JOB NO : GROUP ASSIGNMENT 1 TAKER OFF : WILLIAM KHOO WEI LUN

JOB TITLE : DOUBLE STOREY END LOT TERRACE HOUSE AT JALAN IPOH, 51200 KUALA LUMPUR.
ELEMENT : NO. 8 INTERNAL WALLS DATE : 8/10/2020
INTERNAL WALL
MEASUREMENT OF FIRST (Bedroom 1
FLOOR INTERNAL WALLS 5Ac
Half Brickwall E

H.bwl in c.b. in c&s.(1:6) Bd 1


mort. laid in stret. bond
w.&inclu. brick reinf. at every
4th course, non-load bearing. C

(Master Bedroom 4.55 (C-E/5Ac


7 4Ac 2.65 12.06 Height
C F.F.L. 3.050
MB Less beam 0.400
B 2.650

Length
4.76 (C/4Ac-7 3.300
2.85 13.566 Height 1.350
3.250 Less 4.650
Less beam 0.400 h.bwl 0.103
2.850 4.547

Length (Bedroom 2
1.850 ###
2.550 5Ac
0.475
Less 4.875
h.col 1/2 0.125 0.063 Bd 2
h.h.bwl. 1/2 0.103 0.051
4.761 D

(B-C/4Ac (D/4-5Ac
Height 2.95 Height
2.93 3.250 2.65 7.82 3.050
3.25 9.53 Less beam 0.400
Length 2.650
1.050
2.010 Length
Less 3.060 1.700
h.col 1/2 0.150 0.075 0.250
h.h.bwl. 1/2 0.103 0.051 1.150
2.934 Less 3.100
h.bwl 0.103
h.h.bwl 1/2 0.103 0.051
2.946
JOB NO : GROUP ASSIGNMENT 1 TAKER OFF : WILLIAM KHOO WEI LUN
JOB TITLE : DOUBLE STOREY END LOT TERRACE HOUSE AT JALAN IPOH, 51200 KUALA LUMPUR.
ELEMENT : NO. 8 INTERNAL WALLS DATE : 8/10/2020
MEASUREMENT OF FIRST
FLOOR INTERNAL WALLS (Bath 2
CON'TD 6 ###

(Master Bath
Bath 2
5Aa ### E3
B E

A M.Bath 2.55 (E/5-6


2.38 6.07 Height
2.375
(A-B/5Aa
1.24 Height Length
2.85 3.54 3.250 2.550
Less beam 0.400
2.850 (E-E3/5
0.60 Height
Length 2.38 1.43 2.375
Less 1.355
h.col 1/2 0.125 0.063 Length
h.h.bwl. 1/2 0.103 0.051 0.600
1.241
(DDT Openings
(B/4-5Aa
1.77 Height 3 0.90 (TD01
2.55 4.52 2.550 2.10 5.67

Length 3 1.11 (Lintel TD01


0.825 0.25 0.84
0.200 Height
0.200 0.250
0.650
Less 1.875 Length
h.bwl 0.103 0.900
1.772 Add 2/ 0.103 0.206
1.106

3 0.80 (TD02A
2.10 5.04

3 1.01 (Lintel TD02A


0.25 0.76
Height
0.250
Length
0.800
Add 2/ 0.103 0.206
1.006
JOB NO : GROUP ASSIGNMENT 1 TAKER OFF : WILLIAM KHOO WEI LUN
JOB TITLE : DOUBLE STOREY END LOT TERRACE HOUSE AT JALAN IPOH, 51200 KUALA LUMPUR.
ELEMENT : NO. 8 INTERNAL WALLS DATE : 8/10/2020
MEASUREMENT OF FIRST
FLOOR INTERNAL WALLS One Brick Wall (Party Wall)
CON'TD
1 bwl. in c.b. in c&s. (1:6)
mort. laid in Eng. bond w&
(DDT Openings incl. brick reinf. at every 4th
course, non-load bearing.
(Stiffener
(A3-E3/4 - F.F.
0.13 (D/5Ac ###
2.65 0.35 E3

