Orange Jordan common engineer Wireless Network-Outdoor Macro

BTSBTS3900A(DC),Concrete floor(With base),Six-port


antennaNewScene
Copyright © Huawei Technologies Co.,Ltd.2014.All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co.,Ltd.

Trademark Notice
is trademarks or registered trademarks of Huawei Technologies Co.,Ltd.

Other trademarks,product,service and company names mentioned are the property of their respective owners.

Version Prepared by Reviewed by Reviewed by Revision Record

V1.0 XXX XXX XXX First issue

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic
of China
Website: http://www.huawei.com
Email: support@huawei.com

Issue Date: 2014-XX-XX Effective Date: 2014-XX-XX


Description
Scenario Description:

Preconditon:

Scenario Schematic Drawing:


Total work
Manpower: Work hours Downtime
Standard Process (Person)
4
(Hours)
8.78 hours(Person* 35.12
(Hours):
Hours):

Remark : Operartions mark in yellow are forbidden in case of thunder storm day

1 2 3 4.1 5 7 8 9 10 11 12 13
Prepare the Install the Install the
Pre-install an Install a radio
Make preparations installation for new transmission fiber transmission GE/FE
Check the materials for Wireless BTSantenna with
Install
six a PGND cable for a BTS3900A cabinet
antenna (including Install a BTS3900A cabinet Install the transmission E1 cable for outdoor cabinet
Install the transmission fiber cable
Prepare
for indoor
and partially
cabinettighten a 7/8" feed
before site visit network deployment cable for outdoor cable for indoor
fixed-length jumpers adjustment)
scenarios cabinet cabinet
0:00 0:00 0:00 0:15 0:15 0:22 0:22 1:07 1:07 1:37 1:52 2:37 2:37 2:57 2:57 2:57 2:57 2:57 2:57 2:57 2:57 2:57 2:57 4:57
0Person*Minute 60Person*Minute 30Person*Minute 30Person*Minute 30Person*Minute 60Person*Minute 80Person*Minute 0Person*Minute 0Person*Minute 0Person*Minute 0Person*Minute 160Person*Minute
Person ABCD Person ABCD Person ABCD Person AB Person A Person ABCD Person ABCD Person ABCD Person ABCD Person ABCD Person ABCD Person ABCD

4.2 6
Install a power input
cable for a
Install AISG to ANT
BTS3900A or
APM30 cabinet
0:22 1:22 1:22 1:52
20Person*Minute 60Person*Minute
Person C Person BC
14.1 15 18 19 20 21 23 25 26
Secure a 7/8" feeder Connect jumper to feeder Prepare labels Check the hardwareConduct
installation
a power-on check (radio
Commission
network)
a single radio site (local)
Conduct a dialing test Rectifier alarm test AC power alarm test

4:57 5:57 5:57 7:27 7:27 7:39 7:39 7:49 7:49 7:59 7:59 8:14 8:14 8:24 8:24 8:26 8:26
40Person*Minute 60Person*Minute 25Person*Minute 20Person*Minute 20Person*Minute 30Person*Minute 20Person*Minute 5Person*Minute 5Person*Minute
Person AB Person AB Person AB Person AB Person AB Person AB Person AB Person AB Person

14.2 16 17 22 24
Install jumpers for a BTS3900A
Install a BTS3900A
cabinet monitoring signal cable
Ground a feeder Setting monitoring parameters
Conduct a VSWR test

4:57 6:42 6:42 6:57 6:57 8:12 8:12 8:17 8:17 8:42
70Person*Minute 15Person*Minute 50Person*Minute 10Person*Minute 50Person*Minute
Person CD Person C Person CD Person CD Person CD
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
1
Make preparations
4 0
before site visit

Procedure
1.1. Before visiting a site, check site preparations based on
Site Preparation Checklist. For example, check whether
materials arrive at the site, whether site access is
permitted, and whether transmission information, design
files, and tools are ready.

Notes
1. If onsite conditions are inconsistent with the conditions
described in the design file, contact Huawei site engineers
for confirmation.
2. If you encounter site access problems, contact Huawei
site engineers.

Tools

1 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
1 2 Prepare the utes/Unit
installation for new
network 4 60
deployment
scenarios
Procedure
1. After you arrive at a site, check and confirm related
information based on Site Preparation Checklist Onsite. For
example, check whether the site information and
installation environment are consistent with the design,
whether the materials are a whole set, and whether the
tools are a whole set, and check the responsibility scope.
2. Move installation auxiliaries and tools to the site, and
Material and tool transportation neatly arrange them by type.
to the site 3. Assign tasks based on actual situations.
4. Wear protective cloths and gloves, and set warning
signs.

Notes
1. If onsite conditions are inconsistent with the conditions
described in the design file, contact Huawei site engineers
Responsibility division
3 4 for confirmation.
2. Gently move the materials and protect the product
components from colliding with the door, wall, or goods
EHS protection shelf.

Tools
Helmet&Safet Paper and
1 Compass 2 y Shoes 3 pencil
Long
4 Seat belts 5 measuring 6
tape
Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
Material packaging check Unpacking inspection
Check the
materials for 4 30
1 2 Wireless BTS

Procedure
1. Check whether the model and number of onsite main
equipment, such as the cabinet, antennas, RRUs, BBU,
and DCDU, are consistent with that specified in the
engineering design file and material checklist (there is a
packing list attached to the equipment packaging), and
whether the appearance of packaging is intact.
2. If the inspection passes, unpack the packaging, and
check whether the number of materials is correct and
whether they are intact. In addition, request the logistics
service provider and implementation team to sign the DN.
3. Provide the NMC with the BBU ESN, which can be
obtained from the left mounting ear of the BBU.
4. Sort the materials and classify them as main equipment
and materials for the antenna system.

Notes
1. Do not unpack the packaging, and report the problem to
the project team in either of the following scenarios:
The model and number of onsite equipment are
3 ESN acquisition 4 Material placement inconsistent with the design file.
The packaging is seriously damaged or soaked.

Tools

1 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
Pre-installed antenna utes/Unit
1 4 Pre-install an
antenna with six
2 30
fixed-length
jumpers
Procedure
1. Install the upper and lower supports, disassemble the
bolt from one end of pole-mounting brackets, making tower
mounting more easily.
2. Use a marker to mark the sector, azimuth, and downtilt
at the back of the antenna.
3.Connect jumpers to the antenna, and do waterproof
(usually by 3 layers waterproof and 3 layers PVC tape;
some case use waterproof box/cover).
4.Based on the serial number of port, attach label /color-
ring to the jumper end,at least attach a white tape to the
end of each jumper then mark the ports for temporary.

2 3

Notes
1. When installing jumpers, protect the connectors from
water and dust.
2. Do not remove the dust-proof cover of the connector to
Connect Waterproof PVC Cable tie be connected to an RRU.
3. Jumper labels and temporary labels must be consistent
with those on antenna connectors.

Tools

1 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
1 utes/Unit

Install AISG to ANT 1 20

Procedure
1.Align the convex of the antenna AISG male connector
with the concave of the AISG female connector correctly,
press the connectors together, and then secure them by
hand properly.
2.While use extenal RCU,Connect AISG cable to RCU port
directly.

Notes
2 1.Install label or color ring on the other end of AISG cable if
needed.
2. Ensure that the female connector of the AISG cable is
properly connected to the RCU male connector. Do not
remove the protective cap from the RCU female connector.

Tools
Phillips
screwdriver
1 Open-end wrench 2 and flat-head 3 Diagonal pliers
screwdriver (6
mm)
4 5 6

Materials
1 RCU 2 SBT

PVC insulation tape and


3 waterproof tape 4 AISG cable

5 Cable tie 6
Duration
Installation
SN Task Description Person*min
Personnel
1 utes/Unit
Install a radio
antenna (including 4 60
adjustment)

Procedure
1.Install a fixed pulley and lifting sling above the position
where an antenna is to be installed, and use the lifting sling
and quickdraw to bind the antenna.
2.Hoist and partially secure the antenna accessories to the
2 specified position on a pole.
3.One people using compass under the tower, guide adjust
the antenna to the specified azimuth by rotating the
antenna leftwards and rightwards and then tighten the
supports bolts.
4.Attach an inclinometer to the rear of the antenna,adjust
the downtilt to the required value.
5.Tighten all the bolts.

Notes
3 5 1. During hoisting, a technician must hold the traction sling
bound to the antenna to protect the antenna from colliding
with the pole.
2. The technician using the compass must stand at a place
without magnetic interference.
3. The antenna must be located within 45° downtilt of a
lightning rod.

Tools
Fixed pulley, lifting
4 1 sling, and quick 2 Compass 3 Seat belts
hook

4 Inclinometer 5 6

Materials
PVC insulation tape and
1 waterproof tape 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
1
Install a BTS3900A
4 80
cabinet

Procedure
1. Determine the position for installing the cabinet,Use a
2.Spring washer
hammer drill to drill holes, and hammer expansion bolts into
1.Bolt
the holes. Then, rotate the expansion bolts clockwise for
3.Flat washer 4.Expansion tube two or three circles and remove the bolts counterclockwise
from the holes. (If attachment plates for U steel or universal
bases are adopted onsite, skip this step.)
2. Determine the position for installing the base. After the
base is pre-installed, use a level to check whether the base
is level. Add spacers to ensure level.then use a torque
wrench to tighten the bolts.
3. Remove the front cover, side baffle plates, and rear
baffle plate from the base.
4. Before an RFC is installed on the base, secure the
mounting block, in the auxiliary package of the RFC, to the
base.
2 5 5. Move the cabinet onto the base and use a torque wrench
to tighten the bolts.

Notes
1. Do not use a hammer drill to drill holes from the base.
2. After disassembling an expansion bolt, ensure that the
top of the expansion tube is level with the concrete floor. If
they are not level with each other, the cabinet cannot be
spacer securely installed on the concrete floor.

3 4 Hammer drill,
vacuum
Tools
cleaner,
Goggle,
Measuring tape (5 Open-end
1 m) 2 Earplug, claw 3 wrench
Phillips
hammer, level
screwdriver
meter, marker
4 Multimeter 5 and flat-head
(marking-off 6
screwdriver
template) (6
mm)
Materials
1 BTS3900A 2 Expansion bolt
2-
3 Spacer 4 Base
M12x30
5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
1 2 Install a PGND
cable for a 1 30
BTS3900A cabinet

Procedure
1. Prepare a cable with a proper length based on the actual
route and install an OT terminal at both ends of the cable.
2. Connect one end of the PGND cable to the ground bar
on the inner side of the cabinet.
3. Route and connect the other end of the PGND cable to
the ground bar outside the cabinet. After the cables outside
the cabinet are covered with corrugated pipes (black anti-
ultraviolet corrugated pipes are recommended), route and
connect the other end of the PGND cable to the outdoor
ground bar. Then, waterproof and seal both ends, and
press and install the terminal.
4. If cabinets are stacked, install an equipotential cable for
the cabinets according to the cable connection shown in
the figure and then ground the cabinets.

Notes
4 1. Grounding principles: An upper cabinet is connected to a
lower cabinet by the equipotential cable. A lower cabinet is
3 connected to an RFC by the equipotential cable. An RFC is
connected to the ground busbar by PGND cables.
2. When installing the PGND cable, tightly press the OT
terminal in the correct direction.

