PROJECT:

RABIGH 2×660 MW IPP PROJECT


Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 001/T/S/RFI/NCC/U-II

Date of Request: 24-SEPT-11 Date of Inspection: 25-SEPT-11


Time of Request: 02:00 PM Time of Inspection: 10.00 AM
Inspection Request For: PRESSURE TEST
Inspection Location : MAIN TURBINE HOUSE UNIT- II

Description of Inspection Item:


PNEUMATIC TEST FOR UNDER GROUND PIPE

REF. DWG. Title /NO.: F-6741S-2103-03 REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 6.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name :
Title :
Date :
PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 002/T/S/RFI/NCC/U-II

Date of Request: 24-SEPT-11 Date of Inspection: 25-SEPT-11


Time of Request: 02:00 PM Time of Inspection: 02.00 PM
Inspection Request For: PRESSURE TEST
Inspection Location : MAIN TURBINE HOUSE UNIT- II

Description of Inspection Item:


PNEUMATIC TEST FOR UNDER GROUND PIPE

REF. DWG. Title /NO.: F-6741S-2105-01 REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 6.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name :
Title :
Date :
PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 003/T/S/RFI/NCC/U-II

Date of Request: 24-SEPT-11 Date of Inspection: 25-SEPT-11


Time of Request: 02:00 PM Time of Inspection: 11.00 AM
Inspection Request For: PRESSURE TEST
Inspection Location : MAIN TURBINE HOUSE UNIT- II

Description of Inspection Item:


PNEUMATIC TEST FOR UNDER GROUND PIPE

REF. DWG. Title /NO.: F-6741S-2105-02 REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 6.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name :
Title :
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 004/T/S/RFI/NCC/U-II

Date of Request: 25-SEPT-11 Date of Inspection: 26-SEPT-11


Time of Request: 02:00 PM Time of Inspection: 09.00 AM
Inspection Request For: PRESSURE TEST
Inspection Location : MAIN TURBINE HOUSE UNIT- II

Description of Inspection Item:


PNEUMATIC TEST FOR UNDER GROUND PIPE

REF. DWG. Title /NO.: F-6741S-2102-05 REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 6.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name :
Title :
Date :
PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 005/T/S/RFI/NCC/U-II

Date of Request: 25-SEPT-11 Date of Inspection: 26-SEPT-11


Time of Request: 02:00 PM Time of Inspection: 09.15 AM
Inspection Request For: PRESSURE TEST
Inspection Location : MAIN TURBINE HOUSE UNIT- II

Description of Inspection Item:


PNEUMATIC TEST FOR UNDER GROUND PIPE

REF. DWG. Title /NO.: F-6741S-2102-10 REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 6.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name :
Title :
Date :
PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 006/T/S/RFI/NCC/U-II

Date of Request: 28-SEPT-11 Date of Inspection: 29-SEPT-11


Time of Request: 02:00 PM Time of Inspection: 10.00 AM
Inspection Request For: ELEVATION CHECK
Inspection Location : MAIN TURBINE HOUSE UNIT- II

Description of Inspection Item:


VISUAL INSPECTION & ELEVATION CHECK FOR UNDER GROUND PIPE

REF. DWG. Title /NO.: F-6741S-J2102-05, J2102-10 & J2103-03, REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 5.1, 5.2 & 5.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H W W
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark if Any:

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC

Signature:

Name :
Title :
Date :
PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 007/T/S/RFI/NCC/U-II

Date of Request: 28-SEPT-11 Date of Inspection: 29-SEPT-11


Time of Request: 02:00 PM Time of Inspection: 10.30 AM
Inspection Request For: ELEVATION CHECK
Inspection Location : MAIN TURBINE HOUSE UNIT- II

Description of Inspection Item:


VISUAL INSPECTION & ELEVATION CHECK FOR UNDER GROUND PIPE

REF. DWG. Title /NO.: F-6741S- J2105-01 & J2105-02, REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 5.1, 5.2 & 5.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H W W
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark if Any:

