PEP shall include as a minimum information about the intended use of:
o Project Execution Plan (with minimum Table of Contents)
§ Introduction
· Project Description
· Scope Summary
· Key Performance Indicators
· Document Hierarchy
§ Management Structure and Project Team
· Project Team
· Roles and Responsibilities
· Subcontracts
§ Critical Decisions
· Long Lead Items
· Authorizations / Permits
§ Baselines
· Scope Baseline
· Schedule Baseline
· Cost Baseline
· Change Control
§ Project Management/Execution
· Project Reporting
· Project Performance
· Risk Management
· HSSE
· Safety Design
· Hazard Analysis
· Value Engineering
· Document Control & Records Management
· Procurement
· Integration with Technology Provider
· Project Close out
§ Systems
· Project Management System
· ERP System
· Planning System & Procedure
· Cost Control System & Procedure
· Document Control System & Procuredure
· Construction Management (for EPCM only)
· QA QC System
· Inspection Test Records and Inspection Test Plans (for EC
· Process to Mechanical Completion & RFSU (for EPCM on
· Material Handling/Inspection/ and Logistics
· Procurement System & Procedure incl sample Bid Packag
Management
r EPCM only)
Bidders to provide these milestone dates here and shall show these in their surbmitted schedule. Additionally, Bidder shall c
schedule provided by Company for reference.
Must Finish by date. Should the contractor be able to complete earlier, this will be considered in the evaluation.
owever for purposes of comparison the Bidder shall develop its schedule with a contract award date as mentioned.
he evaluation.
Kindly complete the table below and attach CVs for your proposed key personnel. The key personnel are subject to approva
Bidder to submit proposed project organization chart.
b) BIDDER will show total capacity and resources to be made available for the execution of the Contract.