Tools
Measuring tape (5 Cable cutter Hydraulic pliers
1 m) 2 and utility knife 3 and heat gun

4 5 6

Materials
External
ground bar 1 PGND cable for cabinet 2 14-8 OT terminal

3 Heat shrink tube 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
Layout of power input cables utes/Unit
Install a power
on the cabinet side input cable for a
2 60
1 2 BTS3900A or
APM30 cabinet

For three-phase Procedure


power, remove 1. Prepare the power cable based on the designed circuit
110 V dual- the short- route.
live wire circuiting bar. 2. Route the power cable to the EPU from the cable outlet
at the left front part at the bottom of the cabinet. Prepare a
connector for the power cable. Then, open the EPU panel,
remove the protective cover from the power supply
equipment, and connect the power cable to the power port.
If 220 V three-phase power is used, remove the short-
circuiting bar.
3. Install a corrugated pipe (black anti-ultraviolet ray
corrugated pipes are recommended) on the part of a cable
outside the cabinet, and route the cable into the AC power
distribution box. Then, waterproof and seal both ends of the
线缆名称 相位 颜色 线径 corrugated pipe.
4. Trim off the excess of the cable, prepare a terminal for
L1 棕色 6mm2 the cable, and connect the terminal to the AC power
220V 三相
distribution box.
-黑色护 L2 黑色 6mm2 5. After cable routing, pull the drawstrings of the cable bag
套,单股4 at the bottom of the cabinet, install baffle plates on vacant
芯的双层 L3 灰色 6mm2 cable outlets, and tighten the fastening screws on the baffle
plates. Then, use fireproof mud to seal the holes in the
绝缘电缆 Notes
N 蓝色 6mm2 base if necessary.
1. The color of the power cable should comply with local
220V单相 L 棕色 16mm2 regulations.
-单芯双层 2. Keep power off (the circuit breaker is turned off or the
绝缘电缆 N 蓝色 16mm2 fuse is pulled out) while installation power cable, and cable
ends must be coated by insulation tape during cable
routing.

3 4 5 3. A minimum of 30mm distance between the power cable


and others routed on cable tray.

Tools Phillips
Hydraulic screwdriver
Cable cutter and
1 utility knife 2 pliers and heat 3 and flat-head
gun screwdriver (6
5N.m 4 5 6
mm)

Materials
1 Power cable for cabinet 2 14-6 OT terminal

3 Heat shrink tube 4 Cable tie

5 6
Duration
Installation
SN Task Description Person*min
Personnel
2 Install the
utes/Unit
transmission fiber
0 0
cable for outdoor
cabinet
Procedure
1. Determine the transmission equipment and cable routes.
2. Route optical fibers into the corrugated pipe for
protection (Principle: Protect all optical fibers outside a
1 cabinet using corrugated pipes, and keep 100 mm
corrugated pipes inside the cabinet.
3. On the BBU side, connect an optical fiber to the FE1 port
on the board in slot 6, and route it towards the cable tray
along the middle part of the right side of the cabinet. (For
other scenarios, the routing of an optical fiber depends on
transmission board positions. Route optical fibers in the left
half cabinet through the left part of cable trough, and route
the optical fibers in the right half cabinet trough the right
part of the cable trough).
4. Connect optical fibers to corresponding ports based on
3 the designed transmission links.

Notes
1. Coat indoor fiber patch cords with corrugated pipes.
Attach both ends of the fiber patch cords with an insulation
tape to prevent the corrugated pipes from scratching the
fiber patch cords during movement.

Tools

1 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
2 Install the
transmission E1
0 0
cable for outdoor
cabinet
Procedure
1. Determine the transmission equipment and cable route.
1 Then, cut off an E1 cable with a proper length and prepare
connectors for it.
2. Route the E1 cable from the right side of the cabinet and
connect the cable to the transmission port on the main
control board in the BBU. (In other scenarios, the cable is
routed according to the installation position of the
transmission board. Optical fibers installed in the left and
right parts of the cabinet are routed from the left and right
cable troughs, respectively.)
3. Route and secure the E1 cable to the transmission
equipment, and connect the cable to the corresponding port
according to the designed transmission link.

BBU side
Notes
1. When routing transmission cables along a cable tray,
keep more than 30 mm between the transmission cables
and power cables.
2. Before soldering the E1 cable connector, disconnect the
cable from the equipment.

3 Tools

1 2 3

4 5 6
Transmission Materials
side
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
Completed transmission cable 2 Install the
1 connection and transmission transmission
0 0
GE/FE cable for
indoor cabinet
Procedure
1. Determine the transmission equipment and cable routes.
2. Route optical fibers into the corrugated pipe for
protection (Principle: Protect all optical fibers outside a
Numbers 8 and 9 cabinet using corrugated pipes, and keep 100 mm
refer to optical corrugated pipes inside the cabinet.
fibers. 3. On the BBU side, connect an optical fiber to the FE1 port
on the board in slot 6, and route it towards the cable tray
along the middle part of the right side of the cabinet. (For
other scenarios, the routing of an optical fiber depends on
transmission board positions. Route optical fibers in the left
half cabinet through the left part of cable trough, and route
the optical fibers in the right half cabinet trough the right
part of the cable trough).
3 BBU 4. Connect optical fibers to corresponding ports based on
the designed transmission links.

Notes
1. Coat indoor fiber patch cords with corrugated pipes.
Attach both ends of the fiber patch cords with an insulation
tape to prevent the corrugated pipes from scratching the
fiber patch cords during movement.

4 Transmission equipment

Tools

1 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
1 2 utes/Unit
Install the
Transmission cable transmission fiber
0 0
connection cable for indoor
cabinet
Procedure
1. Determine the transmission equipment and cable route.
2. Route the FE cable from the right side of the cabinet and
connect the cable to the transmission port on the main
control board in the BBU. (In other scenarios, the cable is
routed according to the installation position of the
transmission board. Optical fibers installed in the left and
right parts of the cabinet are routed from the left and right
cable troughs, respectively.)
3. Route and secure the FE cable to the transmission
equipment, and connect the cable to the corresponding port
according to the designed transmission link.

BBU side

Notes
1. When routing transmission cables along a cable tray,
keep more than 30 mm between the transmission cables
and power cables.

3
Tools

1 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
1 2 utes/Unit
Prepare and
partially tighten a 4 160
7/8" feeder

Procedure
1.Based on the design documents and site environment,
Determine the route and length.
2. Cut the cables: According to the antenna height and
horizontal cabling length. Cut each feeder according to its
length label, and attach color-ring to both ends of each
UMTS route feeder.
GSM route 3. Prepare feeder connector.
4. Fix the feeder using the lifting sling for lifting;
5.Lifting all the feeder one by one.
6.Fix the feeder by clips.
3 4

Notes
1. You are advised to reserve a slack of about 0.5 m for
each feeder for redundancy.
2. When partially fixing the feeders using feeder clips,
consider the length from the jumper to the antenna, reserve
Use a quick hook to 6 Use a short rope to feeders for horizontal cabling, and use about 9 to 12 feeder
5
partially tighten the partially tighten the clips from top to bottom.
feeder. feeder.

Tools
Long measuring 7/8" feeder
1 tape 2 cutter 3 File and brush

4 5 6

Materials
1 7/8" feeder 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
Secured feeder 2 utes/Unit

1 Secure a 7/8"
2 40
feeder

Procedure
1. Sort the feeders to ensure that no cable crossing exists.
Then, count 5 to 10 feeder clips from the top of the feeders
and then select a point to secure the feeders to the
equipment (the turning point is recommended).
2. Loosen the nut on the top of the feeder clip and install
the feeders to the feeder clip (in most cases, a feeder clip
can fix three feeders). Then, tighten the nut to allow the
3 feeders to be tightly installed.
3. If the feeders are to be connected to outdoor equipment,
route the feeders to the conversion point along the
designed route and secure them to the cable tray.
4. If the feeders are to be connected to indoor equipment,
route the feeders into the feeder window . Prepare a drip
loop outside the feeder window and route the feeders to the
conversion point along the designed route. Then, use
feeder clips to secure the feeders inside the equipment
room to the cable tray and seal the feeder window.

Notes
1. When fixing feeders, sort the feeders from top to bottom
and ensure that the feeders are not crossed.
2. You are advised to secure a feeder at its turning point to
facilitate cooperative installation both on the tower and
under the tower after the cable route is determined.
4 3. The feeder bending radius must be 10 times greater than
the feeder diameter.

Tools
Aerial anti-
dropping
1 Open-end wrench 2 device/Self- 3 Seat belts
locking device
4 5 6

Materials
1 7/8" feeder 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
Install jumpers for
a BTS3900A 2 70
cabinet

Procedure
1. Prepare 1/2" jumpers with a proper length based on the
designed route.
2. Attach color-codings to the jumpers, remove the cable
outlet module from the bottom of the cabinet, and route the
ends of the jumpers with a DIN connector from the bottom
into the cabinet.
3. Connect the jumpers to the corresponding ports on the
RFU and seal the cable outlets at the bottom of the cabinet.
4. Route the jumpers to the feeder conversion points
outside the cabinet, connect the jumper to a feeder, wrap
the connectors with PVC insulation tape and waterproof
tape, and ensure that the connectors are protected with a
layer of PVC insulation tape, three layers of waterproof
tape, and three layers of PVC insulation tape.

Notes
1. Jumpers are connected to the RFUs from bottom to top
and from both sides to the center.
2. The connectors at the jumper conversion point must be
installed from inside to outside and from bottom to top, and
color-codings must be attached in a timely manner.

Tools

1 Torque wrench 2 Diagonal pliers 3

4 5 6

Materials
1 Fixed-length jumper 2 Cable tie

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
1 2
Connect jumper to
1 60
feeder

Procedure
1.Sort feeder by color-coding/label in the antenna
side.Prepare and connect the jumper from antenna to
feeder.
2.Confirm the VSWR and cell service. then do the
waterproof for all the ports and connector with the
waterproof tape and PVC insulation tape .
3.Fix the cable on the tower.

3 Notes

Tools
Cable cutter and
1 utility knife 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
Install a BTS3900A
monitoring signal 1 15
cable

Procedure
1.Install CMUEA monitoring signal
cable(IBBS200D/IBBS200T-IBBS200D/IBBS200T).
2.Install battery cabinet monitoring signal
cable(IBBS200D/IBBS200T-APM30H)
3.Install CMUEA monitoring signal cbale(TMC11H-RFC)
Step 1 Step 2

Notes
Step 3

Tools

1 Diagonal pliers 2 3

4 5 6

Materials
1 Alarm signal cable 2 Cable tie

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
1 utes/Unit

Ground a feeder 2 50

Procedure
1. Determine the point for installing the ground clip on a
feeder based on the ground positions of the feeder and
macro base station.
2. Strip off the sheath at the determined point. During the
operation, ensure that the length of the sheath to be
stripped off is the same as that of a ground clip (excluding
the length of a PGND cable), and the conductor can be
exposed after the sheath is stripped off.
3. Install the ground clip of the feeder onto the external
conductor of the feeder and securely tighten the ground
clip. Then, waterproof the connector of the feeder exposed
outdoors.
4. Securely connect the PGND cable of the ground clip for
the feeder to a nearby ground bar,apply antirust paint on
the ground point and wrap PVC insulation tape around the
bare wires and cable lugs to ensure that they are not
exposed.

Notes
1. When securing the ground clip, ensure that the angle
between the PGND cable and the feeder is not greater than
15°.