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC

Signature:

Name :
Title :
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 008/T/S/RFI/NCC/U-II

Date of Request: 01-OCT-11 Date of Inspection: 2-OCT-11


Time of Request: 02:00 PM Time of Inspection: 09.00 AM
Inspection Request For: PRESSURE TEST
Inspection Location : MAIN TURBINE HOUSE UNIT- II

Description of Inspection Item:


PNEUMATIC TEST FOR UNDER GROUND PIPE

REF. DWG. Title /NO.: F-6741S-2105-01 REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 6.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name :
Title :
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 009/T/S/RFI/NCC/U-II Re submission
Date of Request: 10-OCT-11 Date of Inspection: 11-OCT-11
Time of Request: 12:00 AM Time of Inspection: 10.00 AM
Inspection Request For: LEAK TEST
Inspection Location : DM PLANT

Description of Inspection Item:


LEAK TEST FOR UNDER GROUND GRP PIPE

REF. DWG. Title /NO.: F6741S-H0701-03-SO1 REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 6.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name : D.K.MENON GOA HUA FENG
Title : QA/QC INSPECTOR QA/QC ENGINEER
Date :
PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 010/T/S/RFI/NCC/U-II Re submission
Date of Request: 10-OCT-11 Date of Inspection: 11-OCT-11
Time of Request: 12:00 AM Time of Inspection: 02.00 PM
Inspection Request For: LEAK TEST
Inspection Location : DM PLANT

Description of Inspection Item:


LEAK TEST FOR UNDER GROUND PIPE

REF. DWG. Title /NO.: F6741S-H0701-03-SO2 REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 6.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name : D.K.MENON GOA HUA FENG
Title : QA/QC INSPECTOR QA/QC ENGINEER
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 011/T/S/RFI/NCC/U-II Re submission
Date of Request: 10-OCT-11 Date of Inspection: 11-OCT-11
Time of Request: 12:00 AM Time of Inspection: 02.00 PM
Inspection Request For: LEAK TEST
Inspection Location : DM PLANT

Description of Inspection Item:


LEAK TEST FOR UNDER GROUND GRP PIPE

REF. DWG. Title /NO.: F6741S-H0701-03-SO3 REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 6.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □


ISSUED BY NCC SEPCOIII RABEC
Signature:
Name : D.K.MENON GOA HUA FENG
Title : QA/QC INSPECTOR QA/QC ENGINEER
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 012/T/S/RFI/NCC/U-II RE SUBMISSION
Date of Request: 15-OCT-11 Date of Inspection: 16-OCT-11
Time of Request: 09:00 AM Time of Inspection: 02.00 PM
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


HYDRO TEST FOR UNDER GROUND PIPE

REF. DWG. Title /NO.: F-6741S-H0701-03-SO8 REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 12.1 to 12.4
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

ATTACHED TEST PACKAGE No : NCC/U-II/PACK-10


ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name : D.K.MENON GOA HUA FENG
Title : QA/QC INSPECTOR QA/QC ENGINEER
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 013/T/S/RFI/NCC/U-II RE SUBMISSION
Date of Request: 15-OCT-11 Date of Inspection: 16-OCT-11
Time of Request: 09:00 AM Time of Inspection: 10.00 AM
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


PNEUMATIC TEST FOR UNDER GROUND PIPE

REF. DWG. Title /NO.: F-6741S-H0701-03-SO10 REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 12.1 to 12.4
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

ATTACHED TEST PACKAGE No : NCC/U-II/PACK-11


ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name : D.K.MENON GOA HUA FENG
Title : QA/QC INSPECTOR QA/QC ENGINEER
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 014/T/S/RFI/NCC/U-II

Date of Request: 10-OCT-11 Date of Inspection: 11-OCT-11


Time of Request: 12:00 PM Time of Inspection: 10.00 AM
Inspection Request For: ELEVATION CHECK
Inspection Location : DM PLANT

Description of Inspection Item:


