Description Dia No Col No of Bar Length Length Total length Unit wt Quantity

ft m m kg/m kg
For Mess of Reinforcement Below Column
X-axis 12 2 6 5.00 1.52 18.24 0.89 16.23
Y axis 12 2 6 5.00 1.52 18.24 0.89 16.23

Ground Floor
0 For column
0 Longitudinal Bar 12 2 4 7.00 2.13 17.04 0.89 15.17
0 Development Length 12 2 4 2.36 0.72 5.76 0.89 5.13
0 Longitudinal Bar 16 2 4 7.00 2.13 17.04 1.58 26.92
0 Development Length 16 2 4 3.15 0.96 7.68 1.58 12.13
0 Lateral ties (outer) 8 2 22 4.00 1.22 53.68 0.39 20.94
0 Lateral ties (outer) 8 2 22 3.00 0.91 40.04 0.39 15.62
0 For Beam
0 Longitudinal Bar 12 4 4 26.50 8.08 129.28 0.89 115.06
0 Development Length 12 4 4 2.36 0.72 11.52 0.89 10.25
0 Lateral ties (outer) 8 4 67 3.00 0.91 243.88 0.39 95.11

Description 8 dia 12 dia 16 dia 20 dia 25 dia 32 dia Total


Ground Floor 131.67 178.07 39.05 - - - 348.79
Rainas Municipality
Office of the Municipal Executive
Tinpiple, Lamjung, 4 No. Province, Nepal
BOQ

Name of Project: Rainas Municipality Information Room Date:-2077-05-15


Location: Rainas - 5

S.N. Description of work Quantity units Rate Amount

1 Earthwork in excavation in medium rock 0.11 Cum 2,441.10 268.52


2 PCC(M10))1:3:6 (Column) 2.83 Cum 10,970.45 31,046.37
3 Iron Work 93.32 Kg 135.60 12,654.19
4 Colar Cgi Sheet 0.45 mm 0.70 Boundle 12,898.95 9,029.27
5 Aluminium partition work(78mm
series/5mm clear glass) #REF! Cum 192.10 #REF!

6 Almunium Door Set (3'*7') #REF! #REF! 15,600.00 #REF!


Total #REF!

Prepared By: Checked By: Approved By:


Manju Bhandari / Narendra Kumal Bhim Prasad Dahal Ram Chandra Adhikari
77-05-15

Remarks

Prepared By: Checked By: Approved By:


Manju Bhandari / Narendra Kumal Bhim Prasad Dahal Ram Chandra Adhikari
Rainas Municipality
Office of the Municipal Executive
Tinpiple, Lamjung, 4 No. Province, Nepal
Detail Estimate
Name of Project: Rainas Municipality Information Room Date:-2077-05-15
Location: Rainas - 5
S.N. Description of work Nos. length Breadth Height Quantity units Remarks
1 Earthwork in excavation in medium 0.30 0.30 0.30 0.11 Cub.m
rock including 10 m lead and 1.5m lift
(Column) 4.00
2 PCC(M10))1:3:6 (Column) 4.00 0.25 0.25 0.30 0.08 Cub.m
3 PCC(M10))1:3:6 Floor 1.00 3.35 2.74 0.30 2.75 Cub.m
Total 2.83 Cub.m
4 2" Square Pipe 4.00 9.72 38.88 Kg
5 Truss
Long Side 2 10.1115513562938 20.22 Kg
Short Side 4 8.55592807071015 34.22 Kg
Total 93.32 Kg
6 Colar Cgi Sheet 0.45 mm 1 0.7 0.70 Boundle
7 Aluminium partition work(78mm
series/5mm clear glass)
(Aluminium partition work by white 13.52 Sqm
or black color size 40*50mm with
ACP board section)
Long Side 1 3.3526363913 1.524018532 5.11 Sqm
Front Side 1 2.7432333577 1.524018532 4.18 Sqm
Back side 1 2.7432333577 2.895635211 7.94 Sqm
Deduct
Aluminiun window set 1 1.5240185321 1.523925632 -2.32 Sqm
Almunium Door Set (3'*7') 1 1.5240185321 0.914411119 -1.39 Sqm
(Aluminium partition work by white 8.92 Sqm
or black color size 40*50mm with
glass)
Long Side 1 3.3526363913 1.371616679 4.60 Sqm
Front Side 1 2.7432333577 1.371616679 3.76 Sqm
deduct
Almunium Door Set (3'*7') 1 0.6096074128 0.914411119 0.56 Sqm

8 Almunium Door Set (3'*7') 1 0.9144111192 2.133625945 1.95 Sqm


9 Aluminiun window set 1 1.5240185321 1.523925632 2.32 Sqm

Approved By:-
Prepared By:- Checked By :-
Ram Chandra Adhikari
Manju Bhandari / Narendra Kumal Bhim Prasad Dahal
Norms no 2-1.2.2,2-1.8 and 2-1.9 Norms Unit 1.00
Items Description : Earthwork in excavation in medium rock including 10 m lead and 1.5m lift
a)   Ordinary soil
Description Quantity Unit
Skilled
Labour
Unskilled 3.00 md 790.00

Tools and plants @


3 % of labour cost
Total
Rate per unit

Norms no 41 - 11 Norms Unit 1.00

Cement concrete work. It includes all labour and material required for mixing, placing in position,
vibrating, compacting, finishing, curing and all other incidentals required to produce concrete of specified
strength as per the Specifications. The rate includes the work of making, fixing and removing of all centres
Items Description : and forms required for the work.
Work in foundation
a - M 10 Grade (1:3:6 mix by volume)
Description Quantity Unit Rate
Skilled 1.00 md 1090.00
Labour
Unskilled 4.00 md 790.00
cement 4.40 bag 960.50
Materials aggrigate 0.89 m 3
1815.00
Sand 0.47 m3 1870.00
Total
Rate per unit
Cu.m
ding 10 m lead and 1.5m lift

Amount

2370.00

71.10

2441.10
2441.10

m3

equired for mixing, placing in position,


uired to produce concrete of specified
making, fixing and removing of all centres

Amount
1090.00
3160.00
4226.20
1615.35
878.90
10970.45
10970.45