Dhamalingam Anbu psk

Civil Rate at Namakkal


Labour contract SQ.FT SQ.FT

Civil work above GL including


centering, paint, Tiles laying(2*2) 320 270 250-300

Below GL, soil excavation and


Compaction, back fill etc upto 150 170 150
7feet depth

Electrical point 100-130 25 cooli


Plumbing 40
Carpentor 200 180

Items Rate / Unit

M-sand 3500-3800 (local) 4000 3200


4500(Karur sand) 3000 erode

P-sand 5000 4500

Metal 2300-2500 2500 0.75 2800 &1.5 ?

ultratec ppc 350-375 400 to 450


Dhamalingam Anbu

Labour+ Materials Sq.ft Sq.ft

ISO TMT, Chettinadu or ramco or ultratech


cement, First class Brick , M20Grade, M-sand,
and P-sand, Metal,External 1:4 plastering,
Internal 1:6 1800 1700

Sal Wood for frame Door and Windows, Floor


Tiles (2*2)

ISO Tata TMT, ramco or ultratech cement, First


class Brick , M20Grade, M-sand, and P-sand, 2000 1800
Metal,External 1:4 plastering, Internal 1:6
Teak Wood, Tiles (2*4) or Granite
PYRAMID STRUCTURAL CONSULTANT
Civil Rate at Namakkal
Labour contract SQ.FT

Civil work above GL including


270
centering, paint, Tiles laying(2*2)

Below GL, soil excavation and


Compaction, back fill etc upto 170
7feet depth
Electrical point 25
Plumbing 40
Carpentor 180
Total 685

Items of work Rate / Unit Location

Karur/Gem
M-sand 3800-4000 Namakkal
Metal 2500 Local quary
ONSULTANT

Labour+ Materials Sq.ft


ISO TMT, Chettinadu or ramco or
ultratech cement, Penna cement
(Plastering),Camber Brick ,
M20Grade, M-sand, and P-sand,
Metal,External 1:4 plastering,
Internal 1:6,PAINT(Two coat white 1800
wash), Electrical, plumbing

Sal Wood for frame Door and


Windows, Floor Tiles (2*2)

Labour+ Materials Sq.ft

ISO Tata TMT, ramco or ultratech


cement, First class Brick , M20Grade,
M-sand, and P-sand, Metal,External
1:4 plastering, Internal
1:6,PAINT(Two coat white wash), 2000
Electrical, plumbing

Teak Wood, Tiles (2*4) or Granite


PYRAMID STRUCTURAL CONSULTANT
Civil wor Rate at Namakkal
Labour contract SQ.FT

Civil work above GL including


280
centering, paint, Tiles laying(2*2)

Below GL, soil excavation and


Compaction, back fill etc upto 175
7feet depth
Electrical point 25
Plumbing 40
Carpentor 180
Total 700

Items of work Rate / Unit Location

Karur/Gem
M-sand 3800-4000 Namakkal
Metal 2500 Local quary
ONSULTANT

Labour+ Materials Sq.ft


ISO TMT, Chettinadu or ramco or
ultratech cement, Penna cement
(Plastering),Camber Brick ,
M20Grade, M-sand, and P-sand,
Metal,External 1:4 plastering, Rate vary
Internal 1:6,PAINT(Two coat white 1800 plus or
wash), Electrical, plumbing minus 50

Sal Wood for frame Door and


Windows, Floor Tiles (2*2)

Labour+ Materials Sq.ft

ISO Tata TMT, ramco or ultratech


cement, First class Brick , M20Grade,
M-sand, and P-sand, Metal,External
1:4 plastering, Internal Rate vary
1:6,PAINT(Two coat white wash), 2000 plus or
Electrical, plumbing minus 50

Teak Wood, Tiles (2*4) or Granite

You might also like