VISUAL INSPECTION & ELEVATION CHECK FOR UNDER GROUND PIPE

F-6741S- H0701-03-SO1 & F-6741S- H0701-03-


REF. DWG. Title /NO.: REV.: 0
SO2, F-6741S- H0701-03-SO3
ITP NO.: NCC/M/ITP-008 Activity No.: 5.1, 5.2 & 5.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H W W
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark if Any:
ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC

Signature:

Name :
Title :
Date :

Jebraj
PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 016/T/S/RFI/NCC/U-II Re submission
Date of Request: 13-OCT-11 Date of Inspection: 15-OCT-11
Time of Request: 12:00 AM Time of Inspection: 11.00 AM
Inspection Request For: LEAK TEST
Inspection Location : TURBINE HOUSE UNIT -II

Description of Inspection Item:


LEAK TEST FOR UNDER GROUND HDPE PIPE

REF. DWG. Title /NO.: F6741S-J1308-01 SH 1OF2 REV.: 0


ITP NO.: NCC/M/ITP-008 Activity No.: 12.1 to 12.4
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:
ATTACHED TEST PACKAGE NO: NCC/U-II/PACK-12

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name : D.K.MENON GOA HUA FENG
Title : QA/QC INSPECTOR QA/QC ENGINEER
Date :

Jebraj-17
Jeberaj-18
PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 19/T/S/RFI/NCC/U-II

Date of Request: 18-OCT-11 Date of Inspection: 19-OCT-11


Time of Request: 10:00 AM Time of Inspection: 03.00 PM
Inspection Request For: PNEUMATIC TEST
Inspection Location : DM PLANT

Description of Inspection Item:


PNEUMATIC TEST FOR CPVC PIPE

REF. DWG. Title /NO.: FD-3181-1A,FD-3181-1B REV.: 2


ITP NO.: 0005-ITP-SEP-RAB Activity No.: 12.1,12.2,12.3
Previous inspection record available YES □ NO □
Action code from the ITP NCC SEPCOIII RABEC
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

ATTACHED TEST PACKAGE NO: NCC/DM/AB/13

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name : D.K.MENON GOA HUA FENG
Title : QA/QC INSPECTOR QA/QC ENGINEER
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 023/T/S/RFI/NCC/U-II

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


PRESSURE TEST FOR DN 125,200,250,350 GRE PIPE & DN 140 UPVC PIPE ( CARBON &
SAND FILTER LINE )

REF. DWG. Title /NO.: FD-3181-1A,1B,1C & 1D REV.: 2


ITP NO.: 0005-ITP-SEP-RAB Activity No.: 12.1,12.2 & 12.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE NO: NCC/DM/FW/14

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name : D.K.MENON GOA HUA FENG
Title : QA/QC INSPECTOR QA/QC ENGINEER
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 024/T/S/RFI/NCC/U-II

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


PRESSURE TEST FOR GRE PIPE ( ND 250 & 350 )

REF. DWG. Title /NO.: FPI-WPS-3181-018 ( G14,G15,G16 ) REV.: 2,1,1


ITP NO.: 0005-ITP-SEP-RAB Activity No.: 12.1 to 12.4
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE NO: NCC/DM/FW/015

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name : D.K.MENON GOA HUA FENG
Title : QA/QC INSPECTOR QA/QC ENGINEER
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 025/T/S/RFI/NCC/U-II

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


PRESSURE TEST FOR uPVC ( ND 225 & 250 ) & GRE PIPE ( ND 250 )

REF. DWG. Title /NO.: FD-3181-2D & 2E ( uPVC ) FPI-WS-3181-


018 ( G17,G18,G18A,G19,G20 )-GRE
ITP NO.: 0005-ITP-SEP-RAB Activity No.: 12.1 to 12.4
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE NO: NCC/DM/RO/016

ACCEPTED □ ACCEPTED WITH COMMENTS □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name : D.K.MENON GOA HUA FENG
Title : QA/QC INSPECTOR QA/QC ENGINEER
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 27/T/S/RFI/NCC/DM