3 4
2 Tools
Cable cutter and Open-end
1 utility knife 2 Diagonal pliers 3 wrench

4 5 6

Materials
PVC insulation tape and
1 PGND cable 2 waterproof tape

3 Cable tie 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
1
Prepare labels 1 25

Procedure
1. Choose proper labels (labels are classified into labels of
signal cables and labels of power cables) based on
application scenarios.
2. Fill in/prepare labels following label content rules agreed
by the customer.
3. Attach/secure prepared labels. Fold labels of signal
cables in the way specified in the figure, and bind labels of
power cables using in the delivered cable ties.
4.Ensure that the label orientation and installation location
is easy for information query.
2 Labels of signal cables Labels of power cables

Notes
cable cable
Adhesive side 1. Labels are attached at the position 20 mm away from a
right folding connector by default.
right folding

2. The Label content facilitates maintenance and correctly


partial
maps the cables.
3. Labels are neatly attached.

3 4

Tools
cable

1 Paper and pencil 2 Diagonal pliers 3 Scissor

Three procedures 4 5 6

for attaching Materials


labels of signal 1 Label 2
cables
3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
1 utes/Unit
Check the
hardware 2 20
installation

Procedure
1.Check the hardware installation based on the design
drawings and Hardware Installation Quality Checklist.
2. Check whether the equipment, cabinets, antennas, and
BBU are securely installed at specified positions and
whether their appearances are intact.
3. Check whether the cable routes are correct, whether the
feeder connectors are securely installed, and whether cable
labels are legible.
4. Check whether the downtilt angle and azimuth of the
antennas are correct.
5. Check whether the installation position and route of the
PGND cable are correct and whether the cable connectors
are securely installed.
6. Check whether connectors are reliably and securely
waterproofed.

2 3

Notes
1. The design drawings may be a TSSR for projects outside
China.
2. The project team needs to confirm and sign Hardware
Installation Quality Checklist with the customer and
subcontractors in advance.

4 5 6 Tools

1 Inclinometer 2 Compass 3 Multimeter

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
1 2 Conduct a power-
on check (radio 1 20
network)

Procedure
1. Turn on the circuit breaker for controlling the power
supply to the power distribution cabinet and the PWE
switch of the BBU.
2. Check whether the DC output voltage of the DCDU
ranges from –57.6 V to –38.4 V.
3. Turn on the switches for the LOAD(X) ports on the
DCDU;
4. Check whether the indicators on the BBU, RFUs, or
RRUs work properly.

Notes
1. Set the multimeter to the AC mode before measuring AC
3 4 voltage.
2. If an exception occurs, shut down the power switch,
rectify the fault, and power on the equipment.

Tools

1 Multimeter 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
1 2
Commission a
single radio site 1 30
(local)

Procedure
1. Power on the BBU and RFUs/RRUs.
2.Check whether the indicators on them work properly.
3. Set the IP address of the portable computer and connect
it to the commissioning port on the main control board in
the BBU.
4.Then, log in to the SMT, obtain the site management
authority, and configure base station parameters based on
the site deployment and data list. Check the software
version. Check the base station alarm information and
connection status, and handle the generated alarms. After
the single base station commissioning is complete, notify
the OMC engineer.

4
3 Notes

Tools

1 Multimeter 2 Laptop 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
Setting monitoring
1 parameters
1 10

Procedure
1.Setting the Display Language.
2.Setting the Date and Time.
3.Setting Battery Parameters.
4.Check the communication parameters.Connect the
Laptop to TP SMU and set the dry contact alarm
parameters according to the guide file.Check the working
status of the power system and switch on the DC load for
commissioning. Power off the TP48200B after the load
commissioning is completed and make sure all breakers
2 are OFF.

Notes
1.Set the Bat number and capacity following:
3 1*150Ah for 1 string of 150Ah, 1*300Ah for 2 strings of
150Ah, 1*450Ah for 3 strings of 150Ah, 1*600Ah for 4
strings of 150Ah

Tools

1 Laptop 2 Multimeter 3

4 5 6
4
Materials
1 Board 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
1 2 Conduct a dialing
1 20
test

Procedure
1. Set the test terminals and perform a dialing test for each
sector. Repeat steps 2 through 5 for each sector.
2. Perform mutual dialing tests for the terminals and check
whether the voice connection is normal, whether the voice
quality is good, and whether the call drop rate is low.
Voice Perform mutual video calling tests for the terminals and
check whether the voice connection is normal, whether the
test voice quality is good, whether the video is smooth, and
whether the call drop rate (if it exists) is low.
3. Visit WAP sites and check whether the site access rate
is normal.
4. Perform text message tests.

Notes

Website access test SMS test


4 3

Tools

1 Test terminal 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
1 Conduct a VSWR
2 50
test

Load Procedure
1. Power on the site master, set the frequency, and press
START CAL on a calibrator to perform calibration.
2. Remove the connector of the jumper to be tested, and
connect the jumper to the test port on the site master.
Then, use the ∧, ∨, and ENTER keys on the site master to

25 N·m set the items.


3. Measure the VSWR and record the value. and connect
the DIN terminal of the jumper to the equipment.

Notes
1. The VSWR must be less than 1.5 dB or meet the project
requirements. Otherwise, check the connector preparation
quality or cable connection.
2. After the DIN connector is installed, use a torque wrench
to tighten it with a torque ranging from 25 N•m to 35 N•m.
3

Tools

1 SiteMaster 2 Torque wrench 3

4 5 6
VSWR Value
Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
1 utes/Unit

Rectifier alarm test 2 5

Procedure
1.Insert a plastic stick to stop the rectifier fan and wait
several minutes to check the rectifier fault. View the active
alarm information on the LCD, and view the alarm
information on M2000 to check if the alarm is reported.
2.Remove the stick. View the active alarm information on
LCD, and view the alarm information on M2000 to check if
the alarm disappeared.

2 Notes

Tools

1 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
AC power alarm
2 5
test

Procedure
1.Power on the system normally with battery back up.
2.Switch off the AC input breaker and wait several minutes,
view the active alarm information on the LCD, and view the
alarm information on M2000 to check if the alarm is
reported.
3.Switch on the AC input breaker, view the active alarm
information on LCD, and view the alarm information
on M2000 to check if the alarm disappeared.

Notes

Tools

1 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
utes/Unit
1 2
Door alarm test 2 5

Procedure
1.Open the door of Cabinet or shelter to check the active
alarm information on M2000 with OMC.
2. Close the door of Cabinet or shelter to check if the alarm
is disappeared on M2000 with OMC.

Notes

Tools

1 2 3

4 5 6

Materials
1 2

3 4

5 6
Duration
Installation
SN Task Description Person*min
Personnel
1 Tool sorting 2 Material sorting utes/Unit
Clean the site
4 20
before leaving

Procedure
1. Sort onsite tools.
2. Remove the redundant materials.
3. Clean the equipment room and the area for installing the
antenna system. Then, pack onsite garbage and take it
when leaving the site.
4. Based on requirements in Project PAT Document, take
photos, which will be used for preparing acceptance
documents.
5. Fill in the registration form for equipment room visit.
6. Lock the door of the equipment room, and notify the
3 Cleaning
Photograph
NMC engineer of alarm information checking. If no alarm is
4 generated, leave the site.

Notes
1. Customize Project PAT Document based on project
requirements before using it.
2. Ensure that no sundries are reserved onsite after project
implementation.
3. Before leaving the equipment room, check whether the
Registration form for equipment room live network works properly with the OMC engineer.
5 visit 6 Door locking before leaving the site

Tools
Broom and
1 dustpan 2 Camera 3

4 5 6

Materials
1 2

3 4

5 6
Main Item NO 条目

Prepare the installation Site


for new network 1.1 Clockin
deployment scenarios on site

first
Prepare the installation aid kit
for new network 1.1 and fire
deployment scenarios extingui
sher

Prepare the installation


for new network 1.1 Drinking
water
deployment scenarios

Prepare the installation


for new network 1.1 Tool bag
deployment scenarios
Prepare the installation
for new network 1.1 Site
type
deployment scenarios

Prepare the installation Warning


for new network 1.1
deployment scenarios tape

Prepare the installation EHS


for new network 1.1 kickoff
deployment scenarios meeting

Prepare the installation HW


for new network 1.1 working
deployment scenarios ID
Rigger's
working
Prepare the installation
for new network 1.1 at
height
deployment scenarios certific
ation

Prepare the installation Rigger's


for new network 1.1 PPE
deployment scenarios check

Prepare the installation Rigger's


for new network 1.1 PPE
deployment scenarios check

Pre-
Prepare the installation climbing
for new network 1.1 tower
deployment scenarios EHS
checking
Check
the
antenna
jumpers
Install a radio antenna 1.1 connecti
(including adjustment) on are
installe
d
correctl
y

Check
the
antenna
jumpers
Install a radio antenna connecti
1.1
(including adjustment) on are
installe
d
correctl
y

Check
Install a radio antenna the
(including adjustment) 1.1 antenna
location

Check
Install a radio antenna the
(including adjustment) 1.1 antenna
location
Check
Install a radio antenna 1.1 the
(including adjustment) antenna
location

Measure
the
Install a radio antenna azimuth
1.1
(including adjustment) degrees
of
antenna.

Measure
the
Install a radio antenna
(including adjustment) 1.1 antenna
down
tilt.

Measure
the
Install a radio antenna
(including adjustment) 1.1 antenna
down
tilt.
Check
whether
the
Install a BTS3900A 1.1 cabinet
cabinet base is
installe
d
properly

Check
whether
the
Install a BTS3900A cabinet
1.1
cabinet base is
installe
d
properly

Check
whether
Install a BTS3900A the
cabinet 1.1 cabinet
base is
level

Check
whether
the
insulati
Install a BTS3900A
cabinet 1.1 on
plates
are
insulate
d
Check
whether
the
cabinet
is
Install a BTS3900A 1.1 installe
cabinet d
accordin
g to the
construc
tion
drawing.

Check
whether
the
cabinet
is
Install a BTS3900A installe
1.1
cabinet d
accordin
g to the
construc
tion
drawing.

Check
whether
the
cabinet
is
Install a BTS3900A installe
cabinet 1.1 d
accordin
g to the
construc
tion
drawing.

Check
whether
the
cabinet
is
Install a BTS3900A installe
cabinet 1.1 d
accordin
g to the
construc
tion
drawing.
Check
whether
the
appearan
ce of
Install a BTS3900A 1.1 the
cabinet
cabinet
is in
good
conditio
n

Check
whether
the
appearan
Install a BTS3900A ce of
1.1 the
cabinet cabinet
is in
good
conditio
n

Check
whether
the
appearan
ce of
Install a BTS3900A
cabinet 1.1 the
cabinet
is in
good
conditio
n

Check
whether
the
appearan
ce of
Install a BTS3900A
cabinet 1.1 the
cabinet
is in
good
conditio
n
Check
whether
the
groundin
g cable
Install a PGND cable for 1.1 route
a BTS3900A cabinet
is
installe
d
correctl
y

Check
whether
the
groundin
Install a PGND cable for g cable
1.1 route
a BTS3900A cabinet is
installe
d
correctl
y

Check
whether
the
equipote
ntial
Install a PGND cable for
a BTS3900A cabinet 1.1 cables
are
installe
d
correctl
y

Check
whether
the
equipote
ntial
Install a PGND cable for
a BTS3900A cabinet 1.1 cables
are
installe
d
correctl
y
Check
the
power
cable
Install a power input
cable for a BTS3900A or 1.1 connecti
on is
APM30 cabinet installe
d
properly
.

