You are on page 1of 6

WellCAP Cross-reference Tool

Revision 060504
WellCAP Cross-reference Tool
WELL SERVICING OPERATIONS-COILED TUBING
WCT-2CTF-X – FUNDAMENTAL LEVEL

WELLCAP WCT-2CTF REFERENCE TO APPLICATION MATERIALS


FUNDAMENTAL LEVEL (Note Where Each Topic Can Be Found)
WELLCAP TRAINING TOPIC MANUAL LECTURE SIMULATION OTHER RESOURCE
OUTLINE (Cite Chapter and (Note Day/Time of (Identify Exercise) (Identify Video, CBT
NO. Page No.) Course Outline) Program, Handout,
Etc.)
I. REASONS FOR
PERFORMING
COILED TUBING
OPERATIONS
A. Definition of Coiled Tubing
Operations 148 - 151 Third Day (First Lecture) Handout

B. Reasons for Performing


Coiled Tubing Operations 150 – 151 Third Day (First Lecture) Handout

II. DEFINITIONS AND


CALCULATIONS
A. Pressure Fundamentals
8–9 Second Day (1st Lecture) Handout

B. Static Wells and Live Wells


3 Second Day (1st Lecture) Handout
C. Volumes, Capacities and
Displacements 20 Second Day (1st Lecture) Handout
D. Force
17 Second Day (1st Lecture) Handout


To further facilitate cross-referencing, the proposed document may include a margin or parenthetical reference to the appropriate WellCAP outline number.

1 of 6

WCT-2CTF-X – FUNDAMENTAL LEVEL


WellCAP Cross-reference Tool
Revision 060504

WELLCAP WCT-2CTF REFERENCE TO APPLICATION MATERIALS


FUNDAMENTAL LEVEL (Note Where Each Topic Can Be Found)
WELLCAP TRAINING TOPIC MANUAL LECTURE SIMULATION OTHER RESOURCE
OUTLINE (Cite Chapter and (Note Day/Time of (Identify Exercise) (Identify Video, CBT
NO. Page No.) Course Outline) Program, Handout,
Etc.)
III. INFLUX
FUNDAMENTALS
A. Definition of a Fluid Influx 40 to 45 First Day (2ND Lecture) Video – Handout
B. Causes of a Fluid Influx 40 to 45 ND
First Day (2 Lecture) Video – Handout
C. Fluid Influx Detection 40 to 45 First Day (2ND Lecture) Video – Handout
D. Importance of Influx
40 to 45 First Day (2ND Lecture) Video – Handout
Management
IV. GAS
CHARACTERISTICS
AND BEHAVIOR
A. Pressure and Volume
20 - 22 Second Day (2nd Lecture) Handout
Relationship (Boyle's Law)
B. Gas Expansion and
20 - 22 Second Day (2nd Lecture) Handout
Migration Relationships
C. Solubility of Gases 20 - 22 Second Day (2nd Lecture) Handout
V. DRILLING,
COMPLETION AND Video - Handout
WORKOVER FLUIDS
A. Use of Fluids Second Day (3rd Lecture) Video – Extra Handouts
B. Liquids Second Day (3rd Lecture) Video – Extra Handouts
C. Nitrogen Gas Second Day (3rd Lecture) Video – Extra Handouts
D. Fluid Properties and
Second Day (3rd Lecture) Video – Extra Handouts
Characteristics
E. Fluid Flow Behavior Second Day (3rd Lecture) Video – Extra Handouts
F. Fluid Measuring
Second Day (3rd Lecture) Video – Extra Handouts
Techniques and Concerns

2 of 6

WCT-2CTF-X – FUNDAMENTAL LEVEL


WellCAP Cross-reference Tool
Revision 060504

WELLCAP WCT-2CTF REFERENCE TO APPLICATION MATERIALS


FUNDAMENTAL LEVEL (Note Where Each Topic Can Be Found)
WELLCAP TRAINING TOPIC MANUAL LECTURE SIMULATION OTHER RESOURCE
OUTLINE (Cite Chapter and (Note Day/Time of (Identify Exercise) (Identify Video, CBT
NO. Page No.) Course Outline) Program, Handout,
Etc.)
VI. GENERAL
OVERVIEW OF
SURFACE AND
SUBSURFACE
WELLBORE
EQUIPMENT
A. Production (Christmas) tree 139 - 146 Second Day (4th Lecture) Handout
B. Completion Tubulars th
Second Day (4 Lecture) Extra Handouts
C. Completion Equipment 112 – 143 Second Day (4th Lecture) Handout
D. Safety Systems and
Emergency Shutdown Second Day (4th Lecture) Extra Handouts
Devices (ESD’s)
VII. OVERVIEW OF
COILED TUBING
EQUIPMENT
A. Coiled Tubing Equipment 170 to 246 Third Day (2nd & 3rd Lecture) Handout
B. Stripper (Pack-Off) nd rd
170 to 246 Third Day (2 & 3 Lecture) Handout
Assemblies
C. Well Control Stack Rams 170 to 246 Third Day (2nd & 3rd Lecture) Handout
D. Additional Well Control nd rd
170 to 246 Third Day (2 & 3 Lecture) Handout
Equipment
E. Chokes and Choke Manifolds 170 to 246 Third Day (2nd & 3rd Lecture) Handout
F. Accumulators 170 to 246 Third Day (2nd & 3rd Lecture) Handout
G. Coiled Tubing Limitations 170 to 246 nd rd
Third Day (2 & 3 Lecture) Handout
H. Fluid Measuring Devices 170 to 246 Third Day (2nd & 3rd Lecture) Handouts
I. Gas Detection and Handling
170 to 246 Third Day (2nd & 3rd Lecture) Handout
Systems

3 of 6

WCT-2CTF-X – FUNDAMENTAL LEVEL


WellCAP Cross-reference Tool
Revision 060504

WELLCAP WCT-2CTF REFERENCE TO APPLICATION MATERIALS


FUNDAMENTAL LEVEL (Note Where Each Topic Can Be Found)
WELLCAP TRAINING TOPIC MANUAL LECTURE SIMULATION OTHER RESOURCE
OUTLINE (Cite Chapter and (Note Day/Time of (Identify Exercise) (Identify Video, CBT
NO. Page No.) Course Outline) Program, Handout,
Etc.)
VIII. RIG BLOWOUT
PREVENTER
EQUIPMENT
A. Rig Blowout Preventer
Equipment
IX. PROCEDURES
A. Pre-Recorded Well
First Day (3rd Lecture) Extra Handout
Information
B. Securing the Well First Day (3rd Lecture) Extra Handout
C. Well Control Drills First Day (3rd Lecture) Extra Handout
D. Verification of Secured Well
First Day (3rd Lecture) Extra Handout
Conditions
E. Well Monitoring During
First Day (3rd Lecture) Extra Handout
Operations
X. WELL CONTROL
TECHNIQUES
A. Objectives of Well Control
5 First Day (First Lecture) Handouts
Techniques
B. Well Intervention
Techniques (without killing 8–9 First Day (First Lecture) Handouts
the well)
C. Techniques for Killing a
First Day (First Lecture) Extra Handouts
Well
D. No Returns Pumping
21 First Day (First Lecture) Handout
Technique (Bullheading)
E. Preparation of a Well
31 – 33 First Day (First Lecture) Extra Handouts
Control Kill Worksheet

4 of 6

WCT-2CTF-X – FUNDAMENTAL LEVEL


WellCAP Cross-reference Tool
Revision 060504
WELLCAP WCT-2CTF REFERENCE TO APPLICATION MATERIALS
FUNDAMENTAL LEVEL (Note Where Each Topic Can Be Found)
WELLCAP TRAINING TOPIC MANUAL LECTURE SIMULATION OTHER RESOURCE
OUTLINE (Cite Chapter and (Note Day/Time of (Identify Exercise) (Identify Video, CBT
NO. Page No.) Course Outline) Program, Handout,
Etc.)
XI. COMPLETION
WELLBORE
COMPLICATIONS
AND SOLUTIONS
A. Blockages and Trapped
Pressure in Tubing / Well 24 First Day (4th Lecture) Handout

B. Pressure on Casing First Day (4th Lecture) Extra Handout


C. Underground Flow First Day (4th Lecture) Extra Handout
D. Paraffin 224 First Day (4th Lecture) Extra Handout
E. Hydrates 26 to 33 First Day (4th Lecture) Handout
F. Lost Circulation 43, 48, 52, 160 First Day (4th Lecture) Handout
XII. COILED TUBING
SERVICE
COMPLICATIONS
AND SOLUTIONS
A. Collapsed Coiled Tubing 24, 227 Fourth Day (1st Lecture) Handout
B. Pneumatically-Controlled
159 Fourth Day (1st Lecture) Handout
Valves
C. H2S Considerations 206, 213 Fourth Day (1st Lecture) Handout
D. Operations with Specific
Fourth Day (1st Lecture) Extra Handout
Well Control Concerns

5 of 6

WCT-2CTF-X – FUNDAMENTAL LEVEL


WellCAP Cross-reference Tool
Revision 060504
WELLCAP WCT-2CTF REFERENCE TO APPLICATION MATERIALS
FUNDAMENTAL LEVEL (Note Where Each Topic Can Be Found)
WELLCAP TRAINING TOPIC MANUAL LECTURE SIMULATION OTHER RESOURCE
OUTLINE (Cite Chapter and (Note Day/Time of (Identify Exercise) (Identify Video, CBT
NO. Page No.) Course Outline) Program, Handout,
Etc.)
XIII. ORGANIZING A
WELL CONTROL
OPERATION
A. Personnel Assignments First Day (4th Lecture) Extra Handout
B. Pre-Recorded Information th
First Day (4 Lecture) Extra Handout
C. Plan Responses to
Anticipated Well Control First Day (4th Lecture) Extra Handout
Scenarios
D. Communications
First Day (4th Lecture) Extra Handout
Responsibilities
XIV. TESTING
A. Installation of Rings,
Second Day (4th Lecture) Video
Flanges and Connections
B. MAWP and Equipment
Second Day (4th Lecture) Video
Function Tests
C. Well Control Equipment
Second Day (4th Lecture) Video
Component Testing
XV. GOVERNMENT,
INDUSTRY &
COMPANY RULES,
ORDERS & POLICIES
A. Incorporate by reference Fourth Day (1st Lecture) Extra Handout

6 of 6

WCT-2CTF-X – FUNDAMENTAL LEVEL

You might also like