Market Conditions:
Contract Particulars: Competitive Tender List
Type of Contract: P.W.D. FORM 203A (With Quantities) Cost Fluctuation: Yes / RM Int (jv)/L
No 4,550,000.00 L
Basis of Tender Open/Selected 4,286,881.00 L
Bills of Quantities / Competition / Government / 4,200,587.60 L
4,023,588.00 L
Bills of Appr. Quant. Negotiated Private 3,939,492.10 L
3,904,165.50 L
Sched. Of Rates/ Provisional Sum RM 75,600.00 3,789,019.00 L
Spec. & Drawings Serials 3,652,262.10 L
Prime Cost Sum RM 615,240.00 3,634,000.00 L
Contract Period Stip. By Client: 52 weeks 3,468,929.80 L
Preliminaries RM 267,612.00
Contract Period Offered by Builders: 52 weeks
Contingencies RM
Number of Tenders Issued: 10
Contract Sum RM 3,586,906.50
Number of Tenders Received: 10
1 Substructure
1A Piling 312,612.00 356.36 300 1042.04 0.34
1B Work Below Lowest 160,282.60 182.71 311.01 515.36 0.35 129.00 11,532.00 432.00
Floor Finish
Group Element Total 472,894.60 539.07 611.01 1557.40 0.70 129.00 11,532.00 432.00
2 Superstructure
2A Frame 265,729.20 302.92 877.24 302.92 1.00 138.00 31,267.00 1,823.00
2B Upper Floors 96,009.00 109.44 566.23 169.56 0.65 73.00 1,196.00 539.00
2C Roof 107,680.00 122.75 666.52 161.56 0.76
2D Stairs 38,538.70 43.93
2E External Walls 44,839.00 51.11 711.49 63.02 0.81
2F Windows & External Doors 104,574.00 119.21 364.49 286.90 0.42
2G Internal Walls & Partitions 44,316.00 50.52 529.14 83.75 0.60
2H Internal Doors 42,459.00 48.40 73.89 574.62 0.08
Group Element Total 744,144.90 848.28 3789 1642.33 4.32 211.00 32,463.00 2362
3 Finishes
3A Internal Wall Finishes 122,562.00 139.71 529.14 231.62 0.60
3B Internal Floor Finishes 93,786.00 106.91 877.24 106.91 1.00
3C Internal Ceiling Finishes 37,619.00 42.88 548.15 68.63 0.62
3D External Finishes 69,956.00 79.75
Group Element Total 323,923.00 369.25 1954.53 407.16 2.23
Group Element Total 835,103.00 951.97 103.00 383.14 0.12 666,240.00 666,240.00
6 External Works
6A Site Work 159,209.00 181.49
6B Drainage 214,355.00 244.35
6C External Services
6D Ancillary Buildings
6E Recreational Facilities
Preliminaries 267,612.00
ELEMENT SPECIFICATION
1 Substructure
grade 45 reinforced concrete piles (JKR standard) measuring 300mm x 300mm including pile piles
1A Piling
(x pointed shoe) according to the instructions and approval of the superintendent
1B Work Below Lowest Floor Finish VRC Grade 30 as specified
2 Superstructure
2A Frame VRC Grade 30
2B Upper Floors VRC Grade 30
18, 20 and 25 degrees Pitch Roof, Monier Contour Tiles including mild steel hollow and 'C'
2C Roof Channel steel battens
2D Stairs VRC Grade 30, Stainless steel hollow handrailling, Stainless steel handrailling and balustrading
2E External Walls Brickwork in Common Clay Bricks, 115mm thk brickwall
Casement Aluminium Windows, Aluminium Louvres Windows, Flush Hollow Core Door, aluminium
2F Windows & External Doors
sliding door, fire rated door
2G Internal Walls & Partitions Generally 115 thk brickwall
2H Internal Doors Flush hollow core door, aluminium sliding door, fire rated door
3 Finishes
Plaster & epoxy paint (waterbased and oil based), Glazed ceramic tiles, Plaster & Paint
