Professional Documents
Culture Documents
B C D E F G H I J K L M
N
355
157-FL0008-A1A2-8"
PSV PV
4"x1"
006 A 005 B 100
FLARE CSO NOTE 8
4"x2" FLARE VALVE
TO FLARE HEADER 157-FL0007-A1A2-2" N
4" 6" FREE DRAIN PV-002B
170-PI-161 157-FL0006-A1A2-6" N TO FLARE HEADER OPENING
3/4"
360 17.0 kg/cm2g 170-PI-161
FC 356 PV-002A
1 1/2"x3" 4" FLARE
4"
PSV 157-FL0003-A1A2-18" TO FLARE HEADER
3/4"
N
CSO 0 50 100 %
157-FG0013-ADA2-4"-ST
170-PI-161
FREE DRAIN
006 B
N
676
157-FG0019-ADA2-3/4"
N
PIC-002 OUTPUT
157-FG0104-ADA2-3/4"
CSC
157-FG0012-ADA2-6"-ST
PIC 7. SEE TYPE III FOR PUMP VENT/DRAIN IN P&ID 000-PI-406.
3/4"
3.5 kg/cm2g
005
FLARE 1 1/2"x3" 8. SEE TYPE II FOR CONTROL VALVE VENT/ DRAIN IN P&ID 000-PI-405.
1"
TO FLARE HEADER 18"x10"
3/4"
7 157-FL0010-A1A2-4" N
PSV CSC 7
170-PI-161 9. SEE TYPE II FOR LEVEL INSTRUMENT VENT/DRAIN IN
354 3.5 kg/cm2g 015 A 157-FG0017-ADA2-6"-ST 1" PV P&ID 000-PI-404.
CSO PT
10"x8"
157-FL0011-A1A2-4" N 1 1/2"x3" 002 A
005
SPLIT
3/4"
NOTE 6
6"x4"
PSV PP FC 8" 8"
3/4"
015 B
NOTE 8
10"x8"
CSC 157-FG0004-ADA2-6"-ST
CSO
3/4"
N
157-PG0005-A1A2-4"
HOLD LIST
DENSITY
3/4"
PG TE TT TI TAH
NNF
PAH 1. DELETED.
N
PIC AI
157-FG0020-ADA2-3/4"
004 001 001 001
FREE DRAIN
CSC PP
1"
3/4"
157-FG0014-ADA2-10"-Ih
157-PG0006-A1A2-4" N
NOTE 9 AT
1" LAH
6
157-E-501 LG-R LT LIC 001
6
3/4"
157-FG0002-ADA2-14"-Ih
N
157-PL0001-A1A2-2"
FREE DRAINING
GENERAL NOTES
5 5
1. (A) : SUPPLIED BY ADHI.
6.2 kg/cm2g
FLARE (G) : SUPPLIED BY GS E&C.
8"x10" 157-FL0002-A1A2-18" N TO FLARE HEADER
170-PI-161
N
2. INSTRUMENTS ARE PREFIXED WITH 157.
157-FL0009-A1A2-18"
PSV 358
NNF 003 A CSO 3. FOR SYMBOL AND LEGEND, REFER TO P&ID
RFCC-000-PR-PI-101~103.
6.2 kg/cm2g
NOTE 9
3/4"
LAH 4. UNLESS SPECIFIED, VALVE SIZE IS SAME AS LINE SIZE.
LIA I LT LG-T 8"x10"
006 001 006 005 PSV
LAL DP CSO 5. PROVIDE CLEARANCE FOR BLIND REMOVAL OR RODDING AT OILY
3/4"
CSO SEWER DRAIN POINT.
003 B
24"
AUTO STOP AT LOW
157-FG0005-ADA2-12"-Ih
U.C.
MH 2" CSC
T.L EL. 2300 2"
3/4"
FREE DRAIN
4 4
3"
CSC
3/4"
N
157-PL0002-A1A2-2"
157-V-501
157-FG0018-ADA2-12"-Ih 3"
2300
EQUIPMENT SUMMARY
AUTO START AT HIGH
157-MPC0001-BSA2-1 1/2"-Ih
ARRANGEMENT
IN VIEW
FOR PIPING
HAND-OFF-AUTO PT. PERTAMINA (Persero)
ST
MIN.
LP CONDENSATE 001 HS
2
TO HEADER 157-LPC0001-ASA2-3"-Ih 3"x1 1/2" 501
2
T
N
170-PI-131 PT. ADHI KARYA (Persero) Tbk
157-PL0007-A1A2-2"
AT TWO PHASE FLOW GL. 0
362
HEADER
beyond construction
3/4"
FIC
001 Project Title :
FLARE
157-FL0001-A1A2-2" N TO FLARE HEADER CILACAP RESID FLUID CATALYTIC CRACKING
170-PI-161
FE FT FV 774 (RFCC) PROJECT
001 001 001
NOTE 8
CILACAP, CENTRAL JAVA, INDONESIA
FREE DRAIN
OFF-SPEC LPG
FROM 47-P-502A/B 47-LPG0068-D1A2-3" N NNF Drawing Title :
170-PI-183 FC
609 3" 3"
1 1 1/2" OS PIPING & INSTRUMENT DIAGRAM 1
2" FUEL OIL & FUEL GAS SYSTEM
FUEL GAS LPG VAPORIZER
157-FG0001-ADA2-14"-Ih FROM HEADER
170-PI-171
686 SCALE. JOB. No DRAWING NO. REV.
- 101830 RFCC-G-157-PR-PI-101-A1 7
A B C D E F G H I J K L M
THIS DRAWING IS THE PROPERTY OF GS ENGINEERING & CONSTRUCTION CORP.(GSE&C). IT CONTAINS INFORMATIONS REGARDED AS CONFIDENTIAL BY GSE&C. THIS DRAWING AND THE INFORMATION THEREON IS NOT TO BE USED OR DISCLOSED TO OTHERS EXCEPT WITH WRITTEN GSE&C AUTHORIZATION. THIS DRAWING IS NOT TO BE REPRODUCED OR COPIED WITHOUT PERMISSION AND IS TO BE RETURNED TO GSE&C WITH ANY COPIES (PARTIAL OR COMPLETE) ON DEMAND.