CTI ENGINEERING INTERNATIONAL CO., LTD.

THE CONSULTANCY SERVICES FOR THE CONSTRUCTION SUPERVISION OF THE FLOOD RISK MANAGEMENT PROJECT (FRIMP) FOR THE CAGAYAN RIVER, TAGOLOAN RIVER AND
IMUS RIVER (JICA LOAN AGREEMENT NO. PH-P253)

STRAIGHT LINE DIAGRAM (Bacoor Retarding Basin A)


Progress as of December 31, 2019

INLET 1 STA. 0+328.70

Height (l.m.) Quantity (cu.m.)


Item
(m.) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Previous
This PeriodTo Date
1.00
Excavation 2.00
for sluiceway
3.00
channel 349.67 0 349.67
(common 4.00
soil) 5.00
6.00
Concreting works
Lean concrete 3.82 0.00 3.82
Bottom Slab

MANHOLE
Side Walls
4.45 3.02 7.47
Top Slab
Beam

BOX CULVERT
Bottom Slab
Side Walls
10.55 16.18 26.73
Top Slab
Head Wall
Bottom Slab 0.00 0.64 0.64

OUT
LET
Side Walls
1.00
2.00
Backfill 3.00
about sluice 4.00
structure
5.00
6.00

LEGEND:

August 2016~ November 2019 December 2019

Prepared by: Noted by:

Lemuel Jake T. Tapec Arjine I. Ramirez


Project Inspector Structural Engineer