3A Internal Wall Finishes
(washable/wipeable,anti-bacteria chemical resistant
Homogenous polished porcelain tiles, non-slip homogenous tiles, Heavy duty homogenous vinyl
3B Internal Floor Finishes
flooring, heavy duty homogenous vinyl sheet with seemless connection line,
3C Internal Ceiling Finishes PVC laminated gypsum board ceilling, Seemless gypsum board
Plasticiser finished with steel trowel, Alkali resisting primer and two coats of weatherbond paint,
3D External Finishes non-slip homogenous tiles, Washed aggregate concrete pavement, Aluminium Strip Ceilling, Free
fibre cement flat sheet, weather emulsion paint
4 Fittings and Furnishings Postforming laminated chipboard with Formica HPL (High Pressure Laminated)
4A Sundries Adhesive text and protective vinyl colour pattern
5 Services
Wall Hung Wash Hand Basins 'Johnson Suisse', 'Boston', 'Boston 500', Vanity Bassins 'Johnson',
5A Sanitary Appliances 'Yale'
Fibreglass Reinforce Polyester (FRP) water tank, Fibreglass Reinforce Polyester (FRP) suction
5B Plumbing Installation tank
5C Refuse Disposal Not Applicable
5D Air-conditioning & Ventilation System Air-Conditioning & Mechanical Ventilation System
5E Electrical Installation Low Voltage System, Extra Low Voltage System
5F Fire Protection Installation Fire Fighting and Booster Pump, Alat Pemadam Api Mesra Alam AEROHUB
5G Lift & Conveyor Installation Not Applicable
5H Communication Installation Telecommunication System and ICT infrastructure
5I Special Installation Not Applicable
5J Builder's Profit & Attendance on Services Not Applicable
5K Builder's Work in Connection Not Applicable
with Services
6 External Works
6A Site Work Temporary earth drain
Precast concrete block drain 'egg shape', half round precast perimeter drain, trapezoidal shaped
Drainage
6B collector earth drain
6C External Services Not Applicable
6D Ancillary Buildings Not Applicable
6E Recreational Facilities Not Applicable
Vertified Clay Pipe (VCP), backfilling with selected materials, disposal of surplus excavated
6F Sewerage Works
materials
Sand blanket or approved aquivaent material as granular sand, bituminous macadam and premix
6G Road Works
or other approved asphaltic binder course including tack coat, bitumen prime coat
Area Unit Length Width Area Usable Circulation Ancillary Internal
(a) (b) (a x b) Area Area Area Division Area
ARAS 1
Penyusuan bayi 1 2.8 2.3 6.44 6.44 6.44
1 2.2 1.9 4.18 4.18 4.18
Bilik Pendidikan Kesihatan 1 2.6 0.9 2.34 2.34 2.34
1 3.6 3.6 12.96 12.96 12.96
Bilik Pemeriksaan 1 1 2.2 0.9 1.98 1.98 1.98
1 3.6 3.6 12.96 12.96 12.96
Bilik Pemeriksaan 2 1 4.4 3.4 14.96 14.96 14.96
Bilik Pemeriksaan 3 1 4.4 3.2 14.08 14.08 14.08
Utiliti Bersih 1 1.9 0.8 1.52 1.52 1.52
1 3.2 3.6 11.52 11.52 11.52
Utiliti Kotor 1 1.3 0.8 1.04 1.04 1.04
1 3.2 3.5 11.2 11.2 11.2
Bilik Utiliti 1 4.8 4.1 19.68 19.68 19.68
Tandas OKU 1 2.3 1.6 3.68 3.68 3.68
Bilik Cuci 1 2.3 0.8 1.84 1.84 1.84
Tandas 1 2.3 1.5 3.45 3.45 3.45
Bilik Prosedur 1 3.3 4 13.2 13.2 13.2
Bilik Kecemasan 1 4.6 4 18.4 18.4 18.4
Ruang Menunggu 1 5.5 4 22 22 22
Kaunter Pendaftaran 1 2.1 2.7 5.67 5.67 5.67