Date of Request: 30-OCT-11 Date of Inspection: 31-OCT-11


Time of Request: 3.00 PM Time of Inspection: 11.00 AM
Inspection Request For: PRESSURE ( PNEUMATIC ) TEST
Inspection Location : DM PLANT
Description of Inspection Item:
PRESSURE ( PNEUMATIC ) TEST FOR S.S ( 316L ) PIPE ( Ø 88.9 × 5.49mm )

F6741S-H0206-02-S01(SH#1,2&3),H-0202-03
REF. DWG. Title /NO.: REV.: 0
(SH#3), H-0201-02-S03 & H0202-03-S04.
ITP NO.: 0005-ITP-SEP-RAB Activity No.: 12.1,12.2 &12.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/CA/017

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name : D.K.MENON
Title : QA/QC INSPECTOR
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 026/T/S/RFI/NCC/U-II

Date of Request: 31/10/11 Date of Inspection: 2/11/11


Time of Request: 3.00PM Time of Inspection: 11.00AM
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


PRESSURE TEST FOR UPVC PIPE ( DN 160 & 100 )

REF. DWG. Title /NO.: FD-3181-3A REV.: 0


ITP NO.: 0005-ITP-SEP-RAB Activity No.: 12.1,12.2 &12.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/RO/18

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name : D.K.MENON
Title : QA/QC INSPECTOR
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 028/T/S/RFI/NCC/U-II

Date of Request: 31-OCT-11 Date of Inspection: 01-NOV-11


Time of Request: 3.00 PM Time of Inspection: 3.00 PM
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


PRESSURE TEST FOR UPVC PIPE ( DN 225 & 100 )

REF. DWG. Title /NO.: FD-3181-3A & FD-3181-2E REV.: 0


ITP NO.: 0005-ITP-SEP-RAB Activity No.: 12.1,12.2 &12.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/CF/19

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name : D.K.MENON
Title : QA/QC INSPECTOR
Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 29/T/S/RFI/NCC/U-II

Date of Request: 1-NOV-11 Date of Inspection: 5-NOV-11


Time of Request: 3.00 PM Time of Inspection: 3.00 PM
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


PRESSURE TEST FOR A106B PLASTIC LINED PIPE ( Ø 168.7,Ø 114.3 )

REF. DWG. Title /NO.: F6741S-H0201-17 REV.: 0


ITP NO.: 0005-ITP-SEP-RAB Activity No.: 12.1,12.2 &12.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/CP/20

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 30/T/S/RFI/NCC/U-II

Date of Request: 1-NOV-11 Date of Inspection: 4-NOV-11


Time of Request: 3.00 PM Time of Inspection: 3.00 PM
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


PRESSURE TEST FOR A106B PLASTIC LINED PIPE ( Ø 219.1 X 8.18 )

REF. DWG. Title /NO.: F6741S-H0201-16 REV.: 0


ITP NO.: 0005-ITP-SEP-RAB Activity No.: 12.1,12.2 &12.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/CP/21

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 31/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


UPVC Ø 225 ( SEA WATER RO-1 FLUSHING )

REF. DWG. Title /NO.: FD-3181-2E & FD-3181-2C REV.: 0


ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2 &12.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/RO/22

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 32/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


UPVC Ø 110 ( RO-2 FLUSHING )

REF. DWG. Title /NO.: FD-3181-3C & FD-3181-3A REV.: 0


ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2 &12.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/RO/23

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 33/T/S/RFI/NCC
Date of Request: Date of Inspection:
Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


UPVC Ø 225 ( FILTER BACKWASH )

REF. DWG. Title /NO.: FD-3181-2E , FD-3181-1A & FD-3181-1B REV.: 0


ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2 &12.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/FBW/24

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 34/T/S/RFI/NCC
Date of Request: Date of Inspection:
Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


