The Alternator comprises of a brushless two bearing unit, designed to meet the standards for industrial
rotating electrical machines laid down in BSEN60034 and relevant sections of BS5000, IECEN60034, VDE
0530, Nema MG1-22 and CSA C22.2 No. 100.
The Alternator meets the requirements of Lloyds, Germanischer Lloyd, Bureau Veritas, American
Bureau of Shipping, Det Norske Veritas or R.I.N.A.
It is of compact design, 6 pole, running at 1000 rpm, self excited with electronic Automatic Voltage
Regulator providing voltage regulation within +/- 0.5% of rated output, 6 wire stator, class H insulation, with
screen protection providing radio interference suppression to BS1597 and VDE class K, Voltage Transient
protection for AVR and rotating diodes.
2.1.1 Crankcase
Single-piece casing in spherical graphite iron, inherently stable due to the depth of the side walls;
suspended main bearings, cross-bolted; lateral maintenance apertures; fitted cooling water jacket; wet
cylinder liners; crank case vented via electric extractor fan with oil separator which discharges into the open air
(supplied loose).
2.1.4 Ignition
Microprocessor-controlled high-tension ignition system with low-tension distribution, one ignition coil per
cylinder, with no moving parts and therefore no wear; triggered via Hall effect pick-ups at the flywheel and cam
shaft, variable ignition timing, ignition energy and distribution controlled by computer on primary side of ignition
coils, chamber type spark plugs with Teflon plug connectors.
Page 4
www.Alborzgenerator.com
Bargh Afshan Alborz
Bunded oil tanks both of capacity 6000 litres are included, one for clean oil and the other for waste oil.
Contents gauges and level alarms are included.
2.1.13 Radiators
Without knowing the final layout of the building we have allowed for roof mounted cooling radiators with
multiple fans for charge cooling and dump cooling.
2.1.16 Cabling
Genset cabled using multi-function rails. Cabling for generator and auxiliaries to be provided by
customer.
2.1.18 HV Switchgear
GenieEvo comprises
Cast resin encapsulated MV system
Demountable vacuum circuit breaker
Controlled air, resin encapsulated series
disconnector
Flexible pre-engineered protection and control
modules
Control panels
A built-in synchronizer and digital isochronous load sharer allow a total integrated solution for gen-sets in
standby, island parallel or mains parallel. Native co-operation of up to 32 gen-sets is a standard feature.
InteliSysNT supports many standard ECU types and is specially designed to easily integrate new ones.
A powerful graphic display with user-friendly controls allows any user whatever their ability to find the
information they need. The display on the basic version is capable of displaying graphical languages.
Lubricating oil heat exchanger (plate type for mounting in LT cooling circuit)
Electric extractor fan with oil separator for crankcase venting, including flexible connection.
Differential pressure switch for crankcase venting.
Paper dry-air filters with integral air intake preheating and flexible air line.
Regulating valve for air intake preheating, with electric actuator.
Expansion joints for flexible gas connection.
Exhaust expansion joints with clips and weld-on flanges.
Gas control unit as per DVGW supplied as a compact unit with ball valve, gas filter, manometer,
pressure switch, 2 solenoid valves, zero pressure regulator, complete with connecting flanges and
counter flanges.
1 flexible gas pipe for connection to engine.
1 set anti-vibration spring elements.
2 solenoid valves with connectors for lubricating oil replenishment (from supply tank).
Operating instructions and spares parts list (2 copies).
Exhaust back pressure switch.
Page 7
Tel: +98 121 2229599
Fax: +98 121 3239001
Web: www.AlborzGenerator.com
Email: ba_alborz@yahoo.com
www.Alborzgenerator.com
Bargh Afshan Alborz
Page 8
5.0 Documentation
One (1) Copy of the following standard set of documentation will be supplied with each Generating set:
5.1 Operating and Maintenance manual,
5.2 Wiring diagram,
All Drawings and Documentation shall be in the English language. Units of measurement shall be in
accordance with the SI or metric system.
6.0 Inspection
Inspection will be done by SGS or Lloyds and seller is obliged to coordinate for inspection and pay
inspection cost.
8.0 Training
Training for installation, operation and maintenance the goods for two persons from the buyer for 7 days in the
place of seller is free of charge. All costs of tickets, hotel, food and other expenses are excluded.
11.0 Enclosure
Technical data 50 Hz TBG 632 V16, Natural gas, 500 NOx ..TBG 632 V16 Erdgas 500 NOx
Technical data 50 Hz - Natural gas applications ... ..n_mwm_tbg632_0509[1]
TBG 632 V16 ... ...Schematic Plan
Page 9
www.Alborzgenerator.com
Bargh Afshan Alborz
Please find below details of what work was carried out as part of the E50 service plus the variations and testing. Hold
itch #1 - 2200071
All 16 cylinder heads replaced by service exchange cylinder heads from the Deutz German Xchange centre. All associated valve
gear re-assembled and set to the correct clearances.
Both intercoolers completely stripped and rebuilt using all new gaskets and seals. All aluminium covers, top and bottom, have
been replaced using cast covers.
