Statement I

Statement of extra widening beyond paved shoulder


Name of Work: Strengthening of Existing Road inchuding slope & uphill protection and Road Side covered drain
at built uparea alongwith Junction Improvement from Ch 0.00 to 23.700 km (L= 23.700 km ) of NH 153 under
Annual Plan 2020 21,.

Location Chainage (km) Length Width LHS/RHS Area

(km) (m) (m) (sqm)


From To

5th 4.500 4.700 400.00 1.50 LHS RHS 1200.00

6th 100 5.200 200.00 1.50 LHS RHS 600.00

6th& 7th 5.800 6.000 400.00 1.50 LHS RHS 1200.00

11th 10.300 10.500 400.00 1.50 LHS RHS 600.00

12th 11.000 11.200 400.00 1.50 LHS RHS 600.00

12th 11.400 11.700 600.00 1.50 LHS RHS 900.00

13th 12.000 12.200 400.00 1.50 LHS RHS 1200.00

13th 12.200 12.400 200.00 1.50 RHS 600.00

15th 14.000 14.300 600.00 1.50 LHS RHS 1800.00

16th 15.200 15.500 600.00 1.50 LHS RHS 900.00

17th 16.500 16.900 800.00 1.50 LHS RHS 1200.00

Total 5000.00 Total area 10800.00

(Bikash Baruah)
Executive Engineer, PWD
NH Division, Dibrugarh.
Statement-1
shoulder
Statement of extra widening beyond paved
Name of Work: Strengthening of Existing Road including slope & uphill protection and Road Side covered drain

at built up area alongwith Junction improvement from Ch 0.00 to 23.700 km (L= 23.700 km ) of NH 153 under
Annual Plan 2020 - 21.

LHS/RHS Area
Location Chainage (km) Length Width
(km) (m) (m) (sqm)
From To

5th 4.500 4.700 LHS RHS 1200.00


400.00 1.50

6th 100 5.200 200.00 1.50 LHS RHS 600.00

6th&7th 5.800 6.000 LHS RHS 1200.00


400.00 1.50

11th 10.300 10.500 400.00 1.50 LHS RHS 600.00

12th 11.000 11.200 400.00 1.50 LHS RHS 600.00

12th 11.400 11.700 600.00 1.50 LHS RHS 900.00

13th 12.000 12.200 400.00 1.50 LHS RHS 1200.00

13th 12.200 12.400 200.00 1.50 RHS 600.00

15th 14.000 14.300 600.00 1.50 LHS RHS 1800.00

16th 15.200 15.500 600.00 1.50 LHS RHS 900.00

17th 16.500 16.900 800.00 1.50 LHS RHS 1200.00

Total 5000.00 Total area= 10800.00

(Bikash Baruah)
Executive Engineer, PWD
NH Division, Dibrugarh.