Date 03.11.2020
Sr. No. M/c Detail Dir. No Particuler Cause Photos Remarks Order Details
Page 1 of 5
Executive Summary Report
Sr. No. M/c Detail Dir. No Particuler Cause Photos Remarks Order Details
Breaker was not getting trip in replaced coil & corrected control.
LV breaker Both closing/tripping coil
3 single shot and proble with 52A Tripping arm length decreased by 3-4
found burnt.
auxillary contact mm.
Page 2 of 5
Executive Summary Report
Sr. No. M/c Detail Dir. No Particuler Cause Photos Remarks Order Details
2 Breaker not getting trip in single shot… Problem with trip arm length. Arm length deacreased by 3-4 mm.
also trip coil found burnt
HV ER Fault not tripping in correct problem with open delta PT it Settled to ND for now..will analyse next
3 TR 3 5
direction... self… time for solution.
8 LV B phase & Y Phase CRM over 1 problem with Y phase top and B cleaned.. fitted again..new CRM <90
mohm... ph both contacts... Microhm
Page 3 of 5
Executive Summary Report
Sr. No. M/c Detail Dir. No Particuler Cause Photos Remarks Order Details
LV B-Phase LA IR 22 Mohm
5 Consider replacement
Cooling Circuit not working... Control Will fix it next time by using TR3 control
6
transformer primary found open. transformer.
1 CRM R-Y-B Phases over 1 mohm... problem with Top jumpers of all cleaned...new CRM under 80 Microhm
phase...
5 FDR 1
2 Breaker electrical operation issues MCB it self faulty.. interchanged with heater supply MCB
from either side…
6 FDR 2 1 CRM R-ph 500 Microhm... problem with top jumper... new CRM 69 Microhm
cleaned…
1 spring charge issues... Motor to MCB cable faulty.. *Motor work fine now but further Motor
shaft to spring charge mechanical
issues... Lockey missing
7 FDR 3
B-Y phase CRM over 700 Microhm Problem with Top jumpers..
2 New <70 Microhm
Ohm… Cleaned..
Page 4 of 5
Executive Summary Report
Sr. No. M/c Detail Dir. No Particuler Cause Photos Remarks Order Details
9 Comm
2 DC leakage +Ve 90 -Ve 18 Please find cause path and get it rectfy
END