0.13 (C/5Ac F.F


2.85 0.38
A3
0.13 (B/4Ac 3.05 Height
2.55 0.34 10.82 33.00 F.F.L. 3.050
45.156 Total Area
Length
0.300
0.350
0.325
1.355
3.060
1.350
3.300
0.225
0.450
Add h.bwl 0.103
10.818

(A3-E3/4 - R.L.
1⁄2 Height
3.05 1.250
10.82 16.50
49.50 Length
0.300
0.350
0.325
1.355
3.060
1.350
3.300
0.225
0.450
Add h.bwl 0.103
10.818

JOB NO : GROUP ASSIGNMENT 1 TAKER OFF : WILLIAM KHOO WEI LUN


JOB TITLE : DOUBLE STOREY END LOT TERRACE HOUSE AT JALAN IPOH, 51200 KUALA LUMPUR.
ELEMENT : NO. 8 INTERNAL WALLS DATE : 8/10/2020
MEASUREMENT OF FIRST
FLOOR INTERNAL WALLS 12mm Dia. H.t. steel rod
CON'TD reinf. In straight and bend
Stiffener bars in isol. stiffener.
(D/5Ac
125mm x 125mm x 2.65m
1 high reinfd. In-situ conc 2 3.80 7.60 Length
1 Grade 20 in isol. stiffener. 2.650
(D/5Ac Add beam 0.400
Height 0.600
3.050 3.650
Less bea 0.400 Less c.c. 2/0.025 0.050
2.650 3.600
Add 2 bends 2/0.100 0.200
Volume 3.800
0.125x0.125x2.650 = 0.041
2 3.75 7.50 Length
15.10 2.650
125mm x 125mm x 2.85m
1 high reinfd. In-situ conc Add slope 2/0.450 0.900
1 Grade 20 in isol. stiffener. 2 bends 2/0.100 0.200
(C/5Ac 3.750
Height
3.250 (C/5Ac
Less bea 0.400 2 3.56 7.12 Length
2.850 2.850
Add beam 0.400
Volume slab 0.150
0.125x0.125x2.850 = 0.045 3.400
Less c.c. slab 0.02
c.c. beam 0.025
125mm x 125mm x 2.55m
1 high reinfd. In-situ conc 3.355
1 Grade 20 in isol. stiffener. Add 2 bends 2/0.100 0.200
(B/4Ac 3.555
Height
2.550 2 4.01 8.02 Length
15.14 2.850
Volume Add beam 0.400
0.125x0.125x2.550 = 0.040 slab 0.150
3.400
Formwork to sides of isol. Less c.c. slab 0.02
stiffener c.c. beam 0.025
4 0.13 (D/5Ac 3.355
2.65 1.38 Add 2 bend 2/0.100 0.200
slope 0.450
4 0.13 (C/5Ac 4.005
2.85 1.49

