You are on page 1of 3

Date of Reporting: 05/11/2020

Information Sheet for DPR preparation


Sl Division Block Name Rank of CUCPL Road Name Eligible Length of Road
(Km)

1 2 3 4 5 6
1 SILAPATHAR MEDICAL TO
4 GALUA 6.52

2 SILAPATHAR MASJID TO
7 MES TINIALI VIA 5.41
AMRITPUR MITHUN
PATHAR
3 PUKIA TO AKAJAN
Jonai Territorial Road LIKABALI ROAD AT
Sissiborgaon 11 4.54
Division KHANAMUKH VIA
BETONIPAM
4 MECHAKI TANGANI TO
14 BHADIA CHUK VIA 3.02
SINGIBIL

5 T-02 DIMOW TO
15 BHOIRABPUR VIA 6.1
BUDHBARIA

Total Length for the Block (in Km) 25.59


MISAMARA TINIALI TO SEREN
1 10 SIMEN CHAPARI TINIALI TO 5.1
CHAPARI VIA HANDIQUE
2 Jonai TRD Murkongselek 13 TADUNIA VIA JURKATIA 5.9
ANNAPUR SOMKONG
JONAI BAZAR CT TO BAHIR
3 15 SILAI 10.2
Total Length for the Block (in Km) 21.2

Note: (1) If column 7,8 and 10 are done then send the files to pmgsyassam3@gmail.com
(2) Total length of the Block should be within 20 to 25 Km prefarably
ormation Sheet for DPR preparation under PMGSY-3
Whether video-graphy of Assessment of tentative Whether Transect Whether Traffic Whether Road Safety Testing of Materials
existing road alignment item of works with quantity walk done (yes/ survey done Audit done (Filling up done (yes/no)
done (yes/ no) and CD nos & type (yes/ no) no) (photographs & of Road Safety
videography ) Formats as per DPR
(yes/ no) template) (yes/no)

7 8 9 10 11 12

No No No No No Yes

No No No No No Yes

No No No No No Yes

No No No No No Yes

No No No No No Yes

No No Yes No No Yes
No No No No No Yes
yes No yes No No Yes
Probable date of
submission of DPR to
STA

13

11/30/2020

11/30/2020

11/30/2020

11/30/2020

11/30/2020

11/30/2020
11/30/2020
11/30/2020

You might also like