Seismic and Durability Design: Verification For Re-Bars Corrosion Caused by The Ingress of Chloride Ions
Seismic and Durability Design: Verification For Re-Bars Corrosion Caused by The Ingress of Chloride Ions
塩化物イオンの侵入に伴う鋼材腐食
に関する耐久性照査
Site Investigation close to the sea (corrosion and repair)
7
Chloride Concentration Cl-
6
5
4
(kg/m)
3
3
2
1
0
Re-deterioration
Corrosion of PC steel
Concentration of Chloride
単位: kg/m3
海側 深さ 山側
40~60mm
6.4
20~40mm
3.8
3.7
3.2
0~20mm
2.9
2.1
1.5
1.2
1.1
0.8
0.9
0.3
0.2
0.0
0.0
0.0
0.1
海風
7.4
4.8
4.6
5.7
3.6
3.2
2.5
1.9
1.7
0.9
0.8
0.5
2.1 1.8
0.1
0.0
3.9 3.6
Effect of Carbonation
Cl- Cl-
Cl- Cl-
Releasing of
Cl Cl
fixed chlorides
Condensation of Chlorides
in the surface of Cover Concrete
Cl- in environment ≧ Cl- in surface concrete Cl- in environment ≦ Cl- in surface concrete
Cl- Cl-
Cl- Cl Cl Cl- Cl Cl
Cl -
Cl -
++++++++++++++++++++++++ Cl -
Cl
++++++++++++++++++++++++-
Cd
γi ≤ 1.0 ・・・・ (1)
Clim
where,
Electric Protection
Severe chloride ambient conditions
Cathodic Protection
亜鉛シート工法 チタン溶射工法,チタン亜鉛溶射工法 チタンロッド挿入工法
1st span 2nd span 3rd span 4th span 5th span 6th span 7th span
チタングリッド工法 チタンメッシュ工法
Life-cycle cost calculation for a railway bridge
12 Electric Protection
0 10 20 30 40 50 60 70 80 90
time (year)