SECTION 01 43 39

MOCKUPS

PART 1 – GENERAL

1.1 SUMMARY

A. Section includes Mockups (Integrated exterior mockup, Room Mockups,


Laboratory M o c k u p s ).

1.2 DEFINITIONS

A. Mockups (General): Full-size physical assemblies that are constructed on-site.


Mockups are constructed to verify selections made under sample submittals; to
demonstrate aesthetic effects and, where indicated, qualities of materials and
execution; to review coordination, testing, or operation; to show interface between
dissimilar materials; and to demonstrate compliance with specified installation
tolerances.

1. Mockups are not Samples.

2. Unless otherwise indicated, approved mockups establish the


standard by which the Work will be judged.

B. Integrated Exterior Mockups: Mockups of the exterior envelope erected separately


from the building but on Project site, consisting of multiple products, assemblies,
and subassemblies.

C. Room Mockups: Mockups of typical interior spaces complete with wall, floor, and
ceiling finishes, doors, windows, millwork, casework, specialties,
furnishings and equipment, and lighting.

D. Laboratory Mockups: Full-size physical assemblies constructed at testing facility


to verify performance characteristics.

1.3 PREINSTALLATION MEETINGS

A. Pre-installation Conference: Conduct conference at Project site.

1. Meet with Owner’s Representative, Engineer, testing and


inspecting agency representative, installers of products to be
used in mockup, and manufacturer's representative for
aluminum curtain wall and storefront products.

2. Review requirements for each product including installation,


special details, air- or water leakage, bond testing, protection,
and work scheduling that covers mockups.
1.4 SUBMITTALS
Ministry of Interior Headquarter Buildings 01 43 39-1 mockups
– Jeddah
A. Shop Drawing: Show elevation, plan, and details for proposed mockup. Include
site location map to indicate location of mockup and orientation of face.

B. List of Materials Used in Constructing Mockups: List generic product names


together with manufacturers, manufacturers' product names, model numbers,
source of supply, and other information as required to identify materials used.

1. Submittal is for information only. Neither receipt of list nor


approval of mockup constitutes approval of deviations from the
Contract Documents unless such deviations are specifically
brought to the attention of Engineer and approved in writing.

C. Product Data: Copies of Product Data for mockup materials indicating review
and approval by Engineer.

1. Submit approved copies in a single package in electronic PDF


format unless otherwise directed. Incomplete submittal
packages will not be accepted.

D. Photography Log: List of photographs in thumbnail format with annotations


indicating subject and date taken.

1. Included header/footer on each page with name of Project,


Owner, and Engineer.

2. Format: Electronic PDF format.

1.5 COORDINATION

A. Coordinate schedule for construction of mockup so that mockup can be reviewed


and approved in a timely fashion without impact to the Project schedule

B. Product Data: Copies of Product Data for mockup materials indicating review
and approval by Engineer.

1. Submit approved copies in a single package in electronic PDF


format unless otherwise directed. Incomplete submittal packages
will not be accepted.

C. Photography Log: List of photographs in thumbnail format with annotations


indicating subject and date taken.

1. Included header/footer on each page with name of Project,


Owner, and Engineer.

2. Format: Electronic PDF format.

PART 2 – PRODUCTS
(Not Used)

Ministry of Interior Headquarter Buildings 01 43 39-2 mockups


– Jeddah
PART 3 - EXECUTION

3.1 INSTALLATION

A. Before installing portions of the Work requiring mockups, build mockups for each
form of construction and finish as directed.

1. Build mockups in location and of size and profile indicated or, or


as directed by the Owner’s Representative.

2. Notify the Owner’s Representative a minimum of 5 days in


advance of dates and times when mockups will be constructed
and able to be inspected.

3. Employ supervisory personnel to oversee mockup construction.


Employ same workers that will be employed during the
construction of Project.

4. Demonstrate the proposed range of aesthetic effects and


workmanship.

