COROWA SALE YARDS REDEVELOPMENT CONCEPT PLAN
DRAWN: TS
FEDERATION COUNCIL TITLE PAGE DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 01
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
80M OF NEW SIDE ROAD TO CONNECT TRUCK WASH WITH
MAIN CIRCULAR ROADWAY HARDSTAND AREA FOR TRUCK
AND TRAILER PARKING
SHEET 13
DRAWN: TS
FEDERATION COUNCIL GENERAL ARRANGEMENT DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 02
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
95
.0 ROOF AREA (19,000M2)
m
m
.0
180
4.5m x 132m SLAB EXTENSION
TO BE COMPLETED UNDER
ELEVATION 1 (SHEET 05) SEPARATE BUDGET.
m
.0
132
53
.9
m
64
.1
m
m
.0
36
DRAWN: TS
FEDERATION COUNCIL COLUMN AND ROOF PLAN DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 03
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
“SAW TOOTH” ARRANGEMENT ALLOWING
VENTILATION AT SOUTHERN END OF EACH 12M SPAN
PROPOSED ROOF TO COVER EXISTING
EXTENT OF CONCRETE SLAB AND NEW PREFERENCE FOR OPEN WEB TRUSS BEAMS TO
CONCRETE SLAB EXTENSION ON SE REDUCE WEIGHT AND ALLOW THE USE OF
SIDE. 19,000m2 APPROX. EXTERNALLY SITED MOBILE CRANE AS MOVEMENT
ON THE SLAB WILL BE LIMITED BY THE EXISTING
SHEEP PENS
5.5 m (TYP.)
ADDITIONAL 4.5M WIDE X 132M LONG
CONCRETE SLAB AND PENS CONSTRUCTED
UNDER COUNCIL’S 2019/20 CAPITAL BUDGET
CONCRETE PIER WITH UPSTAND
TO PROTECT COLUMNS FROM
ANIMAL EFFLUENT
DRAWN: TS
FEDERATION COUNCIL ROOFING DETAILS - ISOMETRIC DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 04
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
12.0 m
NOTES:
ROOF AREA COMPRISES AROUND 105 BAYS WITH AN AVERAGE AREA OF 180m2
AVERAGE HEIGHT, AROUND 6m. 4 ROOF SHEETS IN EACH BAY SUBSTITUTED
FOR CLEAR SHEETING
DRAWN: TS
FEDERATION COUNCIL STRUCTURE DETAILS - ISOMETRIC RENDER DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 06
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
48m x 7.7m WIDE TRUCK WASH BAY
(EQUAL SIZE TO EXISTING)
RAINWATER/BUFFER TANKS COULD BE USED TO
SERVICE TRUCKWASH
DRAWN: TS
FEDERATION COUNCIL TRUCK WASH DETAIL DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 07
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
CCTV CAMERA POLE
AND LIGHTING
18.0
m
3.0 m
DRAWN: TS
FEDERATION COUNCIL WEIGH BRIDGE DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 08
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
MULTI-PURPOSE LEARNING CENTRE
200m2 TOTAL FLOOR AREA WITH 100m2 OF FORMALISE EXISTING GRAVEL
OFFICE AND TEACHING SPACE PLUS 100m2 CARPARK WITH 2-COAT SEAL,
OF OPEN INDUSTRIAL SPACE. BUILDING LINE MARKING, PERIMETER
STYLE INDICATIVE ONLY. BARRIER KERB AND WHEELSTOPS.
DRAWN: TS
FEDERATION COUNCIL MULTI-PURPOSE LEARNING CENTRE & CARPARK DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 09
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
8NO. 100kL COLORBOND STEEL TANKS ON SAND BED AND RAISED PAD.
TANKS CONNECTED TO NEW ROOF. ALLOWANCE FOR ADDITION OF
ADDITIONAL TANKS IN THE FUTURE IF SPACE PERMITS
800m2 APPROX
UNDERBORING FOR CONNECTING
PIPEWORK MAY BE REQUIRED TO
AVOID DISTURBANCE OF SLABS
DRAWN: TS
FEDERATION COUNCIL WATER STORAGE DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 10
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
* ROOF SIZE WILL ALLOW FOR AT LEAST 1MW OF SOLAR 100kW PV SYSTEM
* SOLAR PV > 100kW REQUIRES SIGNIFICANT INVESTIGATION, (DRAWN GENERICALLY)
REGULATION HURDLES, POWER PURCHASE AGREEMENTS ETC
* POWER CONSUMPTION AT THE SITE IS CURRENTLY IN THE
ORDER OF 80 - 100MWH WHICH COULD BE MET BY A 100KW
SYSTEM
DRAWN: TS
FEDERATION COUNCIL SOLAR PV SYSTEM DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 11
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
TOTAL ROOF POTENTIAL = >1MW.
POTENTIAL ENGERY PRODUCTION = 1,460MWH/YEAR
100kW
100kW
80kW
100kW
100kW
100kW
100kW
100kW
100kW
100kW
DRAWN: TS
FEDERATION COUNCIL SOLAR PV POTENTIAL DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 12
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
REAR DRAINAGE
40 m
CONSTRUCT NEW SUBSURFACE
DRAINAGE IN LIUE OF
EXISTING TABLE DRAIN
44 m
DRAWN: TS
FEDERATION COUNCIL TRUCK AND TRAILER PARKING PLAN DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 13
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
43m
39m
DRAWN: TS
FEDERATION COUNCIL TRUCK AND TRAILER PARKING DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 14
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
MULTI-PURPOSE LEARNING CENTRE
DRAWN: TS
FEDERATION COUNCIL PROJECT RENDER - VIEW 1 DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 15
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
DRAWN: TS
FEDERATION COUNCIL PROJECT RENDER - VIEW 2 DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 16
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
ELECTRICAL HUT FOR INVERTERS
DRAWN: TS
FEDERATION COUNCIL PROJECT RENDER - VIEW 3 DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 17
Tim Shilling | 12p Consulting | Albury NSW | m: 0448 647 294 | e: tim@12p.consulting | w: 12p.consulting
DRAWN: TS
FEDERATION COUNCIL PROJECT RENDER - VIEW 4 DATE: February 3, 2020
COROWA SALEYARDS REDEVELOPMENT CONCEPT VERSION: 3.1 [FINAL] ::: SHEET 18