PROJECT CAMBODIA-CHINESE POLYTECHNIC UNIVERSITY

PILING WORK RECORD LIST


No Pile Code Diameter Level & Depth
(mm) Top Casing Drilled Depth Bot. Lv (Actual) Depth (Actual) Exst. Ground

1 P10F

1 P6BF

1 P5BE 600 11.158 40.080 40.922 39.672 1.250

2 P9D 800 11.344 0.656 1.250

3 P9F 800 11.415 0.585 1.250

4 P6DF 600 11.347 35.800 36.453 1.250

5 P5F 800 11.225 42.080 42.855 1.250

6 P11B 800 11.131 41.900 42.769 1.250

7 P11E 800 11.181 42.900 43.719 1.250

8 P5D 800 11.196 38.500 39.304 1.250

9 P5A 800 11.186 42.000 42.814 1.250

10 P9A 800 11.107 41.500 42.393 1.250

11 P11A 800 11.278 41.300 42.022 1.250

12 P4F 800 11.078 41.900 42.822 1.250


12 P4F 800 11.078 41.900 42.822 1.250

13 P8F 800 11.327 41.550 42.223 1.250

14 P10Da 800 11.169 42.190 43.021 1.250

15 P2D 800 11.159 42.900 43.741 1.250

16 P11D 800 11.196 41.650 42.454 1.250

17 P2B 800 11.196 40.970 41.774 1.250

18 P8D 800 11.174 0.826 1.250

19 P3Da 800 11.006 0.994 1.250

20 P10Db 800 10.965 41.900 42.935 1.250

21 P2E 800 11.097 0.903 1.250

P6Da

P8BE

P3F

P5CE

P5DE
P5DE

P8CE

PR1

P1B

P5B

P8DE

PR6

P8AE

PR7

Date Work Done % Complete


27-Nov-18 30/70 42.86 %

Pile P5BE
Exsting Ground Level +12.000
Pile Length 42 m
Top Casing Level +11.158
of Bored Hole (From Top Casing) 41.158
Depth of Bored Hole (Actual) 40.080
Error (m) -1.078
Pile P6DF
Exsting Ground Level +12.000
Pile Length 36 m
Top Casing Level +11.347
of Bored Hole (From Top Casing) 35.347
Depth of Bored Hole (Actual) 35.800
Error (m) 0.453
CHNIC UNIVERSITY
LIST
Remark
Bot. Lv (design) Cut Off
No inpsection form
submitted; length update is
47m at site

No Bentonite Test

Depth is error due to the


42 8.625 broken of cutting head of
drilling machine

42 9.325

42 9.325

36 10.375

42 9.325

42 9.325

42 9.325

Mr. Khisan confirmed on Not


42 9.325
enough drilled depth
Concrete adjust admixture,
over time of concrete working
42 9.325 hour, & removed tremie
higher than concrete level
(cast 2 m3 in BP)
Rebar cage is broken due to
42 9.325 no cut hanger bar, not found
spiral bar after lap length

42 9.325

42 9.325
42 9.325

Concreting without site


42 9.325
engineer

42 9.125

42 9.325

42 9.325

42 9.325

42 9.325

42 9.125

42 9.125

42 9.325

Concrete proportion was


mixed with slurry block &
dried concrete block with set
before working hour. REF:
SlumpDefect List #001
of concrete change
speedy just after 1hr
concreting, Concrete was
mixed with water. REF: Defect
containedList #002 material,
foreign
piece of cloth & solid clay
block. REF: Defect List #003
Remove casing without
checking vertical.
than 5 times REF: Defect
diameters far
from each other and under 24
hrs).
Concrete contain harden
concrete
Castingblock on pumping-
concrete next to
P5CE (less than 5 times
diameter far from each other
and under 24 hrs). REF:
and under 24 hrs). REF:
Defectproportion
Concrete List #004 was
mixed with pieces of wood &
dried concrete block with set
before working hour. REF:
Defect List #005
Concrete proportion
contained dried concrete
block with set before working
hour. REF: Defect List #005
Concrete mixture of CM-42
contain a brick block on
pumping-truck's sieve. REF:
Defect List #006
Actual Depth is 41.5m from
top casing. Design 45.0m for
the total depth. Top casing
level 11.093
Concrete proportion
contained dried concrete
block with set before working
hour.

Defect List 007

Cleaning bottom level of


bored hole

Cleaning bottom level of


bored hole from 35.5m to
36.3m