You are on page 1of 1

S/N WORK MATERIAL QUANTI RATE(N) PRICE(N)

TY
1. BAMBOO STRUCTURE GRASS 300 500 150,000
2. WRAP 10 800 8,000
3. WIRE 4 2,500 10,000
4. 2X4 70 450 31,500
5. 2X2 80 250 20,000
6. NAIL 3” & 4” ½ BAG 1,500 3,000
EACH
7. CEMENT 5 BAGS 2,600 13,000
8. LABOR 35,000
TOTAL 270,500
TOTAL FOR 2 STRUCTURES 541,000

10. FLOWERS YELLOW BUSH 150 150 15,000


PEACE PALM 6 400 2,000
KOTONOU FICUS 50 150 4,500
KERBS
GRANITE 20 300 6,000
BAGS
LABOR 40,000
TOTAL 61,500

11. SOLAR STREET LIGHTS LIGHT AND SOLAR 4 140,000 560,000


PANEL
FABRICATION OF 4 30,000 120,000
POLES
WORKMANSHIP 4 10,000 40,000
TOTAL 720,000

12. PLUMBING 25,000


TOTAL 1,347,500

You might also like