1 Podium Cost
2 Main Building
a) Superstructure- PVC Area
b) Superstructure - Residential Area
c) Balcony
d) Substructure Over Tunnel
e) Substructure Over Bus Interchange
f) Substructure Over Podium
3 External Works
a) Allowance For E.O. Preliminaries
b) Allowance For E.O. Pool Area
c) Allowance For E.O. Tree Pits
5 Specialist Works
a) Roofscape and Screening
b) Roof Garden
c) Angel Roof
d) Item for External Works
e) Site Requirements
Total
(Excluding ID Fitting Out Works, Contigencies & Cost Escalation)
Cost per ft2 of CFA
6
7 Contigencies(Allowance at %)
Total for Item 1 to 7(Incl Contigencies but Excl Cost Escalation)
General comment:-
1) the format of how you present the cost need to improve. Pls refer to the stand
2) take note on all the EO items. It should not park it in CFA.
3) The overall cost estimate is not complete.
4) I did not help you to check whether you have transfer all the items from cost da
5) I do not check on arithematical error
DATE:???
ITEM
CFA (m2) 5,000 1887.86 9,439,300.00
CFA (m2) 5,000 1014.16 5,070,800.00
ITEM
CFA (m2) 8,000 3073.31 24,586,480.00
CFA (m2) 2,000 1012.37 2,024,740.00
CFA (m2) 1,000 1577.07 1,577,070.00
CFA (m2) 2,000 974.49 1,948,980.00
ITEM
ITEM
CFA (m2)
GFA (ft2)
CFA (m2)
the items from cost data into the summary page. This is your responsibility to check.
COST DATA SHEET 1
Roofscape and screening (the screening for the skyroof “false roof” for
5 Year 2016 Q2
landscaping/leisure area) 2000 m2, Rate RM1000/m2
Comments:-
1) You may need to show how you adj the rate. Where is the formula?
2) where did u get the sources (current index) from? You need to state it
may be under remarks column or….
Pls take note, I do not check on arithematical error. You need to check it
3) by yourself. My comments mostly on the content and the way you
present the cost.
Analysed Unit Base Index Current Index Adjusted Cost
2,000.00 166.5 171.9 2064.87
500.00 172.0 171.9 499.71
1,000.00 169.8 171.9 1012.37