Professional Documents
Culture Documents
B= 3
qn (tonnes)= 57.762 depth = 2.00 m
ϒb = 1.698 t/m3
Layer information
Layer 2 (From depth 5.00 to 8.00 m )
Calculation of stresses
Stresses at center of layer 1 according to
IS:8009 (part 1) cl. 8.3.6, equation (B 1) { }
Density of soil ϒ = 1.822 t/m3
Net pressure at base = 6.42 t/m2
Mid depth at center of layer = 6.5 m
Overburden pressure at mid depth = 11.502 t/m2
Area at base = 9 m2
Net load at base = 57.762 tonnes
Increase in pressure at mid depth as per above equation бz= 0.65309614442 t/m2
Calculation of settlement
Compression index = Cc = 0.225
Initial void ratio = eo = 0.71
Depth of compressible layer = H c = 3.00 m
Consolidated settlement = S = (Cc/(1+eo))*Hc*log10 [(Po+∆p)/Po]
S2 (m) = 0.009468 m
S2 (mm) = 9.467777 mm
Rigidity correction factor = 0.8
Depth correction factor = 0.8
Corrected settlement for layer 2= S 2 = 6.059377 mm
Layer information
Layer 3 (From depth 8.00 to 11.00 m )
Calculation of stresses
Stresses at center of layer 1 according to
IS:8009 (part 1) cl. 8.3.6, equation (B 1) { }
Density of soil ϒ = 1.864 t/m3
Net pressure at base = 6.42 t/m2
Mid depth at center of layer = 9.5 m
Overburden pressure at mid depth = 17.031 t/m2
Area at base = 9 m2
Net load at base = 57.762 tonnes
Increase in pressure at mid depth as per above equation бz= 0.30574307038 t/m2
Calculation of settlement
Compression index = Cc = 0.252
Initial void ratio = eo = 0.68
Depth of compressible layer = H c = 3.00 m
Consolidated settlement = S = (Cc/(1+eo))*Hc*log10 [(Po+∆p)/Po]
S3 (m) = 0.003477 m
S3 (mm) = 3.477314 mm
Rigidity correction factor = 0.8
Depth correction factor = 0.8
Corrected settlement for layer 3 = S 3 = 2.225481 mm