You are on page 1of 2

Validate Print Item

HelpRate BoQ

Tender Inviting Authority Executive Engineer Construction Division Uttarakhand Peyjal Nigam Srinagar

Name of Work Tender for construction of source work laying jointing and testing of GI pipe line construction of CWR and other appurtenant in Bakuda water supply scheme under Jal Jeevan
Mission
Contract No
Name of the
Bidder/ Bidding
Firm / Company
:
PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender.
Bidders are allowed to enter the Bidder Name and Values only )

NUMBER # TEXT # NUMBER # TEXT # NUMBER # NUMBER # TEXT #


BASIC RATE In
Figures To be
Sl. entered by the TOTAL AMOUNT TOTAL AMOUNT
Item Description Quantity Units
No. Bidder With Taxes In Words
Rs. P

1 2 4 5 13 54 55
1 Excavation in all kind of soil required to use os special T&P
such as pickaxes, sabble etc for foundation including lift upto
1.5 m and lead upto 30m and removal and disposal of surplus 30.00 Cum 0.00 INR Zero Only
earth upto a distance of 50m from foundation trenches as per
directrion of Engineer in Charge.
2 Cement Concrete with 40mm gauge stone ballast, coarse
sand and cement in proportion 8:4:1 in foundation including
12.00 Cum 0.00 INR Zero Only
cartage and supply of all materials,labours,T&P etc.
complete for proper completion of work.
3 Cement concrete with 20mm gauge stone ballast,coarse sand
and cement in proportion of 4:2:1 including cartage and
20.00 Cum 0.00 INR Zero Only
supply of all materials,labours,T&P etc. required for proper
completion of work.
4 R.R. Stone masonary with 1:6 cement and sand mortar
including cartage and supply of all materials,labours,T&P etc. 130.00 Cum 0.00 INR Zero Only
complete for proper completion of work.
5 R.R.Stone masonry laid in dry including cartage and supply
of all materials,labours,T&P etc. required for proper 50.00 Cum 0.00 INR Zero Only
completion of work.
6 Random Rubble stone masonary in Coolie walling including
supply of all material,labour, T&P etc. required for proper
20.00 Cum 0.00 INR Zero Only
completion of the work in laying of 22.50 cm thick boulder
pitching.
7 20mm thick plaster with 1:6 cement and sand mortar for
50.00 Sqm 0.00 INR Zero Only
proper completion of work
8 Providing of all materials, carting from site store to site of
work, laying & jointing of G.I. screwed pipes (including supply
of all jointing materials like specials, white lead, hemp and oil
etc.) in trenches with its cutting, threading and testing of pipe
line etc complete.
8.01 15mm dia 350.00 Rm. 0.00 INR Zero Only
8.02 20mm dia 3200.00 Rm. 0.00 INR Zero Only
8.03 25mm dia 300.00 Rm. 0.00 INR Zero Only
8.04 32mm dia 2500.00 Rm. 0.00 INR Zero Only
9 Excavation in soil mixed with single boulders etc. required to
use of specials T&P, if any for pipe line trenches including lift
1320.00 Cum 0.00 INR Zero Only
up to 1.50m and lead up to 30.00m with back
filling,watering,ramming of excavated earth in the trenches.
9.01 Same as above but for soft rocks 50.00 Cum 0.00 INR Zero Only
10 Cartage of following sizes of G.M. valves/Air valve upto site of work
and fixing the same in water supply lines including cost of valves,
specials, labour and T&P complete in all respect but excluding the
cost of earth work and construction of chamber.
10.01 Gate valve
10.02 20mm dia 3.00 Nos 0.00 INR Zero Only
10.03 25mm dia 1.00 Nos 0.00 INR Zero Only
10.04 32mm dia 4.00 Nos 0.00 INR Zero Only
10.05 Air Valve
10.06 15mm dia 1.00 Nos 0.00 INR Zero Only
11 Dismantling Screwed and socketed M.S. galvanised pipes, metre
specials and fittings including taking out from trenches and stacking
them properly within 50metres but excluding cost of trenching.

