Input data
Project

Settings
(input for current task)
Stability analysis
Earthquake analysis : Standard
Verification methodology : according to EN 1997
Design approach : 3 - reduction of actions (GEO, STR) and soil parameters
Partial factors on actions (A)
Permanent design situation
State STR State GEO
Unfavourable Favourable Unfavourable Favourable
Permanent actions : gG = 1.35 [–] 1.00 [–] 1.00 [–] 1.00 [–]
Variable actions : gQ = 1.50 [–] 0.00 [–] 1.30 [–] 0.00 [–]
Water load : gw = 1.00 [–]

Partial factors for soil parameters (M)


Permanent design situation
Partial factor on internal friction : gf = 1.25 [–]
Partial factor on effective cohesion : gc = 1.25 [–]
Partial factor on undrained shear strength : gcu = 1.40 [–]

Interface
Coordinates of interface points [m]
No. Interface location
x z x z x z
1 -41.25 -13.00 -0.65 -13.00 -0.65 0.00
0.00 0.00 49.50 0.00

2 -0.65 -13.00 -0.65 -16.50 0.00 -16.50


0.00 -2.00 0.00 0.00

3 0.00 -2.00 49.50 -2.00

Soil parameters - effective stress state


jef cef g
No. Name Pattern
[°] [kPa] [kN/m3]

1 Fill 30.00 0.00 17.00

1
[GEO5 - Sheeting Check (demoversion) | version 5.2020.50.0 | Copyright © 2020 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DE with Piles

jef cef g
No. Name Pattern
[°] [kPa] [kN/m3]

2 Silty Sandy Gravel 35.00 0.00 17.00

Soil parameters - uplift


gsat gs n
No. Name Pattern
[kN/m3] [kN/m3] [–]

1 Fill 17.50

2 Silty Sandy Gravel 17.50

Soil parameters
Fill
Unit weight : g = 17.00 kN/m3
Stress-state : effective
Angle of internal friction : jef = 30.00 °
Cohesion of soil : cef = 0.00 kPa
Saturated unit weight : gsat = 17.50 kN/m3

Silty Sandy Gravel


Unit weight : g = 17.00 kN/m3
Stress-state : effective
Angle of internal friction : jef = 35.00 °
Cohesion of soil : cef = 0.00 kPa
Saturated unit weight : gsat = 17.50 kN/m3

Rigid bodies
g
No. Name Sample
[kN/m3]

1 Material of structure 23.00

Assigning and surfaces


Coordinates of surface points [m] Assigned
No. Surface position
x z x z soil
1 49.50 -2.00 49.50 0.00
Fill
0.00 0.00 0.00 -2.00

2
[GEO5 - Sheeting Check (demoversion) | version 5.2020.50.0 | Copyright © 2020 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DE with Piles

Coordinates of surface points [m] Assigned


No. Surface position
x z x z soil
2 -0.65 -16.50 0.00 -16.50
Material of structure
0.00 -2.00 0.00 0.00
-0.65 0.00 -0.65 -13.00

3 0.00 -2.00 0.00 -16.50


Silty Sandy Gravel
-0.65 -16.50 -0.65 -13.00
-41.25 -13.00 -41.25 -21.50
49.50 -21.50 49.50 -2.00

Anchors
Anchor
Origin Free length Root length Slope Force
No. spacing
x [m] z [m] l [m] lk [m] a [°] b [m] F [kN]
1 -0.65 -2.50 10.00 7.00 15.00 2.00 401.69
2 -0.65 -5.00 9.00 7.00 15.00 2.00 399.46
3 -0.65 -7.50 8.50 7.00 15.00 2.00 405.28
4 -0.65 -10.00 8.00 7.00 15.00 2.00 419.88

Surcharge
Location Origin Length Width Slope Magnitude
No. Type Type of action
z [m] x [m] l [m] b [m] a [°] q, q1, f, F q2 unit
1 strip variable on terrain x = 0.00 l = 49.50 0.00 24.00 kN/m2

Surcharges
No. Name
1 Surcharge

Water
Water type : No water

Tensile crack
Tensile crack not input.

Earthquake
Earthquake not included.

Settings of the stage of construction


Design situation : permanent

Results (Stage of construction 1)


Analysis 1
Circular slip surface

3
[GEO5 - Sheeting Check (demoversion) | version 5.2020.50.0 | Copyright © 2020 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DE with Piles

Slip surface parameters


x= -4.49 [m] a1 = -36.87 [°]
Center : Angles :
z= 3.08 [m] a2 = 81.19 [°]
Radius : R= 20.10 [m]
The slip surface after optimization.
Slope stability verification (Bishop)
Sum of active forces : Fa = 1890.88 kN/m
Sum of passive forces : Fp = 2909.87 kN/m
Sliding moment : Ma = 38006.71 kNm/m
Resisting moment : Mp = 58488.45 kNm/m
Utilization : 65.0 %
Slope stability ACCEPTABLE