OCCUPANCY LOAD

FLOOR OCCUPANCY EXIT UNIT CALCULATION EXIT UNITS COMBINED EXIT NO. EXIT COMBINED EXIT COMBINED EXIT WIDTH
FLOOR NAME FLOOR USAGE PURPOSE GROUP LOAD FACTOR NO. OF PERSONS NO. OF PERSON/ UNIT REQUIRED WIDTH REQUIRED PROVIDED WIDTH PROVIDED (mm) MINUS 1 NO. (mm) REMARKS
AREA (m2)
office (exit door) RUANG LEGAR 830.85 3 m2 per person 277.0 100 (door) 2.77 3.00 6 10100 door 7700 mm Complied
- - x 550 mm
GF
Total 830.85 277.0 3.00 1650.00 6 10100 door 7700 mm
office (exit door) SHOP 846.95 1.35 m2 per person 628.0 100 (door) 6.28 6.28 3 5500 door 3300 mm Complied
- - x 550 mm

Total 846.95 628.0 6.28 3600.00 3 5500 door 3300 mm


1st
canteen (exit stair) Place of assembly 846.95 1.35 m2 per person 300 60 (Stairs) 5.00 5.00 3 4500 stair 3000 mm Complied
HAD BEBAN PENDUDUKAN - x 550 mm

Total 846.95 300.0 5.00 5800.00 3 4500 stair 3000 mm


office (exit door) IV (Office) 1104.38 10 m2 per person 110.4 100 (door) 1.10 1.10 3 5500 door 3300 mm Complied
- - x 550 mm

Total 1104.38 110.4 1.10 607.41 3 5500 door 3300 mm


2nd
canteen (exit stair) Place of assembly 782.59 1.35 m2 per person 300 60 (Stairs) 5.00 5.00 3 4500 stair 3000 mm Complied
HAD BEBAN PENDUDUKAN - x 550 mm

Total 782.59 300.0 5.00 5500.00 3 4500 stair 3000 mm


office (exit door) IV (Office) 1230.48 10 m2 per person 123.0 100 (door) 1.23 1.23 3 5500 door 3300 mm Complied
- - x 550 mm

5th office (typical Total 1230.48 123.0 1.23 676.76 3 5500 door 3300 mm
from 3rd to 7th
office (exit stair) IV (Office) 927.22 10 m2 per person 93 60 (Stairs) 1.55 2.00 3 4500 stair 3000 mm Complied
floor)
- - x 550 mm

Total 927.22 93.0 2.00 1100.00 3 4500 stair 3000 mm


office (exit door) IV (Office) 1713.00 10 m2 per person 171.3 100 (door) 1.71 1.71 3 5500 door 3300 mm Complied
- - x 550 mm

10th office Total 1713.00 171.3 1.71 942.15 3 5500 door 3300 mm
(typical from 8th
office (exit stair) IV (Office) 1333.47 10 m2 per person 134 60 (Stairs) 2.23 2.23 3 4500 stair 3000 mm Complied
to 10th floor)
- - x 550 mm

Total 1333.47 134.0 2.23 1400.00 3 4500 stair 3000 mm

COMPARTMENTATION

CALCULATION FOR COMPLIANCE WITH DIMENSIONS OF BUILDINGS AND COMPARTMENTS IN ACCORDANCE BY-LAW 136
Calculation for Volume Fifth Schedule By-Law 136 - Automatic Sprinklers
Floor Area of Cubic Capacity
Storey in Building of Building or
Level Purpose Group Area Height Volume or Compartment Height Compartment Area Volume

m² m m³ m² m m³ m² m³
Ground Floor Lobby 1,241 3.7
1st Floor Cafe SHOP 1,151 3.7 12,661
OFFICE
2nd Floor Café 1,104
3rd Floor Office IV - Office 1,226 3,269
4th Floor Office IV - Office 1,230 3,282
5th Floor Office IV - Office 1,230 3,284 No Limit No Limit No Limit No Limit No Limit
6th Floor Office IV - Office 1,230 3.45 3,284
7th Floor Office IV - Office 1,230 3,284
8th Floor Office IV - Office 1,712 4,946
9th Floor Office IV - Office 1,710 4,940
10th Floor Office IV - Office 1,714 4,686