You are on page 1of 6

To : PITCO

Attention : Mr. Suhail Qadiri


Project : Sherbini Industrial Complex
Date : 21/12/2022
No. of pages : 05
Ref. Offer Number : MAO/ARM/2022/0608(REV.01)

Dear Sir,

Thank you for your inquiry to supply formwork for the above-mentioned project.
We take pleasure to enclose herewith our offer based on the drawings and
information we received from you.

Scope of the Offer

1. Financial Offer Description.


2. Terms and condition of Payment.

Our systems are durable, safe, easy, and fast to use. We are committed to support
you with the highest level of engineering and technical service. We hope that our
proposal satisfies your requirements. If you have any inquiries, please do not
hesitate to contact us.

MANAR
A- FINANCIAL OFFER DESCRIPTION

1 CupLock System
Rental Prices

➢ COMPLEX Ground Floor:

SI Items Description QTY Unit Price /Month Total Price /Month


1 Adjustable Base Jack 626 1.25 782.50
2 Adjustable U head Jack 626 1.50 939.00
3 Standard 2.50 Meters 212 3.85 816.20
4 Standard 3.00 Meters 414 4.60 1,904.40
5 Ledger 0.60 Meters 402 0.78 313.56
6 Ledger 0.90 Meters 420 1.06 445.20
7 Ledger 1.00 Meters 159 1.15 182.85
8 Ledger 1.25 Meters 1,029 1.37 1,409.73
9 Ledger 1.60 Meters 207 1.70 351.90
10 Ledger 1.80 Meters 804 1.88 1,511.52
11 Scaffold Pipe 3.00 Meters 25 2.94 73.50
12 Scaffold Pipe 2.50 Meters 71 2.45 173.95
13 Scaffold Pipe 2.00 Meters 108 1.96 211.68
14 Scaffold Pipe 1.50 Meters 111 1.47 163.17
15 Swivel Coupler 408 0.75 306.00
16 Double Coupler 222 0.75 166.50
17 LVL Board 1.50 Meters 4 5.69 22.74
18 Main Alum. Beam 6.00 Meters 36 24.00 864.00
19 Main Alum. Beam 5.00 Meters 30 20.00 600.00
20 Main Alum. Beam 4.00 Meters 36 16.00 576.00
21 Main Alum. Beam 3.00 Meters 5 12.00 60.00
22 Main Alum. Beam 2.50 Meters 64 10.00 640.00
23 Main Alum. Beam 2.00 Meters 68 8.00 544.00
24 Main Alum. Beam 1.50 Meters 29 6.00 174.00
Total Rental Amount / Month (SAR) 13,232.40
• Above prices don’t include VAT Tax
• Above quantities estimated for area of 812.40m² out of total area 2,052m² for GF with unit
price 16.29 SAR/m²/Month.
➢ COMPLEX Access Scaffold:

SI Items Description QTY Unit Price /Month Total Price /Month


1 Adjustable Base Jack 226 1.25 282.50
2 Spigot with Bolt 226 0.50 113.00
3 Standard 2.00 Meters 226 3.09 698.34
4 Standard 3.00 Meters 226 4.60 1,039.60
5 Ledger 0.90 Meters 32 1.06 33.92
6 Ledger 1.25 Meters 808 1.37 1,106.96
7 Ledger 1.80 Meters 575 1.88 1,081.00
8 Steel Ladder 5.00 Meters 2 15.00 30.00
9 Scaffold Pipe 3.00 Meters 29 2.94 85.26
10 Scaffold Pipe 2.00 Meters 190 1.96 372.40
11 Scaffold Pipe 1.00 Meters 40 0.98 39.20
12 Swivel Coupler 116 0.75 87.00
13 Double Coupler 402 0.75 301.50
14 Single Coupler 12 0.75 9.00
15 Board Retaining Clamp 300 0.75 225.00
16 LVL Board 4.00 Meters 308 15.16 4,669.28
17 LVL Board 3.00 Meters 21 11.37 238.77
18 LVL Board 2.50 Meters 14 9.48 132.65
19 LVL Board 2.00 Meters 120 7.58 909.60
Total Rental Amount / Month (SAR) 11,454.98
• Above prices don’t include VAT Tax
• Above quantities estimated for access scaffold around whole building.
PAYMENT TERMS AND CONDITION

1. Payment: one-month rent should be paid in advance and this advance will be deducted from your
final statement.
2. Invoice: Every month invoice will be raised & it should be fully paid within 15 Days.
3. Transportation: will be your responsibility from our Store to your site and return back to store.
4. Delivery time: 7-10 days from receiving advance payment & date of P.O & signing contract.
5. Starting rent: rent will be start from the date of delivery of material from our store and it will be
stopped on the date of return of material to same store.
6. Once material delivered minimum one-month rent will be charged, after one-month we will
charge as per day.
7. Erection is your responsibility.
8. Lost items: Any Lost or Damage of material will be back charged with current unit sale price.
9. Lifting material: A Crane and forklift facility to be provided to lift & transfer material from one
location to the other (internal movement within the site) is costumer responsibility. Manlift for
Erection of Suspended Scaffolding. Materials transportation to erection area is customer
responsibility.
10. Other terms & Conditions will be finalized at the time of signing the contract.
11. Validity of quotation 10-days from the date of quotation.
12. Only authorized person can handle all activity with us as like Signing Contract, Material receiving /
delivery & all payment transactions.
13. Required chamber of Commerce & C.R. Copy.
14. VAT: There will be 15% Added for each Invoice according to VAT Regulations inside Saudi Arabian
Kingdom
15. Above prices doesn’t include any design package and if required it’ll be charged with 10,000 SAR
per each drawings package.

PRICING DEPARTMENT
ENG. WALEED MOSTAFA

You might also like