Check
the
power
Install a power input cable
connecti
cable for a BTS3900A or 1.1
APM30 cabinet on is
installe
d
properly
.

Check
the
Install the transmission transmis
fiber cable for outdoor 1.1 sion
cabinet cable
connecti
on

Check
the
Install the transmission transmis
fiber cable for outdoor 1.1 sion
cabinet cable
connecti
on
Check
the
Install the transmission transmis
fiber cable for outdoor 1.1 sion
cabinet cable
preventi
on

Check
the
Install the transmission transmis
fiber cable for outdoor 1.1 sion
cabinet cable
preventi
on

Check
Install the transmission the
transmis
fiber cable for outdoor 1.1 sion
cabinet
cable
route

Check
Install the transmission the
GE/FE
E1 cable for outdoor 1.1 cable
cabinet
connecti
on
Check
the
Install the transmission
E1 cable for outdoor 1.1 GE/FE
cable
cabinet connecti
on

Check
Install the transmission the
GE/FE
E1 cable for outdoor 1.1
cabinet cable
connecti
on

Check
the
Install the transmission transmis
GE/FE cable for indoor 1.1 sion
cabinet cable
connecti
on

Check
the
Install the transmission transmis
GE/FE cable for indoor 1.1 sion
cabinet cable
connecti
on
Check
the
Install the transmission transmis
GE/FE cable for indoor 1.1 sion
cabinet cable
preventi
on

Check
the
Install the transmission transmis
GE/FE cable for indoor 1.1 sion
cabinet cable
preventi
on

Check
Install the transmission the
transmis
GE/FE cable for indoor 1.1 sion
cabinet
cable
route

Check
Install the transmission the
GE/FE
fiber cable for indoor 1.1 cable
cabinet
connecti
on
Check
the
Install the transmission
fiber cable for indoor 1.1 GE/FE
cable
cabinet connecti
on

Check
Install the transmission the
GE/FE
fiber cable for indoor 1.1
cabinet cable
connecti
on

Check
whether
the
feeders
Secure a 7/8" feeder 1.1 are
installe
d
correctl
y

Check
whether
the
feeders
Secure a 7/8" feeder 1.1 are
installe
d
correctl
y
Check
whether
the
feeders
Secure a 7/8" feeder 1.1 are
installe
d
correctl
y

Check
whether
the
feeders
Secure a 7/8" feeder 1.1 are
installe
d
correctl
y

Check
whether
the
feeders
Secure a 7/8" feeder 1.1 are
installe
d
correctl
y

Check
whether
the
Install jumpers for a
BTS3900A cabinet 1.1 jumpers
route is
correctl
y
Check
whether
the
Install jumpers for a 1.1 jumpers
BTS3900A cabinet
route is
correctl
y

Check
whether
the
color-
Install jumpers for a ring and
1.1 labels
BTS3900A cabinet of
jumpers
are
correctl
y
Check
whether
the
connecto
rs at
the
Install jumpers for a jumper
BTS3900A cabinet 1.1 conversi
on point
is
waterpro
of and
insulate
d

Check
the
jumper
Connect jumper to feeder 1.1 and
feeder
connecti
on
Check
the
jumper
Connect jumper to feeder 1.1 and
feeder
connecti
on

Check
the
jumper
Connect jumper to feeder 1.1 and
feeder
connecti
on

Check
the
Install a BTS3900A monitori
monitoring signal cable 1.1 ng
signal
cable

Check
the
Ground a feeder 1.1 feeder
groundin
g
Check
Conduct a power-on check 1.1 the
(radio network)
voltage

Conduct a power-on check Check


1.1 the BBU
(radio network) Light

Check
Commission a single the
radio site (local) 1.1 software
version

Check
the
Commission a single
radio site (local) 1.1 broads
informat
ion
Check
Commission a single 1.1 the
radio site (local)
almaf

Commission a single Check


1.1 the
radio site (local) ETHPORT

Commission a single Check


radio site (local) 1.1 the OMCH

Commission a single Customiz


radio site (local) 1.1 e MML
Conduct a dialing test 1.1 DIALLING

ANSWEING
Conduct a dialing test 1.1
TEST

Conduct a dialing test 1.1 HANDOVER

Conduct a dialing test 1.1 SMS TEST


Conduct a dialing test 1.1 MMS TEST

PING
Conduct a dialing test 1.1
TEST

Conduct a dialing test 1.1 HTTP

Conduct a dialing test 1.1 FTPSPEED


Conduct a dialing test 1.1 HTTPSPEE
D

THIRDTOO
Conduct a dialing test 1.1
L TEST

Conduct a dialing test 1.1 PIM TEST

Measure
Conduct a VSWR test 1.1 the VSWR
Check
whether
the
Rectifier alarm test 1.1 rectifie
r alarm
is
normal

Check
whether
the AC
AC power alarm test 1.1
power
alarm is
normal

Check
whether
Door alarm test 1.1 the door
alarm is
normal

Check
whether
the
environm
Clean the site before
leaving 1.1 ent of
site is
clean
before
leaving
Clean the site before 1.1 Turn
leaving Signals?

Fire
Clean the site before extingui
1.1
leaving sher in
Vehicle?

Oil/Fuel
Clean the site before
leaving 1.1 /Water
Levels?

Windshie
Clean the site before
leaving 1.1 ld
Wipers ?
Brakes
Clean the site before 1.1 (Pedal
leaving Pressure
)?

Clean the site before Hand


1.1
leaving Brake?

Sides/Ce
ntral
Mirrors
Clean the site before
leaving 1.1 (adjust
before
driving)
?

Site
Clean the site before Clockin
leaving 1.1 or punch
in done?
Both
Headligh
Clean the site before 1.1 ts (High
leaving
& Low
Beam)

Installa
Clean the site before tion
1.1
leaving tools
check
输出项名
1. After you arrive指导 at a site, check and 标准 APP采集 站点类型

confirm related information based on Site
Preparation Checklist Onsite. For example,
check whether the site information and
installation environment are consistent
with the design, whether the materials are
a whole set, and whether the tools are a
whole set, and check the responsibility Site
Clockin N ALL Picture
scope. on site
2. Move installation auxiliaries and tools
to the site, and neatly arrange them by
type.
3. Assign tasks based on actual
situations.
1. After you arrive at a site, check and
4. Wear protective cloths andbased
confirm related information gloves, and
on Site
set warning signs.
Preparation Checklist Onsite. For example,
check whether the site information and Is fire
installation environment are consistent first
with the design, whether the materials are
aid kit
a whole set, and whether the tools are a and
whole set, and check the responsibility
scope. fighting N ALL Picture
system
2. Move installation auxiliaries and tools availabl
to the site, and neatly arrange them by
type. e at
site?
3. Assign tasks based on actual Photo
situations.
1. After you arrive at a site, check and requirem
4. Wear related
confirm protective cloths andbased
information gloves, and
on Site ents:1、
set warning
Preparation Checklist signs.For example,
Onsite. Show the
check whether the site information and full
installation environment are consistent view of
with the design, whether the materials are Does the faciliti
a whole set, and whether the tools are a implemen es;2、Ph
whole set, and check the responsibility tation N ALL oto is
scope. have not
2. Move installation auxiliaries and tools drinking ambiguou
to the site, and neatly arrange them by water? s;
type. Photo
3、The
3. Assign tasks based on actual requirem
bucket
situations.
1. After you arrive at a site, check and isents:
clean
4. Wear protective cloths andbased
confirm related information gloves, and
on Site 1、Show
with
set warning signs.
Preparation Checklist Onsite. For example, the full
plenty
check whether the site information and view of
of water
faciliti
installation environment are consistent es; 2、
with the design, whether the materials are Does the
a whole set, and whether the tools are a team Photo is
not
whole set, and check the responsibility have N ALL ambiguou
scope. tool bag
2. Move installation auxiliaries and tools on s; 3、
The bag
to the site, and neatly arrange them by tower? is neat;
type.
3. Assign tasks based on actual 4、All
tools
situations.
4. Wear protective cloths and gloves, and orderly
placed
set warning signs. in the
tool
bag.
1. After you arrive at a site, check and
confirm related information based on Site Take the
Preparation Checklist Onsite. For example, full Photo
check whether the site information and view of requirem
installation environment are consistent site ents:
with the design, whether the materials are type:
a whole set, and whether the tools are a Tower, 1、Photo
is not
whole set, and check the responsibility monopole N ALL ambiguou
scope. , Plam
2. Move installation auxiliaries and tools tree, s; 2、
Easy to
to the site, and neatly arrange them by Roof top recogniz
type. tower,
3. Assign tasks based on actual OSP, e site
Warning type.
situations.
1. After you arrive at a site, check and CW, DC,
tape
4. Wear protective cloths andbased
confirm related information gloves, and
on Site IBS
Does the Photo
set warning signs.
Preparation Checklist Onsite. For example, implemen requirem
check whether the site information and tation ents:
installation environment are consistent set the 1、Photo
with the design, whether the materials are warning is not
a whole set, and whether the tools are a tape to ambiguou
whole set, and check the responsibility mark the s; 2、
N ALL
scope. dangerou
Take a Easy
2. Move installation auxiliaries and tools sgroup
area, recogniz
to the site, and neatly arrange them by photoand of 100%e
type. prohibit
all warning
check
3. Assign tasks based on actual other
implemen tape in
supplier
situations.
1. After you arrive at a site, check and team
tation the
EHS
4. Wear related
confirm protective cloths andbased
information gloves, and
on Site enter
team photo
equipmen
set warning
Preparation Checklist signs.For example,
Onsite. this
member t and
check whether the site information and toarea?
show tool
installation environment are consistent everybod are
with the design, whether the materials are y' wear qualifie
a whole set, and whether the tools are a qualifie d or
whole set, and check the responsibility d PPE notEHS
scope. equipmen N ALL check
2. Move installation auxiliaries and tools ts(Safet listHW
to the site, and neatly arrange them by y working
type. harness, IDThird
3. Assign tasks based on actual helmet, party
situations.
1. After you arrive at a site, check and glove, certific
Photo
4. Wear protective cloths andbased
confirm related information gloves, and
on Site Shwo
shoes,Vi ationEHS
requirem
set warning signs. every
sibility kick off
Preparation Checklist Onsite. For example, implemen ents:
check whether the site information and Vest, meeting
1、Photo
installation environment are consistent tation
etc.) in group
is not
with the design, whether the materials are team
good photo
ambiguou
member
conditio
a whole set, and whether the tools are a HW s;
whole set, and check the responsibility n? 2、Take
scope. working N ALL a group
ID. No
2. Move installation auxiliaries and tools HW photo of
to the site, and neatly arrange them by all team
type. working member's
ID No
3. Assign tasks based on actual permit frontal
situations. HW
4. Wear protective cloths and gloves, and to HW working
site
set warning signs. ID
height
Safety
Photo :
Helmet
requirem
EN
1. After you arrive at a site, check and ents:
397,EN12
confirm related information based on Site 1、Show
492 ;
Preparation Checklist Onsite. For example, the full
Safety
check whether the site information and Shoes of
view :
installation environment are consistent third
EN20345
with the design, whether the materials are Rigger's party

a whole set, and whether the tools are a working certific
Visibili
whole set, and check the responsibility at N ALL ation;
ty Vest
Working
scope. Is the
height 2、Photo
rigger's :
at
2. Move installation auxiliaries and tools certific is not
EN471
height
to the site, and neatly arrange them by PPE
ation ambiguou
;Safety
(Safety Safety
type. s;
Helmet3、
Gloves ::
3. Assign tasks based on actual harness, Within
EN388
double EN
situations.
1. After you arrive at a site, check and the
;Full
397,EN12
4. Wear protective cloths andbased
gloves, and lanyard, period
confirm related information on Site body;
492
set warning signs.
Preparation Checklist Onsite. For example, helmet, of
glove, Safety
check whether the site information and validity
Harness
Shoes :
shoes,Vi ;
installation environment are consistent :EN
EN20345
with the design, whether the materials are sibility 361,EN
Vest,Ful ;
a whole set, and whether the tools are a l Body 358
Visibili
whole set, and check the responsibility ;Work
ty Vest
Safety
Is the N ALL
scope. Harness, Position

