You are on page 1of 2

1520 mm

1065mm 455mm

550mm 700mm
700mm 455mm

400mm

1220 mm

2550

2.95 m

150

700 1220 1.7 m


1550 1850
A426 MASTER BATH

150

150 2800 150


700
3100

Amount
Item Description Qty Unit Rate ZW ZW
A Excavation in soft material for
foundation trenches 3.429 m3

B Backfilling around foundations 1.0665 m3


wuth previously excavated
material

C filling to make up for levels 0.365025 m3

D Hardcore filling and compating 0.912563 m3

E Disposal of extra material 1.997475 m3


excavated naterial

F Anti-termite treatment 19.28 m2

G Polythene sheeting on fine 5.336 m2


sand

H 150mm thick floor bed/ slab 0.968625 m3

I Strip foundations 0.5715 m3

J Brickwork 6.0375 m2 120

K Plaster to plinth 6.0375 m2

L Bituminous paint tp plinth 6.0375 m2

SUPERSTRUCTURE

Brickwork 14.4625 m2 285 No. brks


405