UPVC Ø 225 CHEMICAL CLEANING RO-1 & RO-2

FD-3181-2E , FD-3181-2A , FD-3181-2B


REF. DWG.NUMBER & FD-3181-3A. REVISION 0

ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2 &12.3


Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/CIP/25

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: /T/S/RFI/NCC

Date of Request: 3-NOV-11 Date of Inspection: 8-NOV-11


Time of Request: 3.00 PM Time of Inspection: 3.00 PM
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


SS DUPLEX 3”,4”,5” & 6” PIPE

REF. DWG. Title /NO.: REV.: 0


ITP NO.: 0005-ITP-SEP-RAB Activity No.: 12.1,12.2 &12.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/BP/

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 35/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


A 106B PLASTIC LINED PIPE ( 114.3,88.9) & SS 304L PIPE(88.9,114.3)

F6741S-H-0204-01 & F6741S-H-0201-01


REF. DWG.NUMBER REVISION 0

ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2 &12.3


Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/AC/26

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 36/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


SS 304L PIPE(88.9,33.3mm)

F6741S-H-0204-01,F6741S-H-0205-01
REF. DWG.NUMBER REVISION 0

ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2 &12.3


Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/CSM/27

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:
Request For Inspection And Testing
Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 38/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item:


A106B PLASTIC LINED PIPE (88.9 mm)

F6741S-H-0207-01,F6741S-H-0205-01
REF. DWG.NUMBER REVISION 0

ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2 &12.3


Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/AP/29

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 39/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item: SS 304L PIPE (88.9 mm)

F6741S-H-0207-01,F6741S-H-0205-01
REF. DWG.NUMBER REVISION 0

ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2 &12.3


Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/CP/30 - SYSTEM : CAUSTIC PUMP OUTLET

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 40/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item: A106B PLASTIC LINED PIPE (219.1 mm)

F6741S-H-0201-019
REF. DWG.NUMBER REVISION 0

ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2 &12.3


Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/EF/31 - SYSTEM : EFFLUENT

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 41/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item: A106B PLASTIC LINED PIPE (88.9 mm)

F6741S-H-0204-01 & F6741S-H-0205-01


REF. DWG.NUMBER REVISION 0

ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2 &12.3


Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/AM/32 - SYSTEM : ACID METERING

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 43/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST ( PNEUMATIC )
Inspection Location : DM PLANT

Description of Inspection Item: 316L SS PIPE ( 60.3 & 33.4 mm)

F6741S-H0202-03-S04,H0204-02-S04,H0201-
REF. DWG.NUMBER REVISION 0
02-S04 & NCC-SEPCO III-AD-3181-007-S01
ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2 &12.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/IA/34 - SYSTEM : INSTRUMENT AIR

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 44/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT

Description of Inspection Item: SUPER DUPLEX SS PIPE ( 8”,6”,5”,4”,3”)

REF. DWG.NUMBER WS-3181-123,123A,123C,123D & 123E REVISION 1,1,0,0&0

ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2 &12.3


Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/DM/BP/35 - SYSTEM : BOOSTER PUMP PIPING

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :
PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 45/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : DM PLANT to TURBINE

Description of Inspection Item: 304L SS PIPE (323.8,219.1)

F6741S-H0701-03-S08( SH#1,2 of3),


REF. DWG.NUMBER REVISION 2,1F,1&0
H0202-03-S03, J1205-01-S04.
ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/TH/DMW/36 - SYSTEM : DM WATER

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :
PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: /T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 46/T/S/RFI/NCC
Date of Request: 18-NOV-11 Date of Inspection: 19-nov-11
Time of Request: Time of Inspection:
Inspection Request For: Line Inspection
Inspection Location : DM PLANT TO TURBINE

Description of Inspection Item: LINE CHECKING & PUNCHLISTING BEFORE HYDROTEST

F6741S-H-0701-03-S08 (SH # 1,2 &3 of 3 )


REF. DWG. Title /NO.: REV.: 2,1F,1&0
H-0202-03-S03 & J-1205-01-S04.
ITP NO.: 005-ITP-SEP-RAB Activity No.: 12.1 & 12.2
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