2. Move installation auxiliaries and tools rigger's ing
Work
PPE EN471
to the site, and neatly arrange them by Lanyard
;Safety
Position
(Safety
type. ing :EN :
Gloves
3. Assign tasks based on actual harness, 358
EN388
situations. Lanyard,
double ;Double
1. After you arrive at a site, check and Fall
lanyard, ;Full
4. Wear related
confirm protective cloths andbased
information gloves, and
on Site arrestor Leg
body
set warning
Preparation Checklist signs.For example,
Onsite. helmet, Lanyard
Safety
,Eye
glove, :EN
check whether the site information and Protecti
shoes,Vi Harness
installation environment are consistent 355,EN
:EN
on etc.)
sibility 354,EN
with the design, whether the materials are in good 361,EN
Vest,Ful 362
a whole set, and whether the tools are a conditio
l Body 358
whole set, and check the responsibility ;Self
;Work
n?
Safety N ALL
scope. Retracti
Position
Harness, ng
2. Move installation auxiliaries and tools Work ing
to the site, and neatly arrange them by Arrestor
Lanyard
type. Position :EN353-
:EN
ing 2:2002;F
3. Assign tasks based on actual 358
situations. Lanyard, all
;Double
1. After you arrive at a site, check and Fall Photo
4. Wear protective cloths andbased
confirm related information gloves, and
on Site Pre- arrestor
Leg
requirem
arrestor
climbing for
set warning signs.
Preparation Checklist Onsite. For example, Lanyard
ents:
,Eye
tower steel
:EN
check whether the site information and Protecti 1、Photo
installation environment are consistent EHS rail :EN
355,EN
is not
on etc.)
checking 353-
with the design, whether the materials are 354,EN
ambiguou
in good
: check 1;Telesc
362
a whole set, and whether the tools are a conditio
full s;
whole set, and check the responsibility ope
;Self
2、Rigge :
n?
body N ALL 7X50;
Retracti
scope. r hang
lanyard ng
2. Move installation auxiliaries and tools and on tower
to the site, and neatly arrange them by Arrestor
without
type. double :EN353-
his
lanyard 2:2002;F
3. Assign tasks based on actual is hands
situations. all
catch
4. Wear protective cloths and gloves, and qualifie arrestor
the
d for
set warning signs. tower
steel
rail :EN
353-
1;Telesc
ope :
7X50;
same
measures
color
are
rings.
taken
4、Color at
1.Install a fixed pulley and lifting sling three
rings
above the position where an antenna is to position
are
be installed, and use the lifting sling ssticked
on the
and quickdraw to bind the antenna. outdoor
to the
2.Hoist and partially secure the antenna feeders.
correct
accessories to the specified position on a 5、Ensur
position
pole. e that jumpers
s. connecti
3.One people using compass under the the
Proper N ALL on
tower, guide adjust the antenna to the connecto
groundin
specified azimuth by rotating the antenna rsgof (sector

leftwards and rightwards and then tighten feeders
measures
the supports bolts. and
are
4.Attach an inclinometer to the rear of jumpers
taken at
the antenna,adjust
1.Install the and
a fixed pulley downtilt to sling
lifting the 1, the
are
three
required value.
above the position where an antenna is to antenna
installe
position
5.Tighten
be installed, and all
use the
the bolts.
lifting sling installa
s ond the
and quickdraw to bind the antenna. tion
securely
outdoor
2.Hoist and partially secure the antenna location
and
feeders.
accessories to the specified position on a to meet
correctl
5、Ensur
pole. the
y.
e that jumpers
3.One people using compass under the design
6、Ensur
the lables
requirem
e that N ALL
tower, guide adjust the antenna to the connecto (sector
specified azimuth by rotating the antenna ents.
rsallof )
leftwards and rightwards and then tighten 2, the
outdoor
feeders
the supports bolts. antenna
connecto
and
4.Attach an inclinometer to the rear of bracket
rs are
jumpers
the antenna,adjust
1.Install the and
a fixed pulley downtilt to sling
lifting the 1,and
sealed
the
are
required value. towner
for
antenna
installe
above the position where an antenna is to
5.Tighten
be installed, and all
use the
the bolts.
lifting sling or pole
waterpro
installa
d
connecti
of
tion
securely
and quickdraw to bind the antenna. on
2.Hoist and partially secure the antenna purpose
location
and
accessories to the specified position on a should
and that
to meet
correctl
be
the
y.
pole. reliable
3.One people using compass under the sequence
design
6、Ensur Antenna
tower, guide adjust the antenna to the ,
of
requirem
e that N ALL type
antenna
wrapping
ents.
all
specified azimuth by rotating the antenna
leftwards and rightwards and then tighten 2,and
taps is
the
outdoor
the supports bolts. antenna
correct.
connecto
bracket
7、Water
bracket
rs are
4.Attach an inclinometer to the rear of
the antenna,adjust the and
downtilt to sling
the connecti
proof
and
sealed
1.Install a fixed pulley lifting on
curves
required value.
above the position where an antenna is to towner
for
should
are made
or pole
waterpro
5.Tighten
be installed, and all
use the
the bolts.
lifting sling alsoof be
for
connecti
and quickdraw to bind the antenna. reliable
jumpers
2.Hoist and partially secure the antenna on
purpose
at and
the
should
and that
accessories to the specified position on a solid.
antenna
be
the Antenna
pole. 3. The
side
reliableand Serial
3.One people using compass under the sequence
antenna
outdoor
,
of N ALL Number
tower, guide adjust the antenna to the must
feeders be
antenna
wrapping (sector
specified azimuth by rotating the antenna located
near the
andis )
leftwards and rightwards and then tighten taps
within
feeder
antenna
correct.
the supports bolts. 45°
window.
bracket
7、Water
4.Attach an inclinometer to the rear of downtilt
8、No
connecti
the antenna,adjust the downtilt to the proof
of
ona
unnecess
curves
required value. lightnin
ary
should
5.Tighten all the bolts. are made
g for
rod.
adhesive
also be
tape
reliable
jumpers or
cable
and
at the
tie
solid.
antennais
left
3. The
side on
and
the
antenna
outdoor
feeders
must
feeders be
andthe
located
near
jumpers.
within
feeder
45°
window.
downtilt
8、No
of a
unnecess
fixed to
the
pole.
1.Install a fixed pulley and lifting sling 2、In
above the position where an antenna is to the
be installed, and use the lifting sling forward
and quickdraw to bind the antenna. directio
2.Hoist and partially secure the antenna n of the
accessories to the specified position on a antenna,
pole. the antenna
3.One people using compass under the antenna N ALL high
tower, guide adjust the antenna to the is not (sector
specified azimuth by rotating the antenna obstruct )
leftwards and rightwards and then tighten ed by
the supports bolts. the
4.Attach an inclinometer to the rear of tower
the antenna,adjust
1.Install the and
a fixed pulley downtilt to sling
lifting the body.
required value.
above the position where an antenna is to 3、The
5.Tighten
be installed, and all
use the
the bolts.
lifting sling antenna
and quickdraw to bind the antenna. should
2.Hoist and partially secure the antenna beThein
accessories to the specified position on a errorthe of
the
protecti
pole. antenna Azimuth
3.One people using compass under the on range
azimuth
of the N ALL (sector
tower, guide adjust the antenna to the should )
specified azimuth by rotating the antenna lightnin
leftwards and rightwards and then tighten not
g rodbe
bigger
(within
the supports bolts. than 5°
4.Attach an inclinometer to the rear of the tilt
the antenna,adjust
1.Install the and
a fixed pulley downtilt to sling
lifting the angle of
required
above the position value.
where an antenna is to 45o
5.Tighten
be installed, and all
use the
the bolts.
lifting sling under
and quickdraw to bind the antenna. the
The
lightnin
2.Hoist and partially secure the antenna
accessories to the specified position on a error
g rod). of
the tilt
pole. angle M-Tilt
3.One people using compass under the
tower, guide adjust the antenna to the should N ALL (sector
not be )
specified azimuth by rotating the antenna bigger
leftwards and rightwards and then tighten
than
the supports bolts. 0.5°
4.Attach an inclinometer to the rear of
the antenna,adjust
1.Install the and
a fixed pulley downtilt to sling
lifting the
required value.
above the position where an antenna is to
5.Tighten
be installed, and all
use the
the bolts.
lifting sling
and quickdraw to bind the antenna. The
2.Hoist and partially secure the antenna
accessories to the specified position on a error of
the tilt
pole. angle RET and
3.One people using compass under the E-Tilt
tower, guide adjust the antenna to the should N ALL (sector
not be
specified azimuth by rotating the antenna bigger )
leftwards and rightwards and then tighten
the supports bolts. than
0.5°
4.Attach an inclinometer to the rear of
the antenna,adjust the downtilt to the
required value.
5.Tighten all the bolts.
1. Determine the position for installing between
the cabinet,Use a hammer drill to drill the
