Cross Section
566
564
562
560
558
556
-65 -55 -45 -35 -25 -15 -5 5 15 25 35 45 55 65
OD STATE, LOT-03
Bridge at Chainage km. : 227+649 (MJBR)
AT UP STREAM AT 350M
566
564
562
560
558
-60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
OD STATE, LOT-03
Bridge at Chainage km. : 227+649 (MJBR)
AT BRIDGE SITE
Wetted
Relative Distance Offset Area(A) Perimetre
NSL ((m))
Di t
Distance ((m)) ( )
(m) ( )
(m) ( ²)
(m²) (P)
(m)
‐84.6607 562.765 12.997
‐71.6635 563.717 4.576
‐67.0878 563.742 7.545 0.00
‐59.5427 563.458 4.295 0.27 1.00 7.55
‐55.248 561.982 12.062 1.74 4.31 4.54
‐43.1861 562.019 12.059 1.71 20.79 12.06
31.1271
‐31.1271 561.814 10.353 1.91 21.80 12.06
‐20.7744 561.241 11.022 2.48 22.74 10.37
‐9.7526 560.786 9.753 2.94 29.87 11.03
0 560.126 10.721 3.60 31.87 9.77
10.7205 559.733 7.037 3.99 40.68 10.73
17.7575 558.863 3.535 4.86 31.15 7.09
21.2928 558.439 6.638 5.29 17.93 3.56
27.9311 557.954 5.470 5.77 36.69 6.66
33.4007 558.581 2.735 5.14 29.84 5.51
36.1355 559.256 0.630 4.47 13.14 2.82
36.7656 560.215 1.808 3.51 2.51 1.15
38.5739 561.134 1.751 2.59 5.51 2.03
40.3248 562.313 2.893 1.41 3.50 2.11
43.2176 563.656 1.729 0.07 2.14 3.19
44.9466 564.18 13.426 0.00 0.06 1.73
58.3724 564.278 15.864
74.2368 564.252 22.982
97.2185 564.248
Sum 315.55 113.95
Cross Section
564
562
560
558
556
-80 -60 -40 -20 0 20 40 60
OD STATE, LOT-03
Bridge at Chainage km. : 227+649 (MJBR)
AT DOWNSTREAM AT 350M
Wetted
Relative NSL Distance Offset Area(A) Perimetre
Distance (m) (m) (m) (m) (m²) (P)
(m)
‐58.2039 565.275 11.1595
‐47.0444 564.993 9.2299
‐37.8145 565.957 5.1329
‐32.6816 563.713 7.9421 0.00
‐24.7395 561.933 2.9194 1.67 6.64 8.12
‐21.8201 560.576 1.1463 3.03 6.86 3.22
‐20.6738 560.681 2.9206 2.92 3.41 1.15
‐17.7532 559.711 2.821 3.89 9.95 3.08
‐14.9322 558.559 5.1269 5.05 12.61 3.05
‐9.8053 558.049 5.8976 5.56 27.17 5.15
‐3.9077 557.645 3.9077 5.96 33.95 5.91
0 556.845 6.8132 6.76 24.85 3.99
6.8132 556.407 6.3333 7.20 47.54 6.83
13.1465 558.207 2.9265 5.40 39.88 6.58
16.073 559.338 2.7877 4.27 14.14 3.14
18.8607 560.458 2.9484 3.15 10.33 3.00
21.8091 561.8 6.3097 1.80 7.30 3.24
28.1188 562.787 7.344 0.82 8.27 6.39
35.4628 564.659 6.0342 0.00 3.00 7.39
41.497 566.154
Sum 255.90 62.84
Cross Section
566
564
562
560
558
556
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
Bridge at Chainage km. : 227+649 (MJBR)
AT DOWNSTREAM AT 350M
Highest
g Flood Level = 563.494 m
Lowest Bed Level = 557.700 m
Rugosity Co-efficient = 0.040
Wetted
Relative NSL Distance Offset Area(A) Perimetre
Distance (m) (m) (m) (m) (m²))
(m (P)
(m)
‐112.9996 564.000 5.978
‐107.0212 563.459 8.987
‐98.0338 563.525 14.732
‐83.3019 563.542 9.495
‐73.8066 563.500 7.307 0.00
‐66.5 562.800 6.300 0.69 2.54 7.34
60.2
‐60.2 562.190 8.100 1.30 6.29 6.33
‐52.1 561.67 6.454 1.82 12.67 8.12
‐45.6461 561.21 11.046 2.28 13.26 6.47
‐34.6 560.564 9.125 2.93 28.80 11.06
‐25.4753 560.145 14.675 3.35 28.65 9.13
‐10.8 559.4 10.800 4.09 54.61 14.69
0 557.7 17.660 5.79 53.40 10.93
17.6602 559.411 14.761 4.08 87.21 17.74
32 4213
32.4213 560 9
560.9 11 930
11.930 2 59
2.59 49 28
49.28 14 84
14.84
44.3517 561.67 5.648 1.82 26.35 11.96
50 561.82 0.614 1.67 9.88 5.65
50.6139 561.93 8.286 1.56 0.99 0.62
58.9 562.5 6.047 0.99 10.60 8.31
64.9469 562.75 11.902 0.74 5.25 6.05
76.8486 563.423 16.670 0.07 4.85 11.92
93.5187 563.574 9.510 0.00 0.59 16.67
103.0282
103 0282 563.543
563 543 14.175
14 175
117.2027 564.000
Sum 395.22 167.84
564
562
560
558
556
-120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120
CALCULATION OF DESIGN DISCHARGE
Chainage at km. : 227+649 (MJBR)
D I S C H A R G E C A L C U LA T I O N S
3/4
Q= CM = 15 x 44.120 = 661.80 Cumec
P = 0.6
f = 0.680
A = 15590 Hectare
L = 33.332 km
H = 248.000 m
tc = 6.837 hr
Io = 56 mm
DESIGN DISCHARGE (As per clause no. 6.2.1, IRC SP 13 2004) = 992.70 Cumec
SCOUR CALCULATION BY USING LACEY'S EQUATION
Chainage km. : 227+649 (MJBR)
FOR ABUTMENT
Maximum Depth of Scour for Abutment = 1.27 x dsm = 5.370 m
Grip length = 1.790 m
Maximum Scour Level for Abutment = 558.354 m
FOR PIER
Maximum Depth of Scour for Pier = 2.0 x dsm 8.457 m
Grip length = 2.819 m
Maximum Scour Level for Pier = = 555.267 m
If the waterway is restricted as per Clause 106.5.2 of IRC:5-2015, it will cause afflux at the
bridge site and the designed HFL will raised accordingly.Afflux shall be calculated by using
any suitable method based on conservation of energy or momentum. In absence of any
rigorous method, afflux may be calculated using Molesworth formula as below:
H = ((V2/17.88)+ 0.015) x ((A/a)2-1))
where, H = afflux in m
V =