You are on page 1of 1

TROJAN GENERAL CONTRACTING L.L.

C
AL QRANFAL TECHNICAL SERVICES LLC (AQTS) Docment Ref. No. MSS-PAB-CLN-MEP-EL-09
Rev. No: 2
Date: 9-Aug-21
INSPECTION AND TEST PlAN FOR UNGERGROUND ELECTRICAL DUCTS/CONDUITS INSTALLATION Page. :1 OF 1

PROJECT JABEL HAFEET AMBULATORY HEALTH CENTER - AL AIN (ABU DHABI) Legend:
CLIENT MUSANDA AQTS - Al Qranfal Technical Services LLC P - Perform S - Survelliance
DEVELOPER TAMOUH INVESTMENT LLC DKC - Durat Al Khaleej Contracting LLC R - Review C - Contractor
PROJECT MANAGEMENT ROYAL ARCHITECT & PROJECT MANAGEMENT TGC - Trojan General Contracting LLC I - Inspection ITL - Independent Test Lab
CONSULTANT HEALTHCARE DESIGNERS AND PROJECTS MANGERS HDP - Helthcare Designers and Project Mang H - Hold
MAIN CONTRACTOR TROJAN GENERAL CONTRACTING RAPM-Royal Architects & Project Management A - Approval
CIVIL CONTRACTOR Durat Al Khaleej Contracting LLC TAMOUH - Tamouh Investment LLC W - Witness
MEP CONTRACTOR AL QRANFAL TECHNICAL SERVICES LLC
Inspection Points
SR.No Activity Description Mode of Check Parameters to be Verified Stage / Frquency Reference Documents Verifying / Control Testing Requirment / Responsible Person at
Data Forms Acceptance Criteria Location
AQTS DKC TGC HDP RAPM TAMOUH

Review of Suitibility for the Project Project technical specification, All the documents to have Project Engineer/
1 Material approval Documents and Grad Prior to start activities Shop Drawings ,Manufacturer's Submittal Logs minimum status of code B QA/QC Engineer R R R R&A R&A R&A
Recommendation approval

Shop Drawings / Coordination Review of Compatibillty with Project Project technical specification, Project Engineer/
2 Layout Documents specification and overall Prior to start activities Shop Drawings ,Manufacturer's Drawings Logs Approved Shop drawing QA/QC Engineer R R R R&A S S
design requirement Recommendation

Review of comprehensiveness to Project technical specification, Approved Method Project Engineer/


3 Method Statement guide the project team to Prior to start activities Manufacturer's Approved Method Statement R R R R&A S S
Documents perform the activity Recommendation Statement QA/QC Engineer

Delivery of materials & Quantity ,Quality (Type, After Material submittal Project technical specification, Material Inspection QA/QC Engineer &
4 Material Inspection Visual Make, COO etc.) approval Manufacturer's Request As per Material Submittal Store Keeper I W W I&A S S
Recommendation

As per manufacturer Project technical specification, Approved Material QA/QC Engineer &
5 Storage of materials Visual recommedation After Delivery Manufacturer's Submittal Store keeper Logs Store Keeper H S S S S S
Recommendation

After Method Statement & Project technical specification, Project Engineer/


6 Installation of UG Visual Inspection Workman Ship, Location, Material Inspection Manufacturer's WIR, Checklist Approved shop drawing, QA/QC Engineer / Site P I I H&A S S
DUCTS/CONDUITS Size & Type etc. Approval (MIR) Recommendation Approved method statement Engineer / forman

Physical After Work Completion and Project technical specification, WIR - Test Reports / Approved method Statement, Project Engineer/
7 Physical Inspection damages, Defects Workman Ship Installation Inspection Manufacturer's Specs, Local authorities QA/QC Engineer / Site P I I W&A S S
etc. Approval (WIR) Recommendation Results regilations Engineer / Forman

Functionality / After full work Completion & Project technical specification, Approved method Project Engineer/
8 Final Acceptance Visul performance Satisfactry Test Manufacturer's Snag List Statement,local authorities QA/QC Engineer / Site P I I I S S
Recommendation regilations Engineer / Forman