Both gas mixers cleaned, checked and lubricated. Control of both gas mixers checked correct and tested from the TEM with
full travel. Limit switches set up correct.
New air filters and spark plugs have been supplied but not fitted to prevent damage in transit. Old filters and plugs re-fitted to the
engine to prevent dirt ingress to engine.
Oil filter housing bracket on A bank has been replaced due to the original being badly cracked. Intercooler and jacket water
system pressure tested to 4.5 bar with no leaks.
Both turbo chargers type RR221 -14 have been returned to the manufacturer for overhaul. The details of which have been
supplied on a previous report.
New control batteries have been fitted to the generator control panel.
All associated pumps and fan motors associated with the generator have been run under electrical power
and proved correct.
Throttle has beere-calibrated through the TEM system. All engine sensors are indicating correct back to the TEM system.
The TEM CPU has been upgraded to version 2.29, and the operating terminal has been upgraded to the latest touch
screen version.
The TEM system has been re -installed with all the original commissioning parameters and additional 24 messages .
Holditch #2 - 2200093
All 16 cylinder heads replaced by service exchange cylinder heads from the Deutz German Xchange centre. All associated valve
gear re-assembled and set to the correct clearances.
Both intercoolers completely stripped and rebuilt using all new gaskets and seals. All aluminium covers, top and bottom, have
been replaced using cast covers.
Both gas mixers cleaned, checked and lubricated. Control of both gas mixers checked correct and tested from the TEM with
full travel. Limit switches set up correct.
New air filters and spark plugs have been supplied but not fitted to prevent damage in transit. Old filters and plugs re-fitted to the
engine to prevent dirt ingress to engine.
Intercooler and jacket water system pressure tested to 4.5 bar with no leaks.
Both turbo chargers type RR221 -14 have been returned to the manufacturer for overhaul. The details of which have been
supplied on a previous report.
New control batteries have been fitted to the generator control pa nel and a new battery charger.
All associated pumps and fan motors associated with the generator have been run under electrical power
and proved correct.
Throttle has bee re-calibrated through the TEM system. All engine sensors are indicating correct ba ck to the TEM system.
The TEM CPU has been upgraded to version 2.29, and the operating terminal has been upgraded to the latest touch
screen version.
The TEM system has been re -installed with all the original commissioning parameters and additional 24 messages
Holditch #3 - 2200100
All 16 cylinder heads replaced by service exchange cylinder heads from the Deutz German Xchange centre. All associated valve
gear re-assembled and set to the correct clearances.
Both intercoolers completely stripped and rebuilt using all new gaskets and seals. All aluminium covers, top and bottom, have
been replaced using cast covers.
Both gas mixers cleaned, checked and lubricated. Contr ol of both gas mixers checked correct and tested from the TEM with
full travel. Limit switches set up correct.
New air filters and spark plugs have been supplied but not fitted to prevent damage in transit. Old filters and plugs re-fitted to the
engine to prevent dirt ingress to engine.
Intercooler and jacket water system pressure tested to 4.5 bar with no leaks.
Both turbo chargers type RR221 -14 have been returned to the manufacturer for overhaul. The details of which have been
supplied on a previous report.
New control batteries have been fitted to the generator control panel.
All associated pumps and fan motors associated with the generator have been run under electrical power
and proved correct.
Throttle has bee re-calibrated through the TEM system. All engine sensors are indicating correct back to the TEM system.
The TEM CPU has been upgraded to version 2.29, and the operating terminal has been upgraded to the latest touch
screen version.
The TEM system has been re -installed with all the original commissioning parameters and additional 24 messages
Please find below details of the repairs carried out on each turbocharger by serial number as part of the E50 services . HT
Turbine casing replaced on all four above serial numbers, due to cracks which have formed in the involute section of the
www.Alborzgenerator.com
Bargh Afshan Alborz
turbine casing. Large parts of the casing has broken away as a consequence on all four turbine casings.
As a result of the cracked turbine cas ing breaking away, the turbine blades have sustained foreign object damage on all four
turbochargers. This has caused an in balance resulting in excess wear to the shaft, requiring the shafts to be
replaced as a consequence on the four above turbo’s.
All four of the above turbochargers have had the normal service parts exchanged, piston rings, O seals etc. HT 428708
Turbine casing replaced due to cracks which have formed in the involute section of the turbine casing. Large parts of the casing
has broken away as a consequence on the turbine casing.
As a result of the cracked turbine casing breaking away, the turbine blades have sustained foreign object damage. The
compressor wheel has been dressed up.
The above turbocharger has had the normal service parts exchanged, piston rings, O seals etc. HT 428709
Turbine casing replaced due to cracks which have formed in the involute section of the turbine casing. Large parts of the casing
has broken away as a consequence on the turbine casing.
As a result of the cracked turbine casing breaking away, the turbine blades have sustained severe foreign object damage
which has resulted in the replacement of the compressor wheel.
The above turbocharge has had the normal service parts exchanged, piston rings, O seals etc.