Annexure-A

IPDS PROJECT COMPLETION CERTIFICATE

(To be signed by MD/CMD of utility OR Secretary Energy/Power Dept)

This is to certify that all the Distribution Strengthening works in the under mentioned Circle/project of IPDS has been successfully
completed and commissioned as per IPDS guidelines. The works have been executed as per sanctioned BoQ or as modified during
award/implementation stage. The changes made during execution, were mandatory as per local site requirements. The objective of
distribution system strengthening, as envisaged under IPDS, has not been compromised upon due to these BoQ changes. The works
have been executed ensuring required quality and standards. The completed BoQ and cost of the circle/project has been recommended
by state DRC in its meeting held on ……………. The same is enclosed here with as Annexure. Specifications of major high value
materials finalized by Committee-A of MoP has been adhered to and any other change in specification from SBD has been duly approved
by State DRC. All the BoQ items installed in the project area were procured & executed after the date of sanction of the project by the
Monitoring Committee. This is also to certify that this claim is for material/works procured/executed upto the date of completion of the
project. Utility has arranged funds from own /other sources for funding project cost over and above the sanctioned cost by the Monitoring
Committee.

The details are given below:


1. Name of Utility:
2. Name of Circle/Project ________GoI Grant No________
3. Sanctioned DPR Cost by Monitoring Committee Rs.______Crs.
4. Awarded Cost Rs.______Crs. (In case of Departmental execution; mention awarded cost of erection contracts +material cost)
5. Schedule Project Completion Date as approved by Monitoring Committee__________
6. Actual Project Completion Date: __________
7. Completed Cost of executed project and funding details:

Details Rs. Crs.


1. Completed project cost
2. Source of funds & Utilization in the project
a) GoI Grant released by PFC
b) Counterpart loan released by FIs/Banks
c) Utility’s Own Contribution as per guidelines
d) Own fund / Internal resources
Total of 2 (a+b+c+d)
3. Balance GoI Grant claimed as last tranche = Limited to GoI Grant sanctioned / 60%
(85% in case of Special Category States) of executed project cost whichever is less
minus GoI Grant already released through earlier tranche (s).
4. Balance CP Loan claimed from PFC= Limited to CP loan sanctioned / 30% (10% in
case of Special Category States) of executed project Cost whichever is less minus
amount released through earlier tranche (s)

8. Counterpart loan sanction details for the Circle:


S. No Name of FI /Bank Loan amount Amount Disbursed Amount Utilized
(Rs Crs) (Rs Crs) (Rs Crs)
1
The Utilization Certificate in GFR 12-A / 12-C for GoI Grant /CP Loan /Own Contribution, claim form and details of major items of works
approved and completed as per Annexure-B is enclosed.

Date:

Signature
(MD/CMD) of Utility/ Secretary Energy of PD
Enclosures:
1. DRC Recommendation of final executed BoQ and completed project cost.
2. Utilization Certificate in GFR 12-A / 12-C
3. Final Claim Form-I & Form-II
4. Physical Progress (with Item-wise break-up) as per Annexure-B