1 4 1.7 6.8 6.8 6.8
Bilik Ubat 1 3.9 3.5 13.65 13.65 13.65
Bilik Elektrik 1 2 2.7 5.4 5.4 5.4
Bilik Meter 1 2 1.2 2.4 2.4 2.4
Sisa Klinikal 1 1.4 1.6 2.24 2.24 2.24
1 3 2.4 7.2 7.2 7.2
Bilik rekod/server 1 1.9 2.6 4.94 4.94 4.94
Tangga 1 8.9 4.2 37.38 37.38 37.38
ARAS 2
Bilik Tidur Utama 2 3.7 3.8 14.06 28.12 28.12
Bilik Air 1 2 1.7 3.8 6.46 12.92 12.92
Jemuran 2 1.8 3.2 5.76 11.52 11.52
Dapur 2 2.8 3.2 8.96 17.92 17.92
Bilik Air 2 2 2.5 2.8 7 14 14
Ruang Makan 2 4.8 3.7 17.76 35.52 35.52
Ruang Tamu 2 3.6 3 10.8 21.6 21.6
2 4.4 3.6 15.84 31.68 31.68
2 1.6 1.9 3.04 6.08 6.08
Bilik Tidur 1 2 2.6 0.6 1.56 3.12 3.12
2 3.6 3 10.8 21.6 21.6
Bilik Tidur 2 2 4.1 3 12.3 24.6 24.6
Tangga 1 8.9 4.2 37.38 37.38 37.38
ARAS 3
Bilik Tidur Utama 2 3.7 3.8 14.06 28.12 28.12
Bilik Air 1 2 1.7 3.8 6.46 12.92 12.92
Jemuran 2 1.8 3.2 5.76 11.52 11.52
Dapur 2 2.8 3.2 8.96 17.92 17.92
Bilik Air 2 2 2.5 2.8 7 14 14
Ruang Makan 2 4.8 3.7 17.76 35.52 35.52
Ruang Tamu 2 3.6 3 10.8 21.6 21.6
2 4.4 3.6 15.84 31.68 31.68
2 1.6 1.9 3.04 6.08 6.08
Bilik Tidur 1 2 2.6 0.6 1.56 3.12 3.12
2 3.6 3 10.8 21.6 21.6
Bilik Tidur 2 2 4.1 3 12.3 24.6 24.6
Tangga 1 8.9 4.2 37.38 37.38 37.38
ARAS 4
Bilik Tangki Air 1 8.9 6.3 56.07 56.07 56.07
ARAS 1
B/3-4 1 4 0.23 0.92 0.92 0.92
B1/3-4 1 3.7 0.15 0.55 0.55 0.55
C/3-4 1 4.3 0.15 0.64 0.64 0.64
D/3-4 1 4.3 0.15 0.64 0.64 0.64
D1/3-4 1 4.3 0.15 0.64 0.64 0.64
E/3-4 1 3.6 0.15 0.54 0.54 0.54
F/3-4 1 4.2 0.15 0.63 0.63 0.63
A1/4A-5 1 4 0.15 0.6 0.6 0.6
B1/4A-5 1 4 0.15 0.6 0.6 0.6
C/4A-5 1 4 0.15 0.6 0.6 0.6
D1/4A-5 1 2.7 0.15 0.4 0.4 0.4
E/4A-5 1 4 0.15 0.6 0.6 0.6
E1/4A-5 1 3.9 0.23 0.89 0.89 0.89
F/4A-5 1 4 0.23 0.92 0.92 0.92
A-B/4 1 2.2 0.15 0.33 0.33 0.33
B-B1/4 1 3.5 0.15 0.52 0.52 0.52
B2-C1/4 1 3.6 0.15 0.54 0.54 0.54
C1-D1/4 1 3.4 0.15 0.51 0.51 0.51
D1-D2/4 1 3.2 0.15 0.48 0.48 0.48
D2-E1/4 1 3 0.15 0.45 0.45 0.45
E1-E2/4 1 3.2 0.15 0.48 0.48 0.48
D2-G/4 1 5 0.15 0.75 0.75 0.75
A-A1/4A 1 1.5 0.15 0.22 0.22 0.22
A1-B1/4A 1 3.3 0.15 0.49 0.49 0.49
B1-C1/4A 1 4.5 0.15 0.67 0.67 0.67
D2-E/4A 1 1.9 0.15 0.28 0.28 0.28
E-E2/4A 1 3.5 0.15 0.52 0.52 0.52
E2-F/4A 1 2 0.23 0.46 0.46 0.46
F-F1/4A 1 1.3 0.15 0.19 0.19 0.19
A-A1/4B 1 2.3 0.15 0.34 0.34 0.34
A-A1/4C 1 2.3 0.15 0.34 0.34 0.34
ARAS 2
B-B1/4 1 2.2 0.15 0.33 0.33 0.33
B1-B2/4 1 1.3 0.15 0.19 0.19 0.19
B2-C/4 1 3.2 0.15 0.48 0.48 0.48
B-B2/4A 1 3.6 0.15 0.54 0.54 0.54
B2-C1/4A 1 3.9 0.15 0.58 0.58 0.58
E-E2/4 1 3.2 0.15 0.48 0.48 0.48
E3-F/4 1 2.2 0.15 0.33 0.33 0.33
D1-E2/4A 1 3.9 0.15 0.58 0.58 0.58
E2-F/4A 1 3.6 0.15 0.54 0.54 0.54
ARAS 3
B-B1/4 1 2.2 0.15 0.33 0.33 0.33
B1-B2/4 1 1.3 0.15 0.19 0.19 0.19
B2-C/4 1 3.2 0.15 0.48 0.48 0.48
B-B2/4A 1 3.6 0.15 0.54 0.54 0.54
B2-C1/4A 1 3.9 0.15 0.58 0.58 0.58
E-E2/4 1 3.2 0.15 0.48 0.48 0.48
E3-F/4 1 2.2 0.15 0.33 0.33 0.33
D1-E2/4A 1 3.9 0.15 0.58 0.58 0.58
E2-F/4A 1 3.6 0.15 0.54 0.54 0.54
ARAS 4
C-D1/2 1 4.8 0.23 1.1 1.1 1.1
TOTAL 877.24 390.6 134.14 326.56 25.94
R.C CONCRETE REINFORCEMENT FORMWORK R.C CONCRETE REINFORCEMENT FORMWORK
ELEMENT BQ PAGES ELEMENT BQ PAGES
m2 RC THICKNESS m3 m2 kg/m3 kg m height m2 m2 RC THICKNESS m3 m2 kg/m3 kg m height m2