You are on page 1of 9

LEARNERS’ ACHIEVEMENT MONITORING REPORT

Name of TVI : RTTCL GUIGUINTO BULACAN


Program Title : Electrical Installation and Maintainance NCII
Batch / Section: 1
Module Title : common (24 hours

L.O. 1.Using Hand Tools 5 Hrs


Name of learners Plan and prepare for Prepare hand tools .Use appropriate hand tools and ..Maintain hand tools
NO (Last Name, First Name. M tasks to be undertaken test equipment Institutional assessment

Task task task task


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

24

This is to certify that all entries in the above learners’ achievement monitoring report are true and correct
Prepare by: checked by: Approved by:

Diomedes M. Serafines Jeffrey M. Guevarra Rheo Henry Rodrigues


Trainor EIM NC II VIS Center administrator
LEARNERS’ ACHIEVEMENT MONITORING REPORT
Name of TVI : RTTCL GUIGUINTO BULACAN
Program Title : Electrical Installation and Maintainance NCII
Batch / Section: 1
Module Title : common ( 24 hrs)

L.O. 2 Performing Mensuration and Calculation 4 hrs

NO Name of learners Institutional assessment


(Last Name, First Name. M
Select measuring Carry out Use appropriate hand tools Maintain measuring
instrument measurements and and test equipment instruments protection and
calculation grounding systems

Task Task Test Task Task


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

This is to certify that all entries in the above learners’ achievement monitoring report are true and correct
Prepare by: checked by: Approved by:

Diomedes M. Serafines Jeffrey M. Guevarra Rheo Henry Rodrigues


Trainor EIM NC II VIS Center administrator
LEARNERS’ ACHIEVEMENT MONITORING REPORT
Name of TVI : RTTCL GUIGUINTO BULACAN
Program Title : Electrical Installation and Maintainance NCII
Batch / Section: 1
Module Title : Common (240 hrs

L.O. 3 Preparing and Interpret Technical Drawing 5 hrs I

NO Name of learners Identify different kinds of Interpret technical drawing Prepare/ make changes to Store technical drawings Institutional assessment
(Last Name, First Name. M technical drawings electrical/ electronic schematics and equipment/ instrument
and drawings
Task Task Task Task

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
/
This is to certify that all entries in the above learners’ achievement monitoring report are true and correct
Prepare by: checked by: Approved by:

Diomedes M. Serafines Jeffrey M. Guevarra Rheo Henry Rodrigues


Trainor EIM NC II VIS Center administrator

LEARNERS’ ACHIEVEMENT MONITORING REPORT


Name of TVI : RTTCL GUIGUINTO BULACAN
Program Title : Electrical Installation and Maintainance NCII
Batch / Section: 1
Module Title : common (24 Hrs )

L.O. 4 Applying Quality Standards 5 hrs


Assess quality of received materials Assess own work Engage in quality improvement2
NO Name of learners or components Institutional assessment
(Last Name, First Name. M Task Tasl Task

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

This is to certify that all entries in the above learners’ achievement monitoring report are true and correct
Prepare by: checked by: Approved by:

Diomedes M. Serafines Jeffrey M. Guevarra Rheo Henry Rodrigues


Trainor EIM NC II VIS Center administrator
LEARNERS’ ACHIEVEMENT MONITORING REPORT
Name of TVI : RTTCL GUIGUINTO BULACAN
Program Title : Electrical Installation and Maintainance NCII
Batch / Section: 1
Module Title : common (24 Hrs )

L.O. 5 Terminating and Connecting Electrical Wiring and Electronic Circuits 5 hrs
Plan and prepare for termination/ Terrminate / connect electrical wiring/ Test ,termination/ connections of
NO Name of learners connection of electrical electronic circuits electrical wire Institutional assessment
(Last Name, First Name. M Task Task Task
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

This is to certify that all entries in the above learners’ achievement monitoring report are true and correct
Prepare by: checked by: Approved by:

Diomedes M. Serafines Jeffrey M. Guevarra Rheo Henry Rodrigues


Trainor EIM NC II VIS Center administrator
LEARNERS’ ACHIEVEMENT MONITORING REPORT
Name of TVI : RTTCL GUIGUINTO BULACAN
Program Title : Electrical Installation and Maintainance NCII
Batch / Section: 1
Module Title : core (154)

L.O. 1 Performing roughing-in activities, wiring and cabling works for single-phase distribution, power, lighting and auxiliary systems 70 hrs
Name of learners
NO (Last Name, First Name. M nstitutional assessment

L.O. 11Install electrical L,O. 2 2Install wire ways L.O. 3 Install auxiliary L.O. 4 Prepare for L..O 5 Perform L.O. 6 Notify
metallic /non- metallic and cable trayInstall terminal cabinet and cable pulling and wiring and cabling completion of work
(PVC conduit electrical metallic /non- distribution panel- installatioN lay out
metallic (PVC conduit)

Task Task Task Task Task Task


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

This is to certify that all entries in the above learners’ achievement monitoring report are true and correct
Prepare by: checked by: Approved by:

Diomedes M. Serafines Jeffrey M. Guevarra Rheo Henry Rodrigues


Trainor EIM NC II VIS Center administrator
LEARNERS’ ACHIEVEMENT MONITORING REPORT
Name of TVI : RTTCL GUIGUINTO BULACAN

Program Title : Electrical Installation and Maintainance NCII


Batch / Section: 1
Module Title : core ( 154 hrs)

L.O. 2 InstalIing electrical protective devices for distribution, power, lighting, auxiliary, lighting (44 Hrs)
Plan and prepare work Install electrical Install lighting fixture and auxiliary L.O. 4 Notify completion of
NO Name of learners outlet ing/ electronics circuit work Institutional assessment
(Last Name, First Name. M
protective devices
Task Task Task Task
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

This is to certify that all entries in the above learners’ achievement monitoring report are true and correct
Prepare by: checked by: Approved by:

Diomedes M. Serafines Jeffrey M. Guevarra Rheo Henry Rodrigues


Trainor EIM NC II VIS Center administrator
LEARNERS’ ACHIEVEMENT MONITORING REPORT
Name of TVI : RTTCL GUIGUINTO BULACAN
Program Title : Electrical Installation and Maintainance NCII
Batch / Section: 1
Module Title : core 154 Hrs)

. L.O. 3 Installing wiring devices of floor and wall mounted outlets, lighting fixtures/switches, and auxiliary outlets ( 40 hrs)

NO Name of learners .Select wiring devices Install wiring devices Install lighting light fixture / switch Notify completion of work Institutional assessment
(Last Name, First Name. M Wiring/ electronics circuit
Task Task Task Task
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

This is to certify that all entries in the above learners’ achievement monitoring report are true and correct
Prepare by: checked by: Approved by:

Diomedes M. Serafines Jeffrey M. Guevarra Rheo Henry Rodrigues


Trainor EIM NC II VIS Center administrator