Project: Six Laning of Narasannapeta – Ranastalam Section of NH-16 (Old NH-5) from design Km.580+671 (existing Km.580.

700) to design Km. 632+861


(Existing Km.634.000). Design Length – 54.19 Km.) in the State of Andhra Pradesh under NHDP Phase-V on Hybrid Annuity Mode.

A. Reference:- LVUP at Km 613+880

Sl. Compliance by Design Consultant


Observations on LVUP_613+880
No.
Kindly mention in revision box about change of proposal with Noted and incorporated in revised drawings
1
reference letter No.
Kindly ensure the protection of raft foundation of Box Structure while Protection of raft foundation of Box Structure is ensured while doing
2 doing excavation for wing wall, since foundation level of wing wall is excavation for wing wall.
deeper than the existing raft foundation of box structure of LVUP.
Kindly submit the plan to verify the wall nomenclature of W1, W2, W3 Noted and incorporated in revised drawings
3
and W4
Kindly Update the elevation of retaining wall as per approved plan and Elevation is updated with approved plan and profile but we have mention
4
profile by mentioning the service road/ground levels. the retaining wall top levels and PCC top levels.
Kindly provide the termination details of retaining wall at Ch.613+700, There is service road in this TCS. Retaining wall is terminated as per
5
as per plan and profile FRL – GL which is around 3m. Service road levels and hence it is not prudent to compare with OGL.
Kindly correct the elevation as per RHS and LHS carriageway of Noted and incorporated in revised drawings
retaining wall. From Ch.613+700 to Ch.613+790 it is shown RHS
6
carriageway and from Ch.613+790 to Ch.613+900 it is shown LHS of
carriageway of retaining wall.
Kindly show in elevation all the CD structure as per approved plan and Noted and incorporated in revised drawings
7
profile and schedule
Kindly submit the detailed design report with Geotech report to verify Design and drawings of retaining wall have already been approved by
8 the SBC for retaining wall foundation. your good office. Geotech reports at various locations for the entire
project are also submitted and approved.
Weep hole shall be provided in the retaining wall Noted and incorporated in revised drawings
9

Expansion joint shall be provided in the retaining wall as per Noted and incorporated in revised drawings
10
IS:456:2000 CL 27.2
11 Side slope of fill shall be kept 1:2 as per the embankment slope. There is ROW constraint at site and hence side slope of fill is kept 1:1.5m
Kindly revise the proposal and submit the detailed design for further Noted
12
review.