Executive Summary Report

Site Jhangi, Gujarat 66 KV SS

Date 03.11.2020

Sr. No. M/c Detail Dir. No Particuler Cause Photos Remarks Order Details

1 LV B-ph LA IR 67 Mohm Consider replacement

cleaned.. fitted again..New CRM under 80


2 CRM B-Y 1000 Microhm... problem with top jumper...
Microhm

replaced also tripping arm length


Breaker not getting trip in single
3 Breaker Trip coil burnt.. deacresed by 3-4 mm..Single shot trip
shot confirmed

1 TR 1 4 WTI faulty.. problem with capillary tube… Unit replaced..fixed

limit switch replaced with faulty wti.. trip


5 OTI not tripping master problem with limit switch it self.
confirmed

CR 3,4 & 8 faulty..also fan & fan


to MK cables needs to check as
6 Cooling Circuit problem… Its mess..needs time...will fix Next year.
some found open..some found
short.

7 sf6 low Get it filled.

Page 1 of 5
Executive Summary Report
Sr. No. M/c Detail Dir. No Particuler Cause Photos Remarks Order Details

1 LV Y ph CRM...930 Microhm... .. problem with VI it self Consider pole replacement

problem with button jumper..


2 LV R ph CRM...1.1 Miliohm... cleaned.. new CRM 89 Microhm..

Breaker was not getting trip in replaced coil & corrected control.
LV breaker Both closing/tripping coil
3 single shot and proble with 52A Tripping arm length decreased by 3-4
found burnt.
auxillary contact mm.

.LV IDMT stage was on ND..settle


4 Direct TR trip reported.. shall prevent parallel trip from now..
to directional...

HV to LV tripping not available...for needs cable…Please arrange and keep


2 TR 2 5
auxillary protection also… ready in next year testing

Differential DUOBIAS-M relay was


6 faulty. Mew MIB-202 retrofitted

interchanged with CF8 which was is stand


7 Cooling Circuit trip if switched on. CF7 found jammed.
by fan.

8 LV B phase LA 18 Mohm IR Consider replacement

9 Flashover at neutral pit. Poor maintance Cleaned and fitted again.

Page 2 of 5
Executive Summary Report
Sr. No. M/c Detail Dir. No Particuler Cause Photos Remarks Order Details

Cable short somewhere..new faulty one by passed...also MCB was


1 Spring charging issues.. cable place..also problem with
auxillary... faulty... heater MCB used... Bypassed

2 Breaker not getting trip in single shot… Problem with trip arm length. Arm length deacreased by 3-4 mm.
also trip coil found burnt

cleaned and fitted again for now..HT


3 Multiple flashover at Neutral pit.. informed to arrange cable and extend it
to main mash

4 LV Y-Ph LA 15 Mohm IR Consider replacement

HV ER Fault not tripping in correct problem with open delta PT it Settled to ND for now..will analyse next
3 TR 3 5
direction... self… time for solution.

6 LV Closing/tripping coil faulty... TC Bcz of breaker ingle shot Replaced


Replaced tripping issue.

7 HV Y phase LA is In Bypassed condition Kindly take NA.

8 LV B phase & Y Phase CRM over 1 problem with Y phase top and B cleaned.. fitted again..new CRM <90
mohm... ph both contacts... Microhm

will fix it next time by giving simple logic


9 Cooling Circuit not working... it's mess....
with seperate contactor next year.

Open delta PT connection given


1 LV EF not getting trip in directional…
externally…ZSV settle to measure..

problem with top contacts...


2 LV R & B phase CRM...1mohm... new CRM 87 Microhm
cleaned and fitted again…

Page 3 of 5
Executive Summary Report
Sr. No. M/c Detail Dir. No Particuler Cause Photos Remarks Order Details

Problem from open delta


3 HV EF getting trip in wrong direction. Connection corrected
connection.

cleaned and fitted again..HT informed to


4 TR 4 4 Multiple flashover at Neutral pit. POOR ER
arrange cable and extend it to main mash

LV B-Phase LA IR 22 Mohm
5 Consider replacement

Cooling Circuit not working... Control Will fix it next time by using TR3 control
6
transformer primary found open. transformer.

7 Differential DUOBIAS-M relay was Mew MIB-202 retrofitted


faulty.

1 CRM R-Y-B Phases over 1 mohm... problem with Top jumpers of all cleaned...new CRM under 80 Microhm
phase...

5 FDR 1

2 Breaker electrical operation issues MCB it self faulty.. interchanged with heater supply MCB
from either side…

6 FDR 2 1 CRM R-ph 500 Microhm... problem with top jumper... new CRM 69 Microhm
cleaned…

new cable placed...fixed...

1 spring charge issues... Motor to MCB cable faulty.. *Motor work fine now but further Motor
shaft to spring charge mechanical
issues... Lockey missing

7 FDR 3

B-Y phase CRM over 700 Microhm Problem with Top jumpers..
2 New <70 Microhm
Ohm… Cleaned..

interchanged with neutral MCB... neutral


8 FDR 5 1 spring charge issues.. Phase MCB at ACDB faulty…
wire shorted... Fixed

Page 4 of 5
Executive Summary Report
Sr. No. M/c Detail Dir. No Particuler Cause Photos Remarks Order Details

Common... every SRI LA on 33 KV side


1 Kindly get it connected in proper manner.
connected without ground…

9 Comm

2 DC leakage +Ve 90 -Ve 18 Please find cause path and get it rectfy

END