holes, and hammer expansion bolts into the cabinet
holes. Then, rotate the expansion bolts and the
clockwise for two or three circles and base is
remove the bolts counterclockwise from the reliable
holes. (If attachment plates for U steel and
or universal bases are adopted onsite, firm.
skip this step.) 2、Cabin
2. Determine the position for installing et base
the base. After the base is pre-installed, and
1、The N ALL Cabinet
use a level to check whether the base is ground
connecti Base
level. Add spacers to ensure level.then fixed
on
use a torque wrench
1. Determine to tighten
the position the bolts.
for installing expansio
between
3. Remove the front cover,
the cabinet,Use a hammer drill to side baffle
drill n bolts
the
holes, and hammer expansion bolts intothe
plates, and rear baffle plate from the installe
cabinet
holes. Then, rotate base.
the expansion bolts dand
firmly
the
4.clockwise
Before anforRFCtwo
is installed on the base,
or three circles and andis
base
secure the mounting block,
remove the bolts counterclockwise in from
the the reliably
reliable
auxiliary
holes. (If package of theplates
attachment RFC, toforthe base.
U steel , and
bolt
5.orMove the cabinet onto the base
universal bases are adopted onsite, and use nut
firm.
a torque wrench to tighten
skip this step.) the bolts. installe
2、Cabin
2. Determine the position for installing detinbase
the 4 bolts
the base. After the base is pre-installed, correct
and of
order. N ALL
use a level to check whether the base is ground cabinet
level. Add spacers to ensure level.then fixed base
use a torque wrench
1. Determine to tighten
the position the bolts.
for installing expansio
3. cabinet,Use
the Remove the front cover,drill
a hammer sideto baffle
drill n bolts
plates,
holes, andand rearexpansion
hammer baffle plate
boltsfrom
intothe
the installe
holes. Then, rotate base.
the expansion bolts d firmly
4.clockwise
Before anforRFCtwo
is installed on the base,
or three circles and and
remove secure the mounting
the bolts block, in from
counterclockwise the the reliably
auxiliary
holes. (If package of theplates
attachment RFC, toforthe base.
U steel , bolt
5.orMove the cabinet Place
nut a
universal bases onto the baseonsite,
are adopted and use
a torque wrench to tighten
skip this step.) the bolts. level
installeon
the top
d in the
2. Determine the position for installing of the Level
the base. After the base is pre-installed, correct measurem
use a level to check whether the base is base
order.to N ALL ent
check
level. Add spacers to ensure level.then whether results
use a torque wrench
1. Determine to tighten
the position the bolts.
for installing the base
3. Remove the front cover,
the cabinet,Use a hammer drill to side baffle
drill 1、Multi
is level
holes, and hammer expansion bolts intothe
plates, and rear baffle plate from the meter to
holes. Then, rotate base.
the expansion bolts measure
4.clockwise
Before anforRFCtwo
is installed on the base,
or three circles and the
secure the mounting block,
remove the bolts counterclockwise in from
the the resistan
auxiliary
holes. (If package of theplates
attachment RFC, toforthe base.
U steel ce
5.orMove the cabinet onto the base
universal bases are adopted onsite, and use between
a torque wrench to tighten
skip this step.) the bolts. the
2. Determine the position for installing leveling multimet
the base. After the base is pre-installed, bolts
use a level to check whether the base is and N ALL er
results
level. Add spacers to ensure level.then expansio
use a torque wrench to tighten the bolts. n bolts.
3. Remove the front cover, side baffle 2、The
plates, and rear baffle plate from the resistan
base. ce is
4. Before an RFC is installed on the base, greater
secure the mounting block, in the than or
auxiliary package of the RFC, to the base. equal to
5. Move the cabinet onto the base and use 5 MΩ.
a torque wrench to tighten the bolts.
1. Determine the position for installing strict
the cabinet,Use a hammer drill to drill accordan
holes, and hammer expansion bolts into the ce with
holes. Then, rotate the expansion bolts the
clockwise for two or three circles and design
remove the bolts counterclockwise from the drawings
holes. (If attachment plates for U steel , to
1、The
or universal bases are adopted onsite, meet
installathe
skip this step.) installa
tion
2. Determine the position for installing tion
position
the base. After the base is pre-installed, space
of the N ALL Cabinet
use a level to check whether the base is requirem
cabinet Location
level. Add spacers to ensure level.then ents.
is in
use a torque wrench
1. Determine to tighten
the position the bolts.
for installing 2、The
strict
3. Remove the front cover,
the cabinet,Use a hammer drill to side baffle
drill cabinet
accordan
holes, and hammer expansion bolts intothe
plates, and rear baffle plate from the cecanwith
holes. Then, rotate base.
the expansion bolts normally
the
4.clockwise
Before anforRFCtwo
is installed on the base,
or three circles and open
designand
secure the mounting block,
remove the bolts counterclockwise in from
the the close
drawings
auxiliary
holes. (If package of theplates
attachment RFC, toforthe base.
U steel the door
, to
1、The
5.orMove the cabinet onto the base
universal bases are adopted onsite, and use 3、A
meet the
installa
a torque wrench to tighten
skip this step.) the bolts. variety
installa
tion
2. Determine the position for installing of
tion
position
the base. After the base is pre-installed, nameplat
space Cabinet
of the N ALL (Close
use a level to check whether the base is e logo
requirem
cabinet
correct, Door)
level. Add spacers to ensure level.then ents.
is in
use a torque wrench
1. Determine to tighten
the position the bolts.
for installing clear,
2、The
strict
3. cabinet,Use
the Remove the front cover,drill
a hammer sideto baffle
drill complete
cabinet
accordan
plates,
holes, andand rearexpansion
hammer baffle plate
boltsfrom
intothe
the cecan.
with
holes. Then, rotate base.
the expansion bolts normally
the
4.clockwise
Before anforRFCtwo
is installed on the base,
or three circles and open
designand
remove secure the mounting
the bolts block, in from
counterclockwise the the close
drawings
auxiliary
holes. (If package of theplates
attachment RFC, toforthe base.
U steel the door
, to
1、The
5.orMove the cabinet
universal bases onto the baseonsite,
are adopted and use meet3、A
installathe
a torque wrench to tighten
skip this step.) the bolts. variety
installa
tion
2. Determine the position for installing of
tion
position
nameplat Cabinet
the base. After the base is pre-installed, space
of the
use a level to check whether the base is e logo
requirem N ALL (Open
cabinet Door)
level. Add spacers to ensure level.then correct,
ents.
is in
use a torque wrench
1. Determine to tighten
the position the bolts.
for installing clear,
2、The
strict
3. Remove the front cover,
the cabinet,Use a hammer drill to side baffle
drill complete
cabinet
accordan
holes, and hammer expansion bolts intothe
plates, and rear baffle plate from the cecan.
with
holes. Then, rotate base.
the expansion bolts normally
the
4.clockwise
Before anforRFCtwo
is installed on the base,
or three circles and open
designand
secure the mounting block,
remove the bolts counterclockwise in from
the the close
drawings
auxiliary
holes. (If package of theplates
attachment RFC, toforthe base.
U steel the, todoor
5.orMove the cabinet onto the base
universal bases are adopted onsite, and use 3、A
meet the
a torque wrench to tighten
skip this step.) the bolts. variety
installa
2. Determine the position for installing of
tion
the base. After the base is pre-installed, nameplat
space Cabinet
use a level to check whether the base is e logo
requirem N ALL signs
level. Add spacers to ensure level.then correct,
ents.
use a torque wrench to tighten the bolts. clear,
2、The
3. Remove the front cover, side baffle complete
cabinet
plates, and rear baffle plate from the .
can
base. normally
4. Before an RFC is installed on the base, open and
secure the mounting block, in the close
auxiliary package of the RFC, to the base. the door
5. Move the cabinet onto the base and use 3、A
a torque wrench to tighten the bolts. variety
of
nameplat
e logo
correct,
clear,
complete
.
1. Determine the position for installing
the cabinet,Use a hammer drill to drill
holes, and hammer expansion bolts into the
holes. Then, rotate the expansion bolts
clockwise for two or three circles and
remove the bolts counterclockwise from the
holes. (If attachment plates for U steel Cabinet
or universal bases are adopted onsite, no
skip this step.) deformat
2. Determine the position for installing ion, no Cabinet
Overall
the base. After the base is pre-installed, depressi N ALL View
use a level to check whether the base is on,
level. Add spacers to ensure level.then paint (front