4 0.13 (B/4Ac
2.55 1.33
4.20 Total Formwork
JOB NO : GROUP ASSIGNMENT 1 TAKER OFF : WILLIAM KHOO WEI LUN
JOB TITLE : DOUBLE STOREY END LOT TERRACE HOUSE AT JALAN IPOH, 51200 KUALA LUMPUR.
ELEMENT : NO. 8 INTERNAL WALLS DATE : 8/10/2020
MEASUREMENT OF FIRST
FLOOR INTERNAL WALLS 2 1.29 2.58 Average Length
CON'TD scale 2/0.476 0.952
(B/4Ac Add 2/0.125 0.250
Length 1.202
2 3.26 6.52 2.550 Less c.c. 4/0.025 0.100
Add beam 0.550 1.102
3.100 Add hook 24(8) 0.192
Less c.c. beam 0.025 1.294
c.c. wall 0.015
3.060 2 1.78 3.56 Long Length
Add 2 bend 2/0.100 0.200 20.30 scale 2/0.718 1.436
3.260 Add 2/0.125 0.250
1.686
Length Less c.c. 4/0.025 0.100
2 3.61 7.22 2.550 1.586
13.74 Add beam 0.550 Add hook 24(8) 0.192
3.100 1.778
Less c.c. beam 0.025
c.c. wall 0.015 (C/5Ac
3.060 0.125)2.850
Add bend 0.100 = 23+1
43.98 slope 0.450 = 24
x0.888kg 3.610
39.054kg Total 12mm Dia. Rebar 24 0.57 13.68 Length
4/0.125 0.500
8mm Dia. M.S. reinf. In isol. Less c.c. 8/0.015 0.120
stiffener. 0.380
(D/5Ac Add hook 24(8) 0.192
0.125)2.650 0.572
= 21+1
= 22 0.81 0.81 Short Length
scale 2/0.234 0.468
22 0.57 12.54 Length Add 2/0.125 0.250
4/0.125 0.500 0.718
Less c.c. 8/0.015 0.120 Less c.c. 4/0.025 0.100
0.380 0.618
Add hook 24(8) 0.192 Add hook 24(8) 0.192
0.572 0.810
2 0.81 1.62 Short Length 1.29 1.29 Average Length
scale 2/0.234 0.468 scale 2/0.476 0.952
Add 2/0.125 0.250 Add 2/0.125 0.250
0.718 1.202
Less c.c. 4/0.025 0.100 Less c.c. 4/0.025 0.100
0.618 1.102
Add hook 24(8) 0.192 Add hook 24(8) 0.192
0.810 1.294

JOB NO : GROUP ASSIGNMENT 1 TAKER OFF : WILLIAM KHOO WEI LUN


JOB TITLE : DOUBLE STOREY END LOT TERRACE HOUSE AT JALAN IPOH, 51200 KUALA LUMPUR.
ELEMENT : NO. 8 INTERNAL WALLS DATE : 8/10/2020
MEASUREMENT OF FIRST
FLOOR INTERNAL WALLS 1.78 1.78 Long Length
CON'TD 15.85 scale 2/0.718 1.436
Add 2/0.125 0.250
1.78 1.78 Long Length 1.686
17.56 scale 2/0.718 1.436 Less c.c. 4/0.025 0.100
Add 2/0.125 0.250 1.586
1.686 Add hook 24(8) 0.192
Less c.c. 4/0.025 0.100 1.778
1.586 53.71
Add hook 24(8) 0.192 x0.395kg
1.778 21.215kg Total 8mm Dia. Rebar

(B/4Ac
0.125)2.550 END
= 20+1
= 21

21 0.57 11.97 Length


4/0.125 0.500
Less c.c. 8/0.015 0.120
0.380
Add hook 24(8) 0.192
0.572

0.81 0.81 Short Length


scale 2/0.234 0.468
Add 2/0.125 0.250
0.718
Less c.c. 4/0.025 0.100
0.618
Add hook 24(8) 0.192
0.810

