Professional Documents
Culture Documents
Etihad Towers Project: Inspection & Test Plan - Sub Structure Waterproofing System
Etihad Towers Project: Inspection & Test Plan - Sub Structure Waterproofing System
ITP Inspection
Cla Responsible Reference Type Of Verifying And Test
Description Of Activity Frequency Acceptance Criteria Code
use Person Document Inspection Records
CA
No. AMC ACC
N
1.0 APPROVAL OF QUALITY DOCUMENTS AND DRAWINGS
Check Prequalification and
PM, EM,PQM, Spec Clause &
materials/system applicator Once for Document All documents to have a minimum approval status of “B” – Approved with comments, Approved Pre-
1.1 CM, Sub Pre-Qualification H H H
documents are submitted all areas Review Incorporate and proceed with works Qualification/ M.S
Contractor Document
and approved
ITP Inspection
Cla Responsible Reference Type Of Verifying And Test
Description Of Activity Frequency Acceptance Criteria Code
use Person Document Inspection Records
CA
No. AMC ACC
N
Spec’s Clause #
* Surface is clean, dry and smooth to receive the primer as per Spec Clause #2.01.A.6.a
Check for Application of CM, SEC. & & approved Approved WIR
4.1.2 All Areas Visual * Primer applied uniformly over the surfaces covering the whole surface Spec sec:-07130 H H S
Primer QC Engr. MS,Approved Check List
clause#3.03.F.1.
Drawings
* Approved Membrane applied as specification sec:-07130 clause#3.03.d
* Corner strips at the interfaces of ver/hor surfaces applied with approved materials clause #
Check for application of CM, SEC. & Spec’s Clause #
3.03.H.1.d Approved WIR
4.1.3 4mm thk membrane & QC Engr. / Sub ,MS,approved All Areas Visual H H S
*Membrane terminated/lapped with horizontal membrane over blinding as per manufacturer Check List
Parafor M3 Contractor Shop Drg’s
recommendation (100mm at side,150mm at end) as per Material Submittal 0063/Product
Technical Data
*Membrane application completed as specified
*Mastic at the grooves cured/set Spec sec:-07130 clause # 3.03.H.1.C
Spec’s Clause #
Check for capping over the CM, SEC. & * Formwork around the peripheral of the pile installed as specification sec:-07130 clause #
& approved Approved WIR
4.1.4 pile head with approved QC Engr. / Sub All Areas Visual 3.03.H.1.e H H W
MS,Approved Check List
grout Contractor *Mixing of grout done as per the manufacturer recommendations (Material Submittal #0063)
Drawings
*Pouring of grout done and compacted properly over and around the surfaces
4.2 HORIZONTAL SURFACES AND VERTICAL SURFACE (Pile Cap & Raft)
* Surface is clean, dry and smooth to receive the primer as per clause # 3.01
* Primer applied uniformly over the surfaces covering the whole surface as per clause
#3.03.F.1
Primer,Geo-Textile Spec’s Clause # * Geotextile laid ion layers as specification sec # 07130 clause # 3.03.F.1
100g/m2,TERNAP 431 TP CM, SEC. & & approved MS, *Approved Membrane applied as specification sec:-07130 clause # 3.03.D Approved WIR
4.2.1 All Areas Visual H H W
Memberane and Geotextile QC Engr. Approved Shop * Corner strips at the interfaces of ver/hor surfaces applied with approved materials as per Check List
140g/m2 Drawings clause # 3.03.C
*Overlapping of vert/Hor membranes at interfaces applied as specification sec:-07130 clause
#3.03.E
*Termination, MEP Sleeves & Openings as per approved Shop Drawing
* Water stopper lapped and welded as recommended by the manufacturer/and as per clause
Check for installation of CM, SEC. & Spec’s Clause #
#3.03.F.2 Approved WIR
4.2.2 water stopper and injection QC Engr. / Sub ,MS,approved All Areas Visual H H W
* Injection hoses fixed at intervals/locations as specification sec:-07130clause # 3.03.H.3.a Check List
hoses Contractor Shop Drg’s
*Water stoppers are protected properly
ITP Inspection
Cla Responsible Reference Type Of Verifying And Test
Description Of Activity Frequency Acceptance Criteria Code
use Person Document Inspection Records
CA
No. AMC ACC
N
CM, SEC. & Spec’s Clause # * Geotextile membrane is laid and free from wraps as per clause # 3.03.F.1
Check for protection screed/ Approved WIR
4.2.3 QC Engr. / Sub ,MS,approved All Areas Visual * Pouring done with approved grade and finished to the levels as specified H H H
Protection Board Check List
Contractor Shop Drg’s * Curing done as specified
Check for installation of CM, SEC. & Spec’s Clause # * Water stopper lapped and welded as recommended by the manufacturer
4.3.2 water stopper and injection QC Engr. / Sub ,MS,approved All Areas Visual * Injection hoses fixed at intervals/locations as specification sec:-07130 clause # 3.03.H.3 Approved WIR H W S
hoses Contractor Shop Drg’s *Water stoppers are protected properly Check List