You are on page 1of 5

ILM Bearing Prepared: KC Revision: 01

Revised: KC Date: 29.10.2003


Method of functioning Approved: GM Page: 1/5

mageba Incremental Launching Bearing ILM


1) General description
a) Typical cross section

During launching sliding plates have to


be rigidly supported at the protruding
ends to avoid bending of sliding plates

b) Typical top view

Bottom plate Top plate

Brackets (for launching)


O:\Marketing\03 HOMEPAGE\mageba-Homepage 2004 (V. II)\6 Unterlagen für Webpage\2 Produkte&Dienstleistungen\3 Brückenlager\2 kartei Lager\03 Downloads\04 Taktschiebelager\02 EN\1
Produkteinformationen\Alte Dokumente\ILM_Bearing_2003_10_Specification.doc
ILM Bearing Prepared: KC Revision: 01
Revised: KC Date: 28.10.2003
Method of functioning Approved: GM Page: 2/5

c) Brackets, to hold the top plate during launching

Bolts item 28 and plate item 25 to be


Removed after finishing of launching

d) Fixing bolts for transportation and presetting of top plate

To be cut before
operation of bearing

O:\Marketing\03 HOMEPAGE\mageba-Homepage 2004 (V. II)\6 Unterlagen für Webpage\2 Produkte&Dienstleistungen\3 Brückenlager\2 kartei Lager\03 Downloads\04 Taktschiebelager\02 EN\1
Produkteinformationen\Alte Dokumente\ILM_Bearing_2003_10_Specification.doc
ILM Bearing Prepared: KC Revision: 01
Revised: KC Date: 28.10.2003
Method of functioning Approved: GM Page: 3/5

2) ILM bearing during launching procedure

Stainless steel sheet


Elastomeric pad
(temporarely)
Concrete superstructure

Launching direction
Pad

Fixation during launching


(temporarely)

3) Proposals for fixation after launching procedure


Proposal 1: Connection with dowels

Dowels provisionally placed into the


recess and bolted to top plate
Mortar filled through separate
channels

Bolts

Fixation to be dismount

O:\Marketing\03 HOMEPAGE\mageba-Homepage 2004 (V. II)\6 Unterlagen für Webpage\2 Produkte&Dienstleistungen\3 Brückenlager\2 kartei Lager\03 Downloads\04 Taktschiebelager\02 EN\1
Produkteinformationen\Alte Dokumente\ILM_Bearing_2003_10_Specification.doc
ILM Bearing Prepared: KC Revision: 01
Revised: KC Date: 28.10.2003
Method of functioning Approved: GM Page: 4/5

Proposal 2: Connection to top plate previously mounted with bolts

Top plate premounted in such a way that


it is exactly above the bearing at final position

Top plate previously mounted to


superstructure
Studs Bolts

Gap filled with


epoxy resin

Fixation to be dismount

Proposal 3: Connection to previously mounted top plate by welding

Top plate premounted in such a way that it is


above the bearing at final position

Studs

Gap filled with


Sliding plate epoxy resin
welded to top plate

Fixation to be dismount

O:\Marketing\03 HOMEPAGE\mageba-Homepage 2004 (V. II)\6 Unterlagen für Webpage\2 Produkte&Dienstleistungen\3 Brückenlager\2 kartei Lager\03 Downloads\04 Taktschiebelager\02 EN\1
Produkteinformationen\Alte Dokumente\ILM_Bearing_2003_10_Specification.doc
ILM Bearing Prepared: KC Revision: 01
Revised: KC Date: 28.10.2003
Method of functioning Approved: GM Page: 5/5

Proposal 4: Connection to previously mounted top plate by using transversal fixation


bars

Studs Bolts

Fixation bars

Fixation dismounted
* Distance measured after launching and fixation
bars manufactured accordingly

O:\Marketing\03 HOMEPAGE\mageba-Homepage 2004 (V. II)\6 Unterlagen für Webpage\2 Produkte&Dienstleistungen\3 Brückenlager\2 kartei Lager\03 Downloads\04 Taktschiebelager\02 EN\1
Produkteinformationen\Alte Dokumente\ILM_Bearing_2003_10_Specification.doc

You might also like