use a torque wrench
1. Determine to tighten
the position the bolts.
for installing decorati
3. Remove the front cover,
the cabinet,Use a hammer drill to side baffle
drill on
holes, and hammer expansion bolts intothe
plates, and rear baffle plate from the intact
holes. Then, rotate base.
the expansion bolts
4.clockwise
Before anforRFCtwo
is installed on the base,
or three circles and
secure the mounting block,
remove the bolts counterclockwise in from
the the
auxiliary
holes. (If package of theplates
attachment RFC, toforthe base.
U steel Cabinet
5.orMove the cabinet onto the base
universal bases are adopted onsite, and use no
a torque wrench to tighten
skip this step.) the bolts. deformat
2. Determine the position for installing ion, no Cabinet
the base. After the base is pre-installed, depressi Overall
N ALL
use a level to check whether the base is on, View
level. Add spacers to ensure level.then paint (rear)
use a torque wrench
1. Determine to tighten
the position the bolts.
for installing decorati
3. cabinet,Use
the Remove the front cover,drill
a hammer sideto baffle
drill on
plates,
holes, andand rearexpansion
hammer baffle plate
boltsfrom
intothe
the intact
holes. Then, rotate base.
the expansion bolts
4.clockwise
Before anforRFCtwo
is installed on the base,
or three circles and
remove secure the mounting
the bolts block, in from
counterclockwise the the
auxiliary
holes. (If package of theplates
attachment RFC, toforthe base.
U steel Cabinet
5.orMove the cabinet
universal bases onto the baseonsite,
are adopted and use no
a torque wrench to tighten
skip this step.) the bolts. deformat
2. Determine the position for installing ion, no Cabinet
the base. After the base is pre-installed, depressi Overall
use a level to check whether the base is on, N ALL View
level. Add spacers to ensure level.then paint (left)
use a torque wrench
1. Determine to tighten
the position the bolts.
for installing decorati
3. Remove the front cover,
the cabinet,Use a hammer drill to side baffle
drill on
holes, and hammer expansion bolts intothe
plates, and rear baffle plate from the intact
holes. Then, rotate base.
the expansion bolts
4.clockwise
Before anforRFCtwo
is installed on the base,
or three circles and
secure the mounting block,
remove the bolts counterclockwise in from
the the
auxiliary
holes. (If package of theplates
attachment RFC, toforthe base.
U steel Cabinet
5.orMove the cabinet onto the base
universal bases are adopted onsite, and use no
a torque wrench to tighten
skip this step.) the bolts. deformat
Cabinet
2. Determine the position for installing ion, no Overall
the base. After the base is pre-installed, depressi
use a level to check whether the base is on, N ALL View
(right
level. Add spacers to ensure level.then paint )
use a torque wrench to tighten the bolts. decorati
3. Remove the front cover, side baffle on
plates, and rear baffle plate from the intact
base.
4. Before an RFC is installed on the base,
secure the mounting block, in the
auxiliary package of the RFC, to the base.
5. Move the cabinet onto the base and use
a torque wrench to tighten the bolts.
2、OT
terminal
1. Prepare a cable with a proper length s are
based on the actual route and install an securely
1、The
OT terminal at both ends of the cable. mounted
PGND
2. Connect one end of the PGND cable to and in
cables
the ground bar on the inner side of the mustgoodbe
cabinet. contact.
connecte
3. Route and connect the other end of the 3、Equipd
PGND cable to the ground bar outside the otential
reliably
cabinet. After the cables outside the cable
to
cabinet are covered with corrugated pipes length N ALL groundin
groundin g bar
(black anti-ultraviolet corrugated pipes gshould
bar.
are recommended), route and connect the not
2、OT
other end of the PGND cable to the outdoor exceed
terminal
ground bar. Then,
1. Prepare waterproof
a cable and seal
with a proper both
length 2m.(if
s are
ends,
based and press
on the and install
actual route andtheinstall
terminal.
an installa
securely
1、The
4. terminal
OT If cabinets are stacked,
at both install
ends of the an
cable. tion)
mounted
PGND
2.equipotential cable
Connect one end of for
the the
PGNDcabinets
cable to 4、Equip
and
cablesin
according
the groundto bar
the on
cable
the connection
inner side shown
of thein otential
good
must be
the figure and then ground the cabinets.
cabinet. cable
contact.
connecte
3. Route and connect the other end of the diameter
3、Equipd
PGND cable to the ground bar outside the to meet
otential
reliably
cabinet. After the cables outside the the
cable cabinet
to ground
cabinet are covered with corrugated pipes equipmen
length
groundin N ALL
(black anti-ultraviolet corrugated pipes t
should point(O
g bar. T)
are recommended), route and connect the distribu
not
2、OT
other end of the PGND cable to the outdoor tion
exceed
terminal
ground bar. Then,
1. Prepare waterproof
a cable and seal
with a proper both
length requirem
2m.(if
s are
ends, and press and install the terminal.
based on the actual route and install an ents.
installa
securely
1、The
(if
4. terminal
OT If cabinets are stacked,
at both install
ends of the an
cable. tion)
mounted
PGND
equipotential cable for the cabinets
2. Connect one end of the PGND cable to installa
4、Equip
and in
cables
tion)
according
the groundto bar
the on
cable
the connection
inner side shown
of thein otential
good
must be
the figure and then ground
cabinet. the cabinets. cable
contact.
connecte
3. Route and connect the other end of the diameter
3、Equipd
to meet equipote
PGND cable to the ground bar outside the otential
reliably
cabinet. After the cables outside the the
cable ntial
to cables(
cabinet are covered with corrugated pipes equipmen
length
groundin N ALL
t stacked
(black anti-ultraviolet corrugated pipes should
g bar.
are recommended), route and connect the distribu
not cabinets
2、OT )
other end of the PGND cable to the outdoor tion
exceed
terminal
ground bar. Then,
1. Prepare waterproof
a cable and seal
with a proper both
length requirem
2m.(if
s are
ends, and press and install the terminal.
based on the actual route and install an ents.
installa
securely
4. terminal
OT If cabinets are stacked,
at both install
ends of the an
cable. (if
tion)
mounted
equipotential cable for the cabinets
2. Connect one end of the PGND cable to installa
4、Equip
and in
according
the groundto bar
the on
cable
the connection
inner side shown
of thein tion)
otential
good
the figure and then ground
cabinet. the cabinets. cable
contact.
diameter equipote
3. Route and connect the other end of the 3、Equip ntial
PGND cable to the ground bar outside the to meet
otential
cabinet. After the cables outside the the
cable cables(
equipmen cabinets
cabinet are covered with corrugated pipes length N ALL installe
(black anti-ultraviolet corrugated pipes t
should
are recommended), route and connect the distribu
not d side
tion by side
other end of the PGND cable to the outdoor exceed )
ground bar. Then, waterproof and seal both requirem
2m.(if
ends, and press and install the terminal. ents.
installa
4. If cabinets are stacked, install an (if
tion)
equipotential cable for the cabinets installa
4、Equip
according to the cable connection shown in tion)
otential
the figure and then ground the cabinets. cable
diameter
to meet
the
equipmen
t
distribu
tion
requirem
ents.
(if
the cable outlet at the left front part at design
the bottom of the cabinet. Prepare a document
connector for the power cable. Then, open s.
the EPU panel, remove the protective cover 2、OT
1、Power
from the power supply equipment, and terminal
cables
connect the power cable to the power port. mustto be
If 220 V three-phase power is used, remove ensure a
installe
the short-circuiting bar. d solid
in the
3. Install a corrugated pipe (black anti- installa
position
ultraviolet ray corrugated pipes are tion, OT
specifie power
1.recommended)
Prepare the on thecable
power part of a cable
based on the terminal
d in cable
outside the cabinet,
designed and route
circuit route.the cable contact
engineer N ALL terminal
into the AC
2. Route thepower
powerdistribution
cable to thebox. EPU Then,
from surface
ing photo(D
thewaterproof
cable outlet andatseal theboth
leftends
frontofpart
the at without
design CDU)
the bottomcorrugated
of the cabinet. pipe. Prepare a deformat
document
4. Trim for
connector off the
the power
excesscable.
of theThen,
cable,open ion,
s.
theprepare
EPU panel,a terminal
remove forthe the cable, and
protective cover good
2、OT
connect
from thethe terminal
power supplytoequipment,
the AC powerand contact.
terminal
connect the power distribution
cable tobox. the power port. 3、Label
to
If 2205.VAfter cable routing,
three-phase power ispull used,theremove s area
ensure
drawstrings the of the cable bag at
short-circuiting the bottom
bar. correct,
solid
of Install
3. the cabinet, install pipe
a corrugated baffle plates
(black on
anti- legible,
installa
vacant cable ray outlets, and tighten the and OT power
ultraviolet corrugated pipes are tion,
fastening
recommended) screws on on
thethepartbaffle
of a plates.
cable complete
terminal cable
Then, usethefireproof terminal
outside cabinet,mud andtoroute
seal the
the cable
holes .
contact N ALL
photo(p
into theinACthe basedistribution
power if necessary. box. Then, 4、The
surface
protecti ower
1.waterproof
Determine and the seal both endsequipment
transmission of the without cabinet)
corrugated
and cable routes.pipe. ve cover
deformat
4.2.Trim
Routeoffoptical
the excess fibersof the
intocable,
the is
ion,
corrugated pipe for protectioncable,
prepare a terminal for the and
(Principle: installe
good
connect the terminal to
Protect all optical fibers outside athe AC power d
contact.
cabinet using distribution
corrugatedbox. pipes, and keep properly
3、Label
100 mm corrugatedrouting,
5. After cable pull the
pipes inside the s are
drawstrings of thecabinet. cable bag at the bottom correct,
of3.the The
On cabinet,
the BBU side, install baffleanplates
connect optical on legible,
cable transmis
vacant cable outlets, and
fiber to the FE1 port on the board in slot tighten the and sion
fastening
6, and route screws on the baffle
it towards the cableplates.
tray connecti
complete cable
Then, use fireproof mud to seal the holes on meets
.
along the middle part of the right side of the N ALL connecti
in the base if necessary.
the cabinet. (For other scenarios, the 4、The on on
routing of anthe optical fiber depends on design
protecti the BBU
1. Determine transmission equipment requirem
transmission board positions.
and cable routes. Route ve cover side
optical fibers in thefibers
left half ents.
is
2. Route optical into cabinet
the
through
corrugated pipe for protection trough,
the left part of cable (Principle:and installe
route the optical fibers in
Protect all optical fibers outside a the right half d
cabinet
cabinettrough
using the right part
corrugated of the
pipes, and cable
keep properly
trough).
100 mm corrugated pipes inside the
4. Connect opticalcabinet. fibers to corresponding transmis
ports based on the designed The
3. On the BBU side, connecttransmission
an optical cable sion
links.
fiber to the FE1 port on the board in slot cable
6, and route it towards the cable tray connecti connecti
on meets
along the middle part of the right side of the N ALL on on
the cabinet. (For other scenarios, the the
routing of an optical fiber depends on design transmis
requirem
transmission board positions. Route ents. sion
optical fibers in the left half cabinet side
through the left part of cable trough, and
route the optical fibers in the right half
cabinet trough the right part of the cable
trough).
4. Connect optical fibers to corresponding
ports based on the designed transmission
links.
1. Determine the transmission equipment on meets
and cable routes. the
2. Route optical fibers into the design
corrugated pipe for protection (Principle: requirem
Protect all optical fibers outside a ents.
cabinet using corrugated pipes, and keep
100 mm corrugated pipes inside the if use
cabinet. FE fiber
The
optic,mu both
3. On the BBU side, connect an optical cable
fiber to the FE1 port on the board in slot st ends of
connecti
follow
6, and route it towards the cable tray corrugat
along the middle part of the right side of on meets
requirem N ALL ed pipe
the
ent as
the cabinet. (For other scenarios, the design with an
routing of anthe
optical fiber depends on below: insulati
1. Determine transmission equipment requirem
1、Do
transmissionand board
cable positions.
routes. Route on tape
ents.
not
optical fibers
2. Route in thefibers
optical left half
into cabinet
the
through thepipe leftfor
partprotection
of cable (Principle:
trough, and circle
corrugated and
route the optical
Protect fibersfibers
all optical in theoutside
right half
a
cabinet twist
cabinettrough
using the right part
corrugated of the
pipes, and cable
keep cables.
100 mm corrugatedtrough).
pipes inside the
4. Connect opticalcabinet.fibers to corresponding 2、Do
ports notThe bind
3. Onbased
the BBUon the
side, designed
connecttransmission
an optical acable
fiber
fiber to the FE1 port links.
on the board in slot corrugat
optic
connecti
6, and route it towards the cable tray cable
on meets at ed pipe
along the middle part of the right side of the N ALL inside
the cabinet. (For other scenarios, the position the
design
routing
1. of anthe
Determine optical fiber depends
transmission on
equipment where
requirem it cabinet
transmission board positions.
and cable routes. Route bends.
optical fibers in thefibers
left half ents.
2. Route optical into cabinet
the 3、When
through
corrugated pipe for protection trough,
the left part of cable and
(Principle: fiber
route the optical fibers in the
Protect all optical fibers outside a right half optic
cabinet
cabinettrough
using the right part
corrugated of the
pipes, and cable
keep cables
trough).
100 mm corrugated pipes inside the are
4. Connect opticalcabinet.fibers to corresponding routed,
ports based on the designed The
3. On the BBU side, connecttransmission
an optical the
cable transmis
links.
fiber to the FE1 port on the board in slot excess
6, and route it towards the cable tray connecti sion
onofmeets
the cable
along the middle part of the right side of fiber
the N ALL route on
the cabinet. (For other scenarios, the optic
routing of an optical fiber depends on design the
cables
requirem cable
transmission board positions. Route must
ents. be tray
optical fibers in the left half cabinet coiled
