Ryan Hakim Permana

71180913009

307.50507 mm
a= 5685.400/0,85.29.300=

(𝐴𝑠.𝐹𝑦)/(0.85.𝐹
^′ 𝑐.𝑏) =
= 307.5051 mm

c balance

𝑐=𝑎/β1

Kasus 2: a > hf
Asumsi tulangan leleh
Cf = 0,85.f'c(b-bw)hf = 0.85.29(1000-300)65
Cw = 0.85.f'c.bw.a = 0.85.29.300.307,505
T = As.fy = 5,685,400

= 972145513.8 N.mm
●Batas atas (Tulangan Maks)●

= 3395575/ =
400

8489/300𝑥400 = 0.070
ῤball=

As max= 0.75 x ῤball x bw x d = 6300 mm²

●Batas Tulangan Minimun●


Plat sayap tertekan

As min = 404 mm² ≤ 420 Not Ok

●Batas Tulangan Minimum (Pasal 12.5.2)


Plat sayap tertarik
Asmin tidak boleh kurang dari nilai terkecil diantara;

As min = 807.774 mm²


dan

As min = 1346.291 mm²

Maka dari hasil perhitungan di peroleh


1. Mn = 972145513.8 N.mm
2. As max = 6300 mm²
3. As min = 807.774 mm²
Lx=Ly 4000 mm
hf = 65 mm
As = 5685 mm²
Fy = 400 Mpa
F'c = 29 MPa
bw = 300 mm
d= 400 mm

beff
1. ≤ L/4 = 1000 mm
2. ≤ 16 t + bw = 1340 mm
3. ≤ Lebar aktual = 3400 mm

beff = 1000 mm

≥ hf=65mm Maka Perilaku Balok T

≥ hf=65mm Maka Perilaku Balok T

= 361.7707 mm ≥ hf=75mm

= 1121575 N
= 2274000 N
= 2274000 N
8,489 mm²

Maka As min = 420