Section at A-A, 1:50: Part No Section (MM) Quantity (Nos) Working Drawing Weight

You might also like

You are on page 1of 1

Section at A-A, 1:50

Cable Elevation, El1 = Gl + 0.30

Backfilling must be done Min. 30 Section Quantity Weight


after cable hoisting in layers Part No Working Drawing
of 30 cm thickness and good
[mm] [nos] Kg/pc total Kg
compaction of each layers Ri-Bar φ 20
required 1 l = 2400
8
2400
5.93 47.44R

............ Stirrup φ 12
2 l = 3550
14 bend stirrups
80 x 80 cm
3.15 44.10R

800
150 50
6 Bulldog Grips Bulldog Bulldog Grip for Cable φ 32 mm

φ 32 mm
3
3 Grip
φ 32
12 MS forged, according to ISI standard,
hot dip galvanized
1.30 15.60D

Trench excavation A = 107.14 kg. D = 15.60 kg. R = 91.54 kg.


required Total transportation Weight, D+R Bulldog Grips Reinforcement Steel

............ El2 = El1 - 3.55


200 640

14 Nos. Stirrups 2x4 = 8 Nos. Ri-Bars 200


2 80x80, φ 12 mm, 1
φ 20 mm, l = 2400
c/c ~ 30 cm Standard Quantities
full surface to be
Type of Construction [m3]
protected by
drystone pitching
Plan, 1:50 Concrete 1:2:4 13.60

Concrete 1:3:6 0.57

Broken Stone for Dry


2.40
Stone pitching
4 Nos. Ri-Bars
1 Total 16.57
φ 20 mm, l = 2400

Centre Line of Bridge


A A
6 Bulldog Grips
3
for Cable φ 32 mm
HMG / Ministry of Local Development
DoLIDAR / Short SpanTrail Bridge Standard
Bridge Name:
No: Bank: Span:
Steel & Construction Drawing :
14 Nos. Stirrups
2 Main Cable Deadman Anchor
φ 12 mm for Suspension Bridges, 2 Main Cables φ 32 mm
for all Soil Types in Flat Ground
Direct Cable Connection, c/c1 = 2.50 m
8.40
Anchor Type DA 6
Date : July 15, 2002 Drawing No. 42/4Ncon
Produced by Nepal Swiss Association for International Cooperation, in partnership with His Majesty’s Government of Nepal, funded and supported by the Swiss Government (SDC Nepal). 44