Professional Documents
Culture Documents
Page
Job
Strength
Shock
No.
Cell
of
3029
Stiffness
Date Project
grout filled CHS CALCULATION SHEET
Discipline
By
Costain Petrofac - Riser Protection
NAA
Date
ST 03/02/04
29/01/04
Chkd.
Page
Job
Job No.
No.
3029
06-058T
7020
Date
2
Project Discipline Page
VALHALL LQ MODULE STRUCT 001
Padeye calculations
Loads
Max. Unfactored lifting Load, P = 19.62 kN 2 MT
Dynamic Amplification factor, DAF = 1.1
Consequence Factor, gc = 1.25
Maximum design vertical load, V = 27.0 kN 2.75 MT
Maximum design horizontal load, 50% of vertical load, H = 13.5 kN 1.38 MT
Maximum design lateral load, 5% of vertical load, LT = 1.35 kN 0.138 MT
LT
A A
H
V
Shackle Selection : Bow Shackle - Refer EN:13889:2003(E)
Static load for shackle selection = 19.62 kN 2 MT
Working load limit as per EN:13889:2003(E) = 63.8 kN 6.5 MT
Shackle pin diameter, Dpin ( D in fig) = 25 mm
Inside width of shackle (w, in fig) = 36.5 mm
Inside length of shackle (s, in fig) = 76 mm
Padeye geometry
Radius of the main plate, rmp = 58 mm
Thickness of the main plate, tmp = 20 mm
Width of main plate, Wmp = 116 mm
Diameter of padeye hole, Dhole = 28 mm
Diameter of sling, Dsling = 10 mm
Date
Date
Title Chkd.
Page
Job
Strength
Shock
No.
Cell
of
3029
Stiffness
Date Project
grout filled CHS CALCULATION SHEET
Discipline
By
Costain Petrofac - Riser Protection
NAA
Date
ST 03/02/04
29/01/04
Chkd.
Page
Job
Job No.
No.
3029
06-058T
7020
Date
2
Project Discipline Page
VALHALL LQ MODULE STRUCT 001
Padeye Design
Young's Modulus, E = 2100000 N/mm2
Material Factor, gM = 1.15
Yield Strength, fy = 355 N/mm2
Date
Title Chkd.
Page
Job
Strength
Shock
No.
Cell
of
3029
Stiffness
Date Project
grout filled CHS CALCULATION SHEET
Discipline
By
Costain Petrofac - Riser Protection
NAA
Date
ST 03/02/04
29/01/04
Chkd.
Page
Job
Job No.
No.
3029
06-058T
7020
Date
2
Project Discipline Page
VALHALL LQ MODULE STRUCT 001
B
H
V
Tensile stress check
Factored vertical load, V = 27.0 kN
Tensile area, Aten = Wmp X Tmp = 2320 mm2
Tensile stress, Ft1 = V/Aten = 12 N/mm2
Date
Title Chkd.
Page
Job
Strength
Shock
No.
Cell
of
3029
Stiffness
Date Project
grout filled CHS CALCULATION SHEET
Discipline
By
Costain Petrofac - Riser Protection
NAA
Date
ST 03/02/04
29/01/04
Chkd.
Page
Job
Job No.
No.
3029
06-058T
7020
Date
2
Project Discipline Page
VALHALL LQ MODULE STRUCT 001
116 mm
C C
20
Maximum bending stress, Fb = 12.0 N/mm2
150X75 PFC
E
20
100 116
40 E
LT
Equivalent Stres, s e
= Ö ( Ft2 + Fb2 + 3 t v 2 ) = 20.7 N/mm2
Result
Hence Padeye passess all the design calculation checks
Date
Date
Title Chkd.
Page
Job
Strength
Shock
No.
Cell
of
3029
Stiffness
Date Project
grout filled CHS CALCULATION SHEET
Discipline
By
Costain Petrofac - Riser Protection
NAA
Date
ST 03/02/04
29/01/04
Chkd.
Page
Job
Job No.
No.
3029
06-058T
7020
Date
2
Project Discipline Page
VALHALL LQ MODULE STRUCT 001
Y104
3
X X
100
LT r
H
1 2
V
Y
assume throat weld = 6
no width depth Area y x Ay Ax Ay2 Ax2 Ixx Iyy
1 6 100 600 3 50 1800 30000 5400 1500000 500000 1800
2 6 100 600 113 50 67800 30000 7661400 1500000 500000 1800
3 104 6 624 58 97 36192 60528 2099136 5871216 1872 562432
1824 105792 120528 1001872 566032
Centroid
X = 66.08 mm Ixx = 1908725 mm4 Ip = 6104757 mm4
Y = 58 mm Iyy = 4196032 mm4 r = 123 mm
H
H= 13.49
V = 27 kN
Date
Title Chkd.
Page
Job
Strength
Shock
No.
Cell
of
3029
Stiffness
Date Project
grout filled CHS CALCULATION SHEET
Discipline
By
Costain Petrofac - Riser Protection
NAA
Date
ST 03/02/04
29/01/04
Chkd.
Page
Job
Job No.
No.
3029
06-058T
7020
Date
2
Project Discipline Page
VALHALL LQ MODULE STRUCT 001
Resultant
due to LT
150X75 PFC
H
116
100
MT* = reaction moment
*M T
E
40
LT
H
LT
H LT V
Date
Title Chkd.
Page
Job
Strength
Shock
No.
Cell
of
3029
Stiffness
Date Project
grout filled CHS CALCULATION SHEET
Discipline
By
Costain Petrofac - Riser Protection
NAA
Date
ST 03/02/04
29/01/04
Chkd.
Page
Job
Job No.
No.
3029
06-058T
7020
Date
2
Project Discipline Page
VALHALL LQ MODULE STRUCT 001
58
251.4 mm
*MT
125.7
40 VT
Date