Professional Documents
Culture Documents
Presented to
the Faculty of
Zamboanga City State Polytechnic College
Ayala Extension Classes
Zamboanga City
In Partial Fulfillment
of the Requirements for the Degree of
BACHELOR OF SCIENCE IN COMPUTER TECHNOLOGY
By:
Asdali, Majyme B.
Caminade, Riza Mae T.
Ombreso, Jeniffer B.
Rivera, Christian Jay M.
Villanueva, Ivyliza T.
Zorilla, Lecil I.
October 2018
ii
APPROVAL SHEET
Majyme B. Asdali
Riza Mae T. Caminade
Jeniffer B. Ombreso
Christian Jay M. Rivera
Ivyliza T. Villanueva
Lecil I. Zorilla.
ROBYN P. TOLENTINO
Adviser
Critic Reader: JOEY E. SERVAN
================================================================
APPROVED by the Members of the Panel on OCTOBER 16, 2018 with a rating of
PASSED.
RAY T. SALVADOR
Chairman
HEINTJE F. MARBA
Administrator ZCSPC-Ayala
ACKNOWLEDGEMENT
The proponents of the study would like to thank everyone that has been
strength, knowledge and wisdom. We would like also to thank those people
TOLENTINO thank you for the support and help us unconditionally, to Mr.
To our Critic Reader, Mr. JOEY E. SERVAN thank you for being there for
guiding and helping us regarding for the development of this paper and for
giving us some knowledge and fresh ideas. To the members of the panel to
And lastly, to Mr. RAFFY HAMIS thank you for helping and giving us
big ideas to make this research possible and functional, the one that help us
more and motivate us in times of needs, lifting us higher than we are when
and feared of criticism and rejections. We really thank you for that and more
spiritual support served as our weapons to win our individual battles. Thank
DEDICATION
knowledge we sincerely
Mr.And Mrs.Ombreso
ABSTRACT
students hit the limited range set in the program called arduino.
This study wanted to address the common problem of the teachers which was
the noise inside the classroom. The respondents for this study were randomly
selected high school teachers in Recodo National High School and ZCSPC-
Ayala Extension Classes. This study was also limited to a classroom setting
in which this device has its four major components and these are; Sensor
device, Buzzer, Bulb and the Programmable device. The construction time
month, twelve days and eight hours and most of the time was spent in the trial
and revision of the gadget in which it took one month and five days for
the gadget, the researchers selected 18 teachers from Recodo National High
shows it garnered an average mean of 3.98 and falls under the descriptive
rating of “Agree”.
Moreover, the researchers found out that this project was effective and
efficient to become a device that can control the noise inside a classroom.
The proponents would like also to recommend to the next researchers that
whoever may wish to reconstruct and redesign the Automatic Noise Breaker
Detector may follow the design used in the study and also used the proper
Detector and would also to recommend whoever adopt and innovate this
device may add back-up battery. The device should be exhibited in local and
other regions.
vii
TABLE OF CONTENTS
TITLE PAGE…………………………………….……………………………....…..…….. i
APPROVAL SHEET………………………........……………………………..……......... ii
ACKNOWLEDGEMENT……………………….….………………………….….……..…iii
DEDICATION ………………………………….……………………………….…….........v
ABSTRACT………………………………...……........…………………………..………..vi
TABLE OF CONTENTS……………………………….……………………….........……viii
APPENDICES……………………………….………….…………………....……………..x
LIST OF FIGURES……………………………………….…………………..…………….xi
LIST OF TABLES ……………………………….………….………………………...……xii
CHAPTER
I. INTRODUCTION
Related Literature………………………………………….………….…..…6
Conceptual Model………………………………………………….…….….11
Bills of Materials……………………………..…………………….……….14
Construction Procedures…………………………………..…………...…. 20
Structure…………………………………………….….……………….…….28
Process…………………………………….……………………………….…29
Maintenance…………………………………………….…………….…….. 33
Summary .…………………………………………………………………….37
ix
Conclusion………………………………………………………………….…38
Recommendation.…………………………………………………………….38
REFERENCES………………………………………………………..……… 39-40
x
APPENDICES
C. Curriculum Vitae………………………………………………………….43
xi
List of Figures
Figure
3. Schematic Diagram…………………………………………………….……18
xii
List of Tables
Table
1. Bill of Materials……………….………………………………………………14