1. Determine
through the left thepart
transmission equipment
of cable trough, and around
and cable route. Then, cut
route the optical fibers in the right off an E1 cable
half
with a proper lengthpartand of
prepare special
cabinet trough the right the cable devices,
connectors
trough).for it. such as
2. Connect
4. Route the E1 cable
optical fromtothe
fibers right side
corresponding
of the cabinet and connect the cable to a fiber
ports based on the designed transmission coiler.
the transmission port links.on the main control GE/FE
4、An
board in the BBU. (In other scenarios, the unarmore cable
cable is routed according to the connecti
installation position of the transmission d fiber N ALL on on
optic
board. Optical fibers installed in the cable the BBU
left and right parts of the cabinet are side
routed from the left and right cable must be
bound
troughs, respectively.) using
3. Route and secure the E1 cable to the
transmission equipment, and connect the binding
straps.
cable to the corresponding port according
to the designed transmission link. If a
fiber
optic
patch
cord
needs to
be
secured
in a
cabinet
or a
piece of
cables
where it
must
bends. be
1. Determine the transmission equipment coiled
3、When
around
fiber
and cable route. Then, cut off an E1 cable special
with a proper length and prepare optic
connectors for it. devices,
cables
suchareas
2. Route the E1 cable from the right side a fiber
of the cabinet and connect the cable to routed, GE/FE
the transmission port on the main control coiler.
the cable
board in the BBU. (In other scenarios, the 4、An
excess connecti
unarmore
of the
cable is routed according to the dfiber
fiber N ALL on on
installation position of the transmission the
board. Optical fibers installed in the optic transmis
cable
cables
left and right parts of the cabinet are sion
routed from the left and right cable must be side
troughs, respectively.) bound
coiled
1. Determine the transmission equipment using
around
and cable route. Then,the
3. Route and secure cutE1offcable to cable
an E1 the binding
special
transmission
with a proper length and prepare the
equipment, and connect
cable to theconnectors
corresponding port according straps.
devices,
for it. If aas
to the designed transmission link.side such
2. Route the E1 cable from the right afiber
fiber
of the cabinet and connect the cable to optic
the transmission port on the main control coiler. GE/FE
patch
4、An
board in the BBU. (In other scenarios, the cord
unarmore cable
cable is routed according to the needs to route on
d fiber N ALL
installation position of the transmission be
optic the
board. Optical fibers installed in the secured cable
1.
leftDetermine
and righttheparts
transmission equipment
of the cabinet are cable tray
and cable routes. in abe
must
routed from the left and right cable cabinet
bound
2. Route optical
troughs, fibers into the
respectively.)
corrugated pipe for protection (Principle: or a
using
3. Route and secure the E1 cable to the piece of
Protect all optical fibers outside a binding
transmission equipment, and connect the equipmen
straps.
cabinet using corrugated pipes,
cable to the corresponding port according and keep
100the
mm designed
corrugated pipes inside the t,Ifuse
a
to transmission link. binding
cabinet. fiber
The
straps
optic
3. On the BBU side, connect an optical cable transmis
fiber to the FE1 port on the board in slot topatch
bind sion
6, and route it towards the cable tray connecti
itcord
and cable
on
thenmeets
needs use
to
along the middle part of the right side of the N ALL connecti
the cabinet. (For other scenarios, the cable
be on on
routing of anthe
optical fiber depends on design
ties
secured to the BBU
1. Determine transmission equipment requirem
secure
transmission board positions.
and cable routes. Route in a side
optical fibers in thefibers
left half ents.
the
cabinet
2. Route optical into cabinet
the binding
through
corrugated pipe for protection trough,
the left part of cable and
(Principle: or a
route the optical fibers in the right half straps
piece of
Protect all optical fibers outside a to the
cabinet
cabinettrough
using the right part
corrugated pipes,of the
and cable
keep equipmen
trough). cabinet
t, use
100 mm corrugated pipes inside the or
4. Connect opticalcabinet.fibers to corresponding binding transmis
ports based on the designed equipmen
The
straps
3. On the BBU side, connecttransmission
an optical t. sion
links.
fiber to the FE1 port on the board in slot tocable
bind cable
Ensure
connecti
it and
6, and route it towards the cable tray thatmeets
the connecti
on
then use
along the middle part of the right side of fiber
the N ALL on on
the cabinet. (For other scenarios, the cable the
optic
design
ties to
routing of an optical fiber depends on cables transmis
requirem
secure
transmission board positions. Route can
ents. sion
optical fibers in the left half cabinet the side
flexibly
binding
through the left part of cable trough, and move in
route the optical fibers in the right half straps
cabinet trough the right part of the cable tothethe
cable
cabinet
trough). ties.
4. Connect optical fibers to corresponding or Do
not bend
equipmen
ports based on the designed transmission the
links. t.
fiber
Ensure
optic
that the
cables
fiber
sharply.
optic
cables
can
flexibly
move in
1. Determine the transmission equipment on meets
and cable routes. the
2. Route optical fibers into the design
corrugated pipe for protection (Principle: requirem
Protect all optical fibers outside a ents.
cabinet using corrugated pipes, and keep
100 mm corrugated pipes inside the if use
cabinet. FE fiber
The
optic,mu both
3. On the BBU side, connect an optical cable
fiber to the FE1 port on the board in slot st ends of
connecti
follow
6, and route it towards the cable tray corrugat
along the middle part of the right side of on meets
requirem N ALL ed pipe
the
ent as
the cabinet. (For other scenarios, the design with an
routing of anthe
optical fiber depends on below: insulati
1. Determine transmission equipment requirem
1、Do
transmissionand board
cable positions.
routes. Route on tape
ents.
not
optical fibers
2. Route in thefibers
optical left half
into cabinet
the
through thepipe leftfor
partprotection
of cable (Principle:
trough, and circle
corrugated and
route the optical
Protect fibersfibers
all optical in theoutside
right half
a
cabinet twist
cabinettrough
using the right part
corrugated of the
pipes, and cable
keep cables.
100 mm corrugatedtrough).
pipes inside the
4. Connect opticalcabinet.fibers to corresponding 2、Do
ports notThe bind
3. Onbased
the BBUon the
side,designed
connecttransmission
an optical acable
fiber
fiber to the FE1 port links.
on the board in slot corrugat
optic
connecti
6, and route it towards the cable tray cable
on meets at ed pipe
along the middle part of the right side of the N ALL inside
the cabinet. (For other scenarios, the position the
design
routing
1. of anthe
Determine optical fiber depends
transmission on
equipment where
requirem it cabinet
transmission board positions.
and cable routes. Route bends.
optical fibers in thefibers
left half ents.
2. Route optical into cabinet
the 3、When
through
corrugated pipe for protection trough,
the left part of cable and
(Principle: fiber
route the optical fibers in the
Protect all optical fibers outside a right half optic
cabinet
cabinettrough
using the right part
corrugated of the
pipes, and cable
keep cables
trough).
100 mm corrugated pipes inside the are
4. Connect opticalcabinet.fibers to corresponding routed,
ports based on the designed The
3. On the BBU side, connecttransmission
an optical the
cable transmis
links.
fiber to the FE1 port on the board in slot excess
6, and route it towards the cable tray connecti sion
onofmeets
the cable
along the middle part of the right side of fiber
the N ALL route on
the cabinet. (For other scenarios, the optic
routing of an optical fiber depends on design the
cables
requirem cable
transmission board positions. Route must
ents. be tray
optical fibers in the left half cabinet coiled
through the left part of cable trough, and around
1. Determine
route the opticalthe fibers
transmission
in the equipment
right half
and cable route. special
cabinet trough the right part of the cable devices,
2. Route the FE cable from the right side
trough). such as
4. Connect optical fibers to the
of the cabinet and connect cable to
corresponding a fiber
the transmission port on the main
ports based on the designed transmission control
board in the BBU. (In other scenarios, the coiler. GE/FE
links. 4、An
cable is routed according to the unarmore cable
installation position of the transmission connecti
board. Optical fibers installed in the d fiber N ALL on on
optic
left and right parts of the cabinet are cable the BBU
routed from the left and right cable side
troughs, respectively.) must be
bound
3. Route and secure the FE cable to the using
transmission equipment, and connect the
cable to the corresponding port according binding
straps.
to the designed transmission link.
If a
fiber
optic
patch
cord
needs to
be
secured
in a
cabinet
or a
piece of
cables
where it
must
bends. be
coiled
3、When
around
fiber
1. Determine the transmission equipment special
and cable route. optic
1、Feede
2. Route the FE cable from the right side devices,
cables
rs are
such areas
distribu
of the cabinet and connect the cable to a fiber
the transmission port on the main control routed,
ted GE/FE
board in the BBU. (In other scenarios, the coiler.
the
neatly cable
cable is routed according to the 4、An
excess
without connecti
unarmore
ofanythe
installation position of the transmission dcross.
fiber N ALL on on
board. Optical fibers installed in the fiber the
left and right parts of the cabinet are Nooptic
bare transmis
cable
cables
conducto
routed from the left and right cable sion
troughs, respectively.) rmust
insidebe side
3. Route and secure the FE cable to the bound
coiled
the
using
around
feeders
transmission
1. Determine equipment, and connect
the transmission the
equipment binding
cable to theand corresponding port according special
is
1、Feede
cable route. straps.
to thethe
2. Route designed
FE cable transmission link.side
from the right devices,
exposed.
rsIfare
such
2、Color aas
of the cabinet and connect the cable to distribu
afiber
fiber
rings
ted
the transmission port on the main control optic
board in the BBU. (In other scenarios, the coiler.
are
neatly GE/FE
patch
4、An
sticked
cable is routed according to the without cable
installation position of the transmission tocord
unarmorethe
any route on
needs
dcorrect
fiberto N ALL
board. Optical fibers installed in the cross.
be the
Nooptic
position
bare
left and the
1. Sort right parts to
feeders of ensure
the cabinet are
that no secured cable
routed from exists.
the leftThen,
and right cable
s.
conducto
cable crossing countcable
5 to 10 in abe tray
feeder clipstroughs,
from respectively.)
the top of the feeders rmust
3、Ensur
inside
cabinet
bound
e the
that
3.
andRoute
thenand secure
select the FE
a point tocable
securetothe
the or a
transmission equipment, using
all
feeders
feeders to the equipmentand connect
(the the
turning piece
binding
outdoor of
cable to the pointcorresponding port according
is recommended). is
equipmen
straps.
connecto
exposed.
to the the
2. Loosen designed
nut ontransmission
the top of the link.
feeder t,
rsIfuse
2、Color a
are
clip and install the feeders to the feeder binding
fiber
sealed
clip (in most cases, a feeder clip can fix rings
straps
optic
for
are
three feeders). Then, tighten the nut to to bind
patch
waterpro
sticked
allow the feeders to be tightly installed. itcord
and Waterpro
3. If the feeders are to be connected to toof
then the
use of
needs
purpose
correct to N ALL
outdoor equipment, route the feeders to cable
be curves
and
positionthat
the conversion
1. Sort point to
the feeders along the that
ensure designed
no ties
secured
the to photo
s.
cable crossing exists. Then, count 5tray.
route and secure them to the cable to 10 secure
in
sequence a
4. If the
feeder clipsfeeders
from are
the to
topbeofconnected
the feedersto 3、Ensur
the
cabinet
of
e that
indoor equipment, route the
and then select a point to secure thefeeders into binding
or
the feeder alla
wrapping
feeders towindow . Prepare
the equipment a drip
(the loop
turning straps
piece
taps of
is
outside the feeder window
point is recommended). and route the outdoor
to the
equipmen
correct.
connecto
feeders to the conversion point
2. Loosen the nut on the top of the feeder along the cabinet
t, use
designed route. Then, use feeder clips to 4、Water
rsor are
clip and install the feeders to the feeder binding
proof
secure the feeders inside the
clip (in most cases, a feeder clip can fix equipment sealed
equipmen
straps
curves
for
room
threetofeeders).
the cableThen,tray and sealthe
tighten thenut
feeder
to to t.
bind
window. are
waterpromade
allow the feeders to be tightly installed. Ensure
it and
for
that of the feeder
3. If the feeders are to be connected to then
jumpersuse
outdoor equipment, route the feeders to purpose
fiber N ALL window
and cable
at that
the phtoto
the conversion point along the designed optic
tiestheto
antenna
cables
route and secure them to the cable tray. secure
side and
4. If the feeders are to be connected to sequence
can
the
outdoor
of
indoor equipment, route the feeders into flexibly
binding
feeders
the feeder window . Prepare a drip loop wrapping
move in
straps
near
taps the
is
outside the feeder window and route the to the
the
feeder
correct.
cable
feeders to the conversion point along the cabinet
window.
4、Water
ties.
designed route. Then, use feeder clips to or Do
5、No
proof
secure the feeders inside the equipment not
equipmen
unnecessbend
curves
the
room to the cable tray and seal the feeder t.
ary
window. are made
fiber
Ensure
adhesive
for
thatoptic
tape the
or
jumpers
cables
fiber
cable
at the
sharply.
optic
tie is
antenna
cables
left and
side on
can
the
outdoor
flexibly
feeders
move
near in
andthe
s.
conducto
cable crossing exists. Then, count 5 to 10
feeder clips from the top of the feeders r3、Ensur
inside
and then select a point to secure the e the
that
all
feeders
feeders to the equipment (the turning outdoor
point is recommended). is
1、Feede
2. Loosen the nut on the top of the feeder connecto
exposed.
rs are
rs are
2、Color
distribu
clip and install the feeders to the feeder sealed
clip (in most cases, a feeder clip can fix rings
ted
three feeