EN 197-1:2000
At least once per month the composition of the cement shall be checked by the
manufacturer, using as a rule a spot sample taken at the point of release of the
cement. The cement composition shall meet the requirements specified in Table 1.
The limiting quantities of the main constituents specified in Table 1 are reference
values to be met by the average composition calculated from the spot samples taken
in the control period. For single results, maximum deviations of -2 at the lower and +2
at the higher reference value are allowed. Suitable procedures during production and
appropriate verification methods to ensure conformity to this requirement shall be
applied and documented.
The cement constituents shall meet the requirements specified in clause 5. Suitable
procedures during production to ensure conformity with this requirement shall be
applied and documented.