1.29 1.29 Average Length


scale 2/0.476 0.952
Add 2/0.125 0.250
1.202
Less c.c. 4/0.025 0.100
1.102
Add hook 24(8) 0.192
1.294
LUMPUR.
LUMPUR.
LUMPUR.
LUMPUR.
LUMPUR.
LUMPUR.
JOB NO : GROUP ASSIGNMENT 1 TAKER OFF : WILLIAM KHOO WEI LUN
JOB TITLE : DOUBLE STOREY END LOT TERRACE HOUSE AT JALAN IPOH, 51200 KUALA LUMPUR.
ELEMENT :NO. 2 WORK BELOW LOWEST FLOOR DATE : 25/9/2020
FINISH
WORK BELOW LOWEST
FLOOR FINISH Less r.l. 0.100
MEASUREMENT OF 1.400
PILECAP (PROVISIONAL)
7.00 Excavate top soil for 4 0.90 (2aP - 4 Nos Depth
15.62 109.34 preservation avg. 100mm 0.60 1.200
deep.
Width Length 1.40 3.03 0.500
0.225 6.100 Blinding 0.050
4.475 0.900 1.750
1.355 7.000 Less Slab 0.150
3.060 Topsoil 0.100
1.350 r.l. 0.100
3.300 1.400
1.550
0.300 0.90 (3P- 1 Nos Depth
15.615 0.90 1.200
1.60 1.30 0.700
7.00 Deposit preserved topsoil in Blinding 0.050
15.62 temporary spoil heaps av 1.950
15.00 m distance.
0.10 10.934 Less Slab 0.150
Topsoil 0.100
Excavate to reduce level max. r.l. 0.100
7.00 depth nex. 0.25m 1.600
15.62 &
0.10 10.934 Remove excavated material 0.30 (DDT
from site. 0.60
Depth 1.60 0.29
Conc.Blinding 0.050 1.01
H/C 0.150
0.200 E.O. trench excn. for
Less Topsoil 0.100 1⁄10 excavating in rocks, get out
0.100 load. (Provisional)
11 0.60 (2P - 11 Nos
Excavate trench for pilecap 0.90
starting from r.l max depth n.e. 1.40 0.84
2.00 m. 1⁄10

& 4 0.90 (2aP - 4 Nos


Filling to excavation with 0.60
material arising from 1.40 0.31
excavation.
11 0.60 (2P - 11 Nos Depth 1⁄10 0.90 (3P- 1 Nos
0.90 1.200 0.90
1.40 8.32 0.500 1.60 0.13
Blinding 0.050
1.750 1⁄10 0.30 (DDT
Less Slab 0.150 0.60

DIM/E2/14
Topsoil 0.100 0.03 1.60
0.10
JOB NO : GROUP ASSIGNMENT 1 TAKER OFF : WILLIAM KHOO WEI LUN
JOB TITLE : DOUBLE STOREY END LOT TERRACE HOUSE AT JALAN IPOH, 51200 KUALA LUMPUR.
ELEMENT :NO. 2 WORK BELOW LOWEST FLOOR DATE : 25/9/2020
FINISH

MEASUREMENT OF
PILECAP (PROVISIONAL) 11 0.60 (2P - 11 Nos
CON'TD 0.90
Allow for keeping the surface 0.50 2.97
Item of the site & excn. free of
surface water.
4 0.90 (2aP - 4 Nos
0.60
Concrete Work 0.50 1.08
Mass concrete blinding Grade
15 n.e. 100 mm thick laid on 0.90 (3P- 1 Nos
earth.
0.90
& 0.50 0.41
Remove excavated materials
from site. 0.30
& 0.60
DDT 0.50 0.09
Filling to excavation with 0.32
material arising from
excavation.
Formwork
Formwork to edges & faces of
11 0.60 (2P - 11 Nos pilecap exc. 500mm & ne.
1.00 m high.
0.90
0.05 0.30 11 3.00 33.00 (2P - 11 Nos
Depth
4 0.90 (2aP - 4 Nos 0.500
0.60 Blinding 0.050
0.05 0.11 0.550

0.90 (3P- 1 Nos Girth


0.90 2/0.600 1.200
0.05 0.04 2/0.900 1.800
3.000
0.30 (DDT
0.60 4 3.00 12.00 (2aP - 4 Nos
0.05 0.01 Depth
0.03 0.500
Blinding 0.050
Reinforced conc. Grade 30 in 0.550
pilecap.
& Girth
Remove excavated materials 2/0.600 1.200
from site. 2/0.900 1.800
& 3.000
DDT

DIM/E2/15
Filling to excavation with
material arising from
excavation.

