up rates
20mm thick cement and sand C 3 sereeded bed to revive porcelain ties
to floor level MZ
Labour cost
Chand RM10 842hrs1m x 0.02M 0.30
G labour mixing
40.25hm2
Tradesmanslaying
9518h
RM 2.97
spreadingmortar
RM6018h XO2h1m
laying
G labourmortar
spreading gg
Costn'camthperm 5.15
20mm thick cement and sand C 3 sereeded bed to revive porcelain ties
Labour cost
Chand RM10842hrs1m x 0.02M 0.30
G labour mixing
Tradesmanslaying
9518h x g25h1m
nm 2.97
spreadingmortar
G labour laying
spreading mortar RM6018h XO2h1m gg
Costn'camthperm 5.15
20mm thick cement and sand C 3 sereeded bed to revive porcelain ties
Labour cost
Chand RM10842hrs1m x 0.02M 0.30
G labour mixing
Tradesmanslaying
9518h x g25h1m
nm 2.97
spreadingmortar
G labour laying
spreading mortar RM6018h XO2h1m gg
Costn'camthperm 5.15
1
iiiiii
Tiles
Allow 5 wastage man 250
52.50
Cement
paste
RM15.75bag's 441.00
cement Ims
RM441 540
bags
Say5Y wastage 22 05
G labour handmixing 2h1m CRM 8 15.00
coltofcementpasted yyg.gg
wstotcementpastelm
RM478.05 0 02 9.56
Labour art
TradesmanClayingthes RM951816075 8
G labour layingties RMgo g xp 5.63
with 14.54
and painted in cement and sand l3 screeded bedto 25mn high drop M
Tiles 5.0.00
Allow 5 wastage RM50.00454 250
Costales m2 52.50
Cement
paste
RM15.75bag's 441.00
cement Ims
RM441 54
bags
Say5 wastage 22 05
G labourChandmixing 2h1m CRM 8 15.00
coltofcementpasted yyg.gg
wstotcementpastelm
RM478.05 0 02 9.56
Labour art
TradesmanClayingthes RM951816075 8
G labour layingties RMgo g xp 5.63
with 14.54
and painted in cement and sand l3 screeded bed 650mn high drop M
Item calculation RM RMIM
Material cost
Tiles 5.0.00
Allow 5 wastage RM50.00454 250
Costales m2 52.50
Cement
paste
RM15.75bag's 441.00
cement m3
RM441 540
bags
Say5 wastage 22 05
G labourChandmixing 2h1m CRM 8 15.00
coltofcementpasted yyg.gg
wstotcementpastelm
RM478.05 0 02 9.56
Labour art
TradesmanClayingthes RM951816075 8
G labour layingties RMgo g xp 5.63
with 14.54
Totalmaterial laburnum
76.60
Allow 154overhead Profit 11 49
Final WHIM 88.09
Final costly60mmhigh Rmg091m70050 4.40
I al 1
Porcelain tiles to flour
boommX600mm X 12mm think approved porcelain floor tiles bedded
printed
Tiles 48.61
Allow590 wastage RM48.61 jy 2.43
Costales me 51.04
Cement
paste
cement Ims RM's 51bagxssba.gs 441.00
RM441 54
y5 wastage 22 05
labourChandmixing 2h1m MMO 8 15.00
Hotcementpastelms yyg.rs
totcementpastem RM478.05 0 02 9.56
Labour at
radesmanclayingthes RM951810075 8.91
labour layingties RM66 87 0.75 5.63
with 14.54
Tiles 22.33
Allow590 wastage RM22.33 57 1.12
Costales M 23.45
Cement
paste
RM15.75bag's 441.00
cement Ims
RM441 540
bags
ay5Y wastage 22 05
G labourChandmixing 2h1m CRM 8 15.00
coltofcementpasted yyg.gg
wstotcementpastelm
RM478.05 0 02 9.56
Labour art
TradesmanClayingthes RM951816075 8
G labour layingties RMgo g xp 5.63
with 14.54
Cement
paste
cement Ims RM15.75bagxabags 441.00
RM441 54
y5 wastage 22 05
G labourChandmixing 2h1m CRM 8 15.00
OHofcementpasted yyg.gg
Hotcementpastem RM478.05 0 02 9.56
Labour art
tradesmanClayingthes RM951810075 8.91
G labour layingties RM66 87 0.75 5.63
with 14.54
Tiles 41.67
Allow590 wastage RM41.67 57 208
Costales M 43.75
Cement
paste
RM15.75bag's 441.00
cement Ims
RM441 540
bags
ay5 wastage 22 05
G labourChandmixing 2h1m CRM 8 15.00
coltofcementpasted yyg.gg
wstotcementpastelm
RM478.05 0 02 9.56
Labour art
TradesmanClayingthes RM951816075 8
G labour layingties RMgo g xp 5.63
with 14.54
Labour Cost
craftsmen CRM9518170.201M 2.38
G Labour Ambo DX 0.201m 1.50
3 88
Totalmaterial
labourlostm 15.72
Allow15 overhead
apwtt x RM5.72
1590
2.34
Final costm2 18.06