Settlement Analysis For Foundations: S D D E Q B' (1 - ) I
Settlement Analysis For Foundations: S D D E Q B' (1 - ) I
Poisson's Ratio
Precons. Press
Density T/m3
Elasticity, T/m2
Cc2 (p>=pc)
Cc1 (p<pc)
Depth , m
Initial Void
Modulus of
SoilType*
(pc), T/m2
C,G or H
Ratio
Layer
Soil Classification
=
No.
From To
1 0.0 2.0 Silty clay C 1.78 1000 5 0.7 0.0250 0.236 0.45
2 2.0 7.0 Silty clay C 1.83 1500 22 0.66 0.0220 0.290 0.45
3 7.0 11.5 Silty clay C 1.93 2200 30 0.6 0.0200 0.330 0.45
4 11.5 15.5 Silty sand G 2.00 3000 0.33
* For "Soil Type", Enter : C (Cohesive soil), G (Granular soil) or H (Hard soils/Rock - no consolidation)
Thickness, m
AT CENTRE OF LAYER
LAYER No.
Modulus
Layer
Soil of
Depth,m
Depth, m
below
Elasticity,
Fndn.
Type
GL.
(H)
m=L'/Z n=B'/Z
T/m2
T/m2 Factor* T/m2
2 3 C 1.5 5.5 4.5 8.33 8.33 0.9 18.0 1500 0.01 1.0 0.1 0.00097
3 4.5 C 5.25 9.25 7.8 2.38 2.38 0.7 14.5 2200 0.05 1.0 0.4 0.00316
4 4 G 9.5 13.5 11.9 1.32 1.32 0.6 11.0 3000 0.14 1.0 0.8 0.00568
CONSOLIDATION SETTLEMENT
As per Terzaghi's theory of one dimensional consolidation :
cc H
Sc = {log(p+Dp)/p} loed df dr
1+e0
= mv Dp H loed df dr e0 = Initial void ratio
where: cc = compression index cc1 = cc for stress range < pre-consoli-dation
p = overburden pressure pressure = recompression index
Dp = incremental pressure computed using stress cc2 = cc for stress range >= pre-consoli-
distribution theory (Boussenesq or
dation pressure
Westergaard)
mv = coeff. of volume change, to be selected
depending on the pressure in layer
loed = oedometer correction factor
2
Applied Bearing Pressure : 19.5 T/m
Foundation Depth, (D) : 4.0 m Stress Distribution Theory : Enter B for
Foundation Width (B) : 25.0 m Boussenesq or W for Westergaard O for W
Foundation Length L : 25.0 m Osterberg Stress Distribution
Oedometer Correction Factor, l : 0.7
2
Overburden Pressure @ Fndn Lvl : 3.22 T/m
dp)/p] /(1+e0)
AT CENTRE OF LAYER
Thickness, m
Cc H log[(p+
Precons.
P + Dp,
below GL.
(Z) Below
Layer
Depth,m
Depth, m
2
No. Type m=L'/Z n=B'/Z T/m (pc),
T/m2 Factor* T/m2 T/m2
2 3.0 C 1.50 5.50 4.465 8.33 8.33 0.924 18.01 0.2900 22.48 22.0 0.032
3 4.5 C 5.25 9.25 7.803 2.38 2.38 0.742 14.47 0.0200 22.27 30.0 0.026
4 4.0 G 9.50 13.50 11.895 1.32 1.32 0.565 11.03