JOB NO : GROUP ASSIGNMENT 1 TAKER OFF : WILLIAM KHOO WEI LUN


JOB TITLE : DOUBLE STOREY END LOT TERRACE HOUSE AT JALAN IPOH, 51200 KUALA LUMPUR.
ELEMENT :NO. 2 WORK BELOW LOWEST FLOOR DATE : 25/9/2020
FINISH

MEASUREMENT OF
PILECAP (PROVISIONAL) 11 0.300 No
CON'TD 7 1.80 138.60 0.400 0.125)0.700
254.10 = 5.6
3.14 3.14 (3P- 1 Nos = 6+1
Depth = 7
0.700
Blinding 0.050 0.900
0.750 Less c.c. 2/0.100 0.200
0.700
Girth
3/0.300 0.900 Width
0.900 0.600
2/0.671 1.342 Less c.c. 2/0.100 0.200
3.142 0.400
Add 2 bends 2/0.500 1.000
300^2+600^2=𝑐^2 Less gap 2/0.025 0.050
= 670.82 Given 2/0.075 0.150
= 0.671 C.c 2/0.100 0.200
1.800
48.14 Total Formwork
(2aP - 4 Nos
Reinforcement 4 No
16mm dia. h.t. steel rod reinf in 7 1.80 50.40 0.125)0.700
straight& bent bars in pilecap. = 5.6
(Y16-125 0.300 = 6+1
11 (2P - 11 Nos No 0.400 = 7
5 2.10 115.50 0.125)0.400
0.300 = 3.2 0.900
= 4+1 Less c.c. 2/0.100 0.200
0.700 = 5 0.700

0.600 Width
Less c.c. 2/0.100 0.200 0.600
0.400 Less c.c. 2/0.100 0.200
0.400
Add 2 bends 2/0.500 1.000
Length Less gap 2/0.025 0.050
0.900 Given 2/0.075 0.150
Less c.c. 2/0.100 0.200 C.c 2/0.100 0.200
0.700 1.800

DIM/E2/16
Add 2 bends 2/0.500 1.000
Less gap 2/0.025 0.050
Given 2/0.075 0.150
C.c 2/0.100 0.200
2.100

JOB NO : GROUP ASSIGNMENT 1 TAKER OFF : WILLIAM KHOO WEI LUN


JOB TITLE : DOUBLE STOREY END LOT TERRACE HOUSE AT JALAN IPOH, 51200 KUALA LUMPUR.
ELEMENT :NO. 2 WORK BELOW LOWEST FLOOR DATE : 25/9/2020
FINISH
MEASUREMENT OF
PILECAP (PROVISIONAL) 0.500 Bends
CON'TD 0.700 0.700
Less gap 0.025
4 0.300 No Given 0.075
5 2.10 42.00 0.125)0.400 c.c. 0.100
92.40 0.700 = 3.2 0.500
= 4+1
= 5 Girth
0.700
0.600 Add bends 2/0.500 1.000
Less c.c. 2/0.100 0.200 1.700
0.400
(For the length 300mm - a
2 1.10 2.20
Length Length
0.900 0.300
Less c.c. 2/0.100 0.200 Less c.c. 2/0.100 0.200
0.700 0.100
Add 2 bends 2/0.500 1.000 0.500
Less gap 2/0.025 0.050 Bends
Given 2/0.075 0.150 0.100 0.700
C.c 2/0.100 0.200 Less gap 0.025
2.100 Given 0.075
c.c. 0.100
(3P- 1 Nos 0.500

Girth
0.100
Add bends 2/0.500 1.000
1.100
a b c (For the length 600mm - c
2 1.10 2.20 Length
0.900 0.600
0.300 Less c.c. 2/0.100 0.200
2)1.200 0.400
c= 0.600
0.500 Bends
(For the length 900mm - b 0.700

