The document is a table summarizing potential site swap scenarios at 4 physical UMTS sites in England. It includes details of the technology, region, vendor, site name, ID, priority level, suspected swap scenario, additional comments, date visited, and owner for each site. The status, swap detection comments, and latest actions are also noted for issues identified at the sites.
The document is a table summarizing potential site swap scenarios at 4 physical UMTS sites in England. It includes details of the technology, region, vendor, site name, ID, priority level, suspected swap scenario, additional comments, date visited, and owner for each site. The status, swap detection comments, and latest actions are also noted for issues identified at the sites.
The document is a table summarizing potential site swap scenarios at 4 physical UMTS sites in England. It includes details of the technology, region, vendor, site name, ID, priority level, suspected swap scenario, additional comments, date visited, and owner for each site. The status, swap detection comments, and latest actions are also noted for issues identified at the sites.
y Region Vendor Site name Site ID Priority Swap Bo Owner
Scenario Comment Visited
UMTS ENG ZTE UAB0515 AB0515 P1 AB0515X,AB0515Z
Checks to Checks be donetoon beall sectors. 10/20/2020 Udoka BE0450W,BE done on all UMTS ENG ZTE UBE0450 BE0450 P2 0450U sectors. Checks to be 11/11/2020 Udoka BE0459Y,BE0 done on all UMTS ENG ZTE UBE0459 BE0459 P2 459X sectors. Checks to be 10/11/2020 Udoka EN0384U,EN0 done on all UMTS ENG ZTE UEN0384 EN0384 P2 384V sectors. 9/11/2020 Udoka Swap Swap Swap Huawei Nokia Nokia Latest correction Detected comment Status Detected? Batch # Feedback Remark Action Status Yes.Swap Antenna between port the Sectors 1 and misalignment Yes. Antenna The CPRI cable port swapped 3 and between sectors 1 Closed and 3 on the FS card YES Batch-14 In progress In progress - - configuration misalignment Yes. Antenna Antenna port mismatch realigned and port and configuration mismatch Closed correctedYES Batch-14 In progress In progress - - configuration misalignment Antenna mismatch port realigned to match the Closed and configuration YES Batch-14 In progress In progress - - configuration Antenna port mismatch realigned and configuration mismatch Closed correctedYES Batch-14 In progress In progress - - CAD-Batch-13 Region/RAT Count ENG 4 UMTS 4 Total 4
Malwa-Ii - Punch Point Status As On 04-May-19 SR No. Received From Uom Grand Total Balance Liquidated As On 27-Apr-19 Liquidated This Week Liquidated As On 04-May-19