! #REF! #REF!
15 #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
Total
VAT (13%)
Grand Total
#REF!
#REF!
#REF!
Bill of Quantity (BoQ)
###
### F/Y :- 2074 /075
Rate (NRs.)
S.No. Descriptions Unit Quantity Amount (NRs.)
In Figure In Words
1.0 #REF! LS 1.000
2.0 #REF! m3 4.434
3.0 #REF! m3 1.794
4.0 #REF! m3 4.549
5.0 #REF! m3 1.572
6.0 #REF! Kg. 124.810
7.0 #REF! m2 19.878
8.0 #REF! m3 1.527
9.0 #REF! m3 8.126
10.0 #REF!
11.0 #REF! m3 0.179
12.0 #REF! m2 1.934
13.0 #REF! m2 2.275
14.0 #REF! m2 1.046
15.0 #REF! m2 3.100
Masonry wall
1.0 #REF! Kg. 195.450
2.0 #REF! m2 26.020
13% VAT
Total

Name and address of Firm :-

Sign and seal : -


Date :-
Remarks