ACCEPTED □ ACCEPTED □ REJECTED □

NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :
PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 47/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : TURBINE HOUSE UNIT - I

Description of Inspection Item: A312-TP316L ( 323.8,219.1 & 168.3 )

REF. DWG.NUMBER F6741S-J1205-01-S02( SH#1of 1 ) REVISION 0

ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.3


Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/TH/CP/37 - SYSTEM : CONDENSATE PUMP INLET

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :
Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 48/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: LINE INSPECTION
Inspection Location : TURBINE HOUSE UNIT - I
Description of Inspection Item: LINE CHECKING & PUNCHLISTING BEFORE HYDROTEST
A312-TP316L ( 323.8,219.1 & 168.3 )

REF. DWG.NUMBER F6741S-J1205-01-S02( SH#1of 1 ) REVISION 0

ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2


Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

SYSTEM : CONDENSATE PUMP INLET

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:
Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 49/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: LINE INSPECTION
Inspection Location : TURBINE HOUSE UNIT - I
Description of Inspection Item: LINE CHECKING & PUNCHLISTING BEFORE HYDROTEST
A312-TP316L ( Ø 273 & 168.3 )

F6741S-J1205-01-S03( SH#1&2of 3 ),
REF. DWG.NUMBER REVISION 1F,0,0&0
J1205-04,J1206-01
ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

SYSTEM : CONDENSATE PUMP OUTLET TO DEAERATOR.

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 50/T/S/RFI/NCC

Date of Request: 22/11/11 Date of Inspection:


Time of Request: 9.00 AM Time of Inspection:
Inspection Request For: PRESSURE TEST
Inspection Location : TURBINE HOUSE UNIT - I

Description of Inspection Item: A312-TP316L ( 273 & 168.3 ),304L (273)

F6741S-J1205-01-S03 (SH#1&2of 3),


REF. DWG.NUMBER REVISION 1F,0,0&0
J1205-04, J1206-01.
ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.3
Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

TEST PACKAGE # NCC/TH/CP/38 - SYSTEM : CONDENSATE PUMP OUTLET TO


DEAERATOR

ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department TURBINE
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 51/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: LINE INSPECTION
Inspection Location : TURBINE HOUSE UNIT - I
Description of Inspection Item: LINE CHECKING & PUNCHLISTING BEFORE HYDROTEST
A106B ( Ø 219.1mm )

REF. DWG.NUMBER F6741S-J1205-01-S01 , J1205-06 REVISION 0

ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2


Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

SYSTEM: CONDENSATE BLOW-OFF.

ACCEPTED □ ACCEPTED □ REJECTED □


ISSUED BY NCC SEPCOIII RABEC
Signature:

Name :

Title :

Date :

PROJECT:
RABIGH 2×660 MW IPP PROJECT
Owner: Consultant: Contractor: Subcontractor:

Request For Inspection And Testing


Inspection Notification No.: T/S/RFI/SEP/RAB Department DM PLANT
From: NCC To: SEPCOIII/RABEC
NCC Notification No.: 53/T/S/RFI/NCC

Date of Request: Date of Inspection:


Time of Request: Time of Inspection:
Inspection Request For: LINE INSPECTION
Inspection Location : DM PLANT
Description of Inspection Item: LINE CHECKING & PUNCHLISTING BEFORE HYDROTEST
Super Duplex

REF. DWG.NUMBER WS-3181-123,123A REVISION 1

ITP NUMBER 0005-ITP-SEP-RAB Activity Number 12.1,12.2


Previous inspection record available YES □ NO □
NCC SEPCOIII RABEC
Action code from the ITP
H H H
ISSUED BY NCC SEPCOIII RABEC
SIGNATURE
Result Of Inspection And Testing
Other Remark If Any:

SYSTEM: BOOSTER PUMP.


ACCEPTED □ ACCEPTED □ REJECTED □

ISSUED BY NCC SEPCOIII RABEC


Signature:

Name :

Title :

Date :