5. Commence the Work after mockup has been inspected and


approved in writing by Owner’s Representative.

6. The mockup will establish the standard of quality of


workmanship by which the Work will be judged.

7. Maintain mockups during construction in an undisturbed


condition as a standard for judging the completed Work.
Failure to maintain the mockup, until directed, will be cause for
rejection of the Work.

8. Demolish and remove mockups when directed unless


otherwise indicated.

B. Mockup Types: Construct mockup in accordance with approved shop drawings,


project manual, and Contract Drawings, using exact materials and methods
approved for the Project, including required accessories.

1. Integrated Exterior Mockups: Coordinate installation of


exterior envelope materials and products for which mockups are
required in individual Specification Sections and supporting
materials.

2. Room Mockups: Construct mockups incorporating required


materials and assemblies, finished according to requirements.
Provide required lighting and additional lighting where required
to enable the Owner’s Representative to evaluate quality of the
Work.

3. Laboratory Mockups: Comply with requirements of


Ministry of Interior Headquarter Buildings 01 43 39-3 mockups
– Jeddah
preconstruction testing and those specified in individual
Specification Sections.
.
C. Photographs: Take photographs using the maximum range of depth of field, and
that are in focus, to clearly show the Work. Photographs with blurry or out-of-
focus areas will not be accepted.

1. Maintain key plan with each set of construction photographs that


identifies each photographic location
.
2. Take photographs as each product is installed clearly
showing special techniques or details used.

3. Maintain digital file of photographs in field office for


reference by Engineer, Owner, and Installer.

D. Review and Approval:

1. Obtain written approval of integrated exterior mockups from


Owner and Engineer before starting work, fabrication, or
construction.

2. Allow seven days for review and re-review of each product


installed.

3. Allow fourteen days for review of completed mockup.

4. Approval of mockups does not constitute approval of


deviations from the Contract Documents contained in
mockups unless such deviations are specifically approved
by Engineer in writing.

5. Maintain integrated exterior mockups during construction in


an undisturbed condition as a standard for judging the
completed Work

E. Build mockups as indicated on Drawings and according to approved Shop


Drawings. Coordinate installation of exterior envelope materials and products for
which mockups are required in individual Specification Sections, along with
supporting materials.

1. Provide supplementary framing as required to support


mockup and so that mockup can withstand wind requirements.
Do not install supplementary framing in a way that impairs the
visual quality of the mockup face or that interferes with ability of
Engineer and Owner to review installation of mockup
components.

F. Commence erection of integrated exterior mockup only after obtaining


Engineer’s approval of Product Data, Shop Drawings, and Samples for each
product to be included in the mockup.

G. Employ supervisory personnel who will oversee mockup construction. Employ

Ministry of Interior Headquarter Buildings 01 43 39-4 mockups


– Jeddah
workers that will be employed during the construction at Project.

H. Photographs: Take photographs using the maximum range of depth of field, and
that are in focus, to clearly show the Work. Photographs with blurry or out-of-
focus areas will not be accepted.

1. Maintain key plan with each set of construction photographs that


identifies each photographic location.

2. Take photographs as each product is installed clearly


showing special techniques or details used.

3. Maintain digital file of photographs in field office for


reference by Engineer, Owner, and Installer.

I. Review and Approval: Obtain written approval of integrated exterior mockups from
Owner and Engineer before starting work, fabrication, or construction.

1. Allow seven days for review and re-review of each product


installed.

2. Allow fourteen days for review of completed mockup.

3. Approval of mockups does not constitute approval of


deviations from the Contract Documents contained in
mockups unless such deviations are specifically approved
by Engineer in writing.

4. Maintain mockups during construction in an undisturbed


condition as a standard for judging the completed Work.

5. Demolish and remove mockups when directed unless otherwise


indicated.

3.2 FIELD QUALITY CONTROL

A. Testing Agency: Owner will engage a qualified testing agency to perform tests
and inspections.

END OF SECTION