You are on page 1of 3

4.

2 SAMPLE CALCULATION FOR SAFE BEARING CAPACITY CALCULAION


AS PER SETTLEMENT CRITERIA
AS PER IS 8009-1 CLOUSE No. 9.0

Bore hole no. : BH-1


Length of footing = L = 3.00
Width of footing = B = 3.00
Depth of footing below ground level = D = 2.00
Average density of soil above foundation γ b 1.698
Average density of soil at foundation γ b 1.791
q = γ* D = over burden Pressure 3.58
Water table effect = W' = 1.00
SAY Q safe =( t/m2) 10.00

B= 3
qn (tonnes)= 57.762 depth = 2.00 m
ϒb = 1.698 t/m3

Layer 1 Thickness = 3.00 m eo = 0.69


ϒb = 1.791 t/m3 Cc = 0.189

Layer 2 Thickness = 3.00 m eo = 0.71


ϒb = 1.822 t/m3 Cc = 0.225

Layer 3 Thickness = 3.00 m eo = 0.68


ϒb = 1.864 t/m3 Cc = 0.252

Stress at depth = 11.00 m = 0.228044 t/m2 , Which is


3.55319261 % of original 6.42 t/m 2
at foundation level.
This much low stress will not cause any considerable settlement in subsequent layers,
hence calculation for consolidated settlement is done upto depth = 11.00 m only.
Layer information
Layer 1 (From depth 2.00 to 5.00 m )
Calculation of stresses
Stresses at center of layer 1 according to
IS:8009 (part 1) cl. 8.3.6, equation (B 1) { }
Density of soil ϒ = 1.791 t/m3
Net pressure at base = 6.42 t/m2
Mid depth at center of layer = 3.5 m
Overburden pressure at mid depth = 6.0825 t/m2
Area at base = 9 m2
Net load at base = 57.762 tonnes
Increase in pressure at mid depth as per above equation бz= 2.25251527363 t/m2
Calculation of settlement
Compression index = Cc = 0.189
Initial void ratio = eo = 0.69
Depth of compressible layer = H c = 3.00 m
Consolidated settlement = S = (Cc/(1+eo))*Hc*log10 [(Po+∆p)/Po]
S1 (m) = 0.045905 m
S1 (mm) = 45.90495 mm
Rigidity correction factor = 0.8
Depth correction factor = 0.8
Corrected settlement for layer 1 = S 1 = 29.37917 mm

Layer information
Layer 2 (From depth 5.00 to 8.00 m )
Calculation of stresses
Stresses at center of layer 1 according to
IS:8009 (part 1) cl. 8.3.6, equation (B 1) { }
Density of soil ϒ = 1.822 t/m3
Net pressure at base = 6.42 t/m2
Mid depth at center of layer = 6.5 m
Overburden pressure at mid depth = 11.502 t/m2
Area at base = 9 m2
Net load at base = 57.762 tonnes
Increase in pressure at mid depth as per above equation бz= 0.65309614442 t/m2
Calculation of settlement
Compression index = Cc = 0.225
Initial void ratio = eo = 0.71
Depth of compressible layer = H c = 3.00 m
Consolidated settlement = S = (Cc/(1+eo))*Hc*log10 [(Po+∆p)/Po]
S2 (m) = 0.009468 m
S2 (mm) = 9.467777 mm
Rigidity correction factor = 0.8
Depth correction factor = 0.8
Corrected settlement for layer 2= S 2 = 6.059377 mm

Layer information
Layer 3 (From depth 8.00 to 11.00 m )
Calculation of stresses
Stresses at center of layer 1 according to
IS:8009 (part 1) cl. 8.3.6, equation (B 1) { }
Density of soil ϒ = 1.864 t/m3
Net pressure at base = 6.42 t/m2
Mid depth at center of layer = 9.5 m
Overburden pressure at mid depth = 17.031 t/m2
Area at base = 9 m2
Net load at base = 57.762 tonnes
Increase in pressure at mid depth as per above equation бz= 0.30574307038 t/m2
Calculation of settlement
Compression index = Cc = 0.252
Initial void ratio = eo = 0.68
Depth of compressible layer = H c = 3.00 m
Consolidated settlement = S = (Cc/(1+eo))*Hc*log10 [(Po+∆p)/Po]
S3 (m) = 0.003477 m
S3 (mm) = 3.477314 mm
Rigidity correction factor = 0.8
Depth correction factor = 0.8
Corrected settlement for layer 3 = S 3 = 2.225481 mm

Total settlement for all layers = S1 + S2 + S3 = 37.66 mm


37.66 mm which is less than 40 hence, ok
Recommended safe bearing capacity based on settlement criteria is = 10 t/m2