You are on page 1of 1

Water Supply System Diagram

Sc.1:50
W 3, 4 & 5 W 6, 7 & 8

Ø25

Ø25

Fire Fighting Water SH

KS
S2 Supply System Diagram 80
Ø100 Down F/A Sc.1:50 +12.10
LWH Ø25

25
Ø150 Ø100 Down T/B Ø25
Ø25 Down F/A Ø150

Ø
Ø25 Down T/B
Ø100 Ø100 HS HWB

25
Ø25 Ø25 Ø65 10m³ Water Tank 10m³ Water Tank Ø50
Ø25

Ø
25
M2 M3 M4 Ø40 WC

Ø
Ø25
Ø25
Ø32 Down F/A

Ø40
Ø65
TOILET TOILET TOILET
W7
+14.30 SH
CERAMICTILE F.F
HS HS
CERAMICTILE F.F HS
CERAMICTILE F.F
(Pump V) Ø63 Ø40
CORRIDOR CORRIDOR
Diesel Pump
TERRAZZO TILE F.F
KS
Ø100 Up T/A
TERRAZZO TILE F.F
Ø63 F.EXT,
80
FH 4
Pump I +9.90

Ø50
Ø100 Down T/B LWH Ø25

25
Ø80 Ø25
(Pump IV)

Ø
S 3 FD Ø63 Pump II FOURTH FLOOR
Jockey Pump +12.80 HS HWB

Ø80

25
Ø
Ø63 Ø25

25
WC

Ø
Ø25
S1 Ø50
Ø150 Ø100 Down F/A +11.10 SH
Ø100 Down T/B CORRIDOR Ø63
Ø150
TERRAZZO TILE F.F KS
Ø100 Up T/A F.EXT,
S 7 Ø100 FH 4
80
Ø100 Down T/B LWH +6.70 Ø25
Ø100 Up T/A Ø150 M5 Ø25

25
Ø25

Ø
Ø100 Down T/B
THIRD FLOOR
Ø32 Down F/A +9.60 HS HWB

25
Ø25

Ø
25
SHOP W7 M6 WC

Ø
TOILET
HS Ø25
PVC TILE F.F
Ø63 Ø50

Ø40 +7.90 SH
OFFICE Ø40
PVC TILE F.F KS
F.EXT,
80
FH 4 +3.50
VERENDAH LWH Ø25
FH 1 25 Ø25
TERRAZZO TILE F.F
Ø
F.EXT SECOND FLOOR
HS HWB

25
+6.40

Ø
25
Ø40 WC

Ø
M1
Ø25
ENTRANCE LOBBY
TERRAZZO TILE F.F
W 1 W 2
+4.70 FRIST FLOOR
Ø150
+3.50
F.EXT,
CAFE FH 4
PVC TILE F.F
TERRAZZO TILE F.F Ø50
Ø32 Ø32
FIRST FLOOR
+3.20

VERENDAH Ø32 Ø32 Ø32 Ø32


TERRAZZO TILE F.F

+1.50 GROUND FLOOR WC WC WC WC


HS HS HS HS
F.EXT, +0.40
FH 3
Ø100 Up T/A
VERENDAH Ø100
VERENDAH Down T/B
Ø50

80
TERRAZZO TILE F.F TERRAZZO TILE F.F
S 8

Ø
GROUND FLOOR
± 0.00
GROUND FLOOR PLAN Ø150

Sanitary Installation M8 M7
Date Revision Signature

Sc 1:50
Project:
MIXED USE BUILDING

TITLE DEED NO.:

Owner:
ENE ALEMITU GELEMO

Location: CITY Kebele House No


Gonder 18 --

SN
Dwg Title: Roof plan Sanitary Installation
Fire Fighting System & Details

Des. by:

Drawn By:
01
Checked by: 03
Date:
Scale: 1:50, 1:100 June ,2020

You might also like