11.01 15mm dia 50.00 Rm. 0.00 INR Zero Only


11.02 20mm dia 50.00 Rm. 0.00 INR Zero Only
11.03 25mm dia 50.00 Rm. 0.00 INR Zero Only
11.04 32mm dia 50.00 Rm. 0.00 INR Zero Only
12 Relalying of dismantlled screwed and socketed M.S. galvanised
pipes, metre specials and fitting , lowering in true to alignment and
gradient as per site conditions and including cutting of pipes for
making up lengths as required for proper completion of work
12.01 15mm dia 50.00 Rm. 0.00 INR Zero Only
12.02 20mm dia 50.00 Rm. 0.00 INR Zero Only
12.03 25mm dia 50.00 Rm. 0.00 INR Zero Only
12.04 32mm dia 50.00 Rm. 0.00 INR Zero Only
13 Reinforced cement concrete work in walls (any thickness),
including attached pilasters, buttresses, plinth and string
courses, fillets, columns, shuttering, finishing and
reinforcement pillars,piers,abutments, posts and struts etc. 2.00 Cum 0.00 INR Zero Only
upto floor five level excluding cost of centring in
1:1.5:3(1cement :1.5 coarse sand : 3 graded stone
aggregate 20mm nominal size)
14 Reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all complete 100.00 Kg 0.00 INR Zero Only
Using Thermo-Mechanically Treated Bars
15 Providing and fixing M.S. M.H. cover of following size
15.01 (0.60x0.60)m 2.00 Nos 0.00 INR Zero Only
15.02 (0.45x0.45)m 2.00 Nos 0.00 INR Zero Only
16 Supply of all materials, labour, T&P etc and construction of R.C.C.
CWR of following capacities (KL) with M.S. ladder outside & inside
of the tank, M.S.M.H. cover with locking arrangement, supply and
fixing of outlet, overr flow and wash out pipes with necessary sluice
valves, pipe pieces (including cost of materials) flooring 0.60 M wide
apron, painting with approved water proofing (apex) / enamal paint,
testing, filling water for testing purpose etc. including supply of
vertical pipes and specials, assuming bearing capacity as 8MT/M2
.
16.01 20.00KL 1.00 Nos 0.00 INR Zero Only
17 Supply of all materials,labours,T&P etc complete to construct Gate
valve chamber as per type design, as per direction of Engineer 8.00 Nos 0.00 INR Zero Only
Incharge,including cartage of all mateials etc. complete.
18 Supply of all materials,labours,T&P etc complete to construct Air
valve chamber as per type design, as per direction of Engineer 1.00 Nos 0.00 INR Zero Only
Incharge,including cartage of all mateials etc. complete.
19 Providing 15mm dia FHTC to the consumer as per norms of JJM
including supply and carting of alll materials,labour, T&P etc. 55.00 Nos 0.00 INR Zero Only
complete.
20 Construction of 4.00m vide B.F.G at source work including
construction of intake chamber and supply of all materials,labour, 1.00 Nos 0.00 INR Zero Only
T&P etc. complete.
21 Construction of extra length of B.F.G. at source work including
supply of all materials,labour, T&P etc. complete.
3.00 Rm. 0.00 INR Zero Only
22 Construction of R.C.C. roughening filter cum collecting chamber
complete as per type design, as per direction of Engineer 1.00 Nos 0.00 INR Zero Only
Incharge,including cartage of all mateials etc. complete.
23 Supply of all materials, labours, T&P etc and construct R.C.C break
pressure tank as per type design having size (1.0m x 1.0m x 1.0m)
size, as per direction of Engineer Incharge,including cartage of all
1.00 Nos 0.00 INR Zero Only
mateials etc. complete.
Total in Figures
0.00 INR Zero Only
Quoted Rate in Words
INR Zero Only

You might also like