DIM/E2/17
3 1.70 5.10 0.400 Less gap 0.025
Length Given 0.075
0.900 c.c. 0.100
Less c.c. 2/0.100 0.200 0.500
0.700
Girth
0.400
Add bends 2/0.500 1.000
1.400

JOB NO : GROUP ASSIGNMENT 1 TAKER OFF : WILLIAM KHOO WEI LUN


JOB TITLE : DOUBLE STOREY END LOT TERRACE HOUSE AT JALAN IPOH, 51200 KUALA LUMPUR.
ELEMENT :NO. 2 WORK BELOW LOWEST FLOOR DATE : 25/9/2020
FINISH

MEASUREMENT OF
PILECAP (PROVISIONAL)
CON'TD 0.500 Bends
e 0.300 0.550 0.700
d 0.450 Less gap 0.025
c 0.600 Given 0.075
b 0.750 c.c. 0.100
a 0.900 0.500

0.900 Girth
0.300 0.550
2)1.200 Add bends 2/0.500 1.000
c= 0.600 1.550

0.600 (For the length 600mm - c


0.300 1.40 1.40 Length
2)0.900 0.600
d= 0.450 Less c.c. 2/0.100 0.200
0.400
0.900
0.600 0.500 Bends
2)1.500 0.400 0.700
b= 0.750 Less gap 0.025
Given 0.075
(For the length 900mm - a c.c. 0.100
3 1.70 5.10 Length 0.500
0.900
Less c.c. 2/0.100 0.200 Girth
0.700 0.400
Add bends 2/0.500 1.000
0.500 Bends 1.400
0.700 0.700
Less gap 0.025
Given 0.075
c.c. 0.100
0.500

DIM/E2/18
Girth
0.700
Add bends 2/0.500 1.000
1.700

(For the length 750mm - b


1.55 1.55 Length
0.750
Less c.c. 2/0.100 0.200
0.550

JOB NO : GROUP ASSIGNMENT 1 TAKER OFF : WILLIAM KHOO WEI LUN


JOB TITLE : DOUBLE STOREY END LOT TERRACE HOUSE AT JALAN IPOH, 51200 KUALA LUMPUR.
ELEMENT :NO. 2 WORK BELOW LOWEST FLOOR DATE : 25/9/2020
FINISH

MEASUREMENT OF
PILECAP (PROVISIONAL) 10 mm dia. h.t steel rod reinf.
CON'TD in ties in pilecap.
(2Y10
(For the length 450mm - d (2P - 11 Nos
1.25 1.25 Length 11 2.44 26.84
0.450 Girth
Less c.c. 2/0.100 0.200 2/0.600 1.200
0.250 2/0.900 1.800
3.000
0.500 Bends Less c.c. 8/0.100 0.800
0.400 0.700 Add hook 24(10) 0.240
Less gap 0.025 2.440
Given 0.075
c.c. 0.100 (2aP - 4 Nos
0.500 4 2.44 9.76 Girth
2/0.900 1.800
Girth 2/0.600 1.200
0.250 3.000
Add bends 2/0.500 1.000 Less c.c. 8/0.100 0.800
1.250 Add hook 24(10) 0.240
2.440
(For the length 300mm - e
1.10 1.10 Length (3P- 1 Nos
19.90 0.300 2.18 2.18 Girth
Less c.c. 2/0.100 0.200 3/0.300 0.900
0.100 0.900
2/0.671 1.342
0.500 Bends 3.142
0.100 0.700 Less c.c. 12/0.100 1.200
Less gap 0.025 Add hook 24(10) 0.240
Given 0.075 2.182
c.c. 0.100
0.500 300^2+600^2=𝑐^2

DIM/E2/19
= 670.82
Girth = 0.671
0.100
Add bends 2/0.500 1.000
1.100 38.78
x0.617kg
366.40 23.927kg Total 10mm Dia. Rebar
x1.579kg
578.546kg Total 16mm Dia. Rebar