PEKERJAAN PEMBANGUNAN 3 LINE BAY GI 150 KV SUKATANI GOBEL 1 LB ARAH MULTISTRADA DAN 2 LB ARAH FAJARSURYA
No. Kontrak : 0118.PJ/DAN.02.02/UIP JBT II/2016
PT. WISMA SARANA TEKNIK
Chart Title
2016 2017 2018
Item Equipment And Material Description Quantity BOBOT
DES JAN FEB MAR APR MEI JUN JUL AGU SEP OKT NOV DES JAN FEB MAR APR MEI
1 3
I Station level
II Bay level untuk 150kV double busbar
Panel 3 KWH ( Panel ini untuk semua KWH yang akan dpasang) Lot 3 3.461% 1.731% 1.731%
Ethernet switch 40.000%
Kabel untuk panel dan LV Kabel Kontrol.
4 Bay Line : GI. Multistrada, lot 1 2.220% 1.110% 1.110%
Bay Line : GI Fajarsurya (1,2) lot 2 4.440% 2.220% 2.220%
5 Common Lot 3 1.232% 0.616% 0.616%
Panel
Ethernet switch per panel
IED I/O
6 TP Independent Digital (64 kbps / 2 Mbps) bh 2 1.027% 0.513% 0.513%
'8 command (arah GI Fajarsurya )
Terintegrasi dengan MUX di GI - GI yang berpasangan
7 Mengintegrasik an ke Remote Station / RTU /SOGI Existing (ada surat duk ungan dari vendor terkait)
Bay level 150 kV ke SOGI / RTU di GI. Bay 3 3.327% 1.663% 1.663%
IX Factory Acceptance Test di Indonesia menggunakan sistem SOGI, RTU yang akan dioperasik an
Jumlah hari orang HO 28 2.824% 2.824%
Ditanggung vendor : transportasi, konsumsi, hotel
100.000% 0.291% 1.761% 2.089% 6.858% 4.297% 3.294% 12.664% 12.078% 15.638% 9.376% 7.853% 1.257% 1.257% 1.199% 7.655% 9.921% 1.257% 1.257%
RENCANA PROGRESS KOMULATIF 0.291% 2.052% 4.141% 10.999% 15.297% 18.590% 31.254% 43.332% 58.969%
Series1 Series268.345% 76.198% 77.455% 78.712% 79.911% 87.566% 97.487% 98.743% 100.00%
AKTUAL PROGRESS BULANAN 0.000% 0.000% 0.000% 0.000% 0.094% 0.290% 0.298% 0.565% 1.327% 2.720% 3.799% 4.738% 11.281% 11.304% 11.311%
PT PLN (Persero ) UNIT INDUK PEMBANGUNAN JBT II Diperiksa Jakarta 28 feburari 2018
UNIT PELAKSANA PROYEK JJBT 2 PT. PLN (Persero) Dibuat oleh :
RENCANA PROGRESS KOMULATIF PUSMANKON PT. WISMA SARANA TEKNIK
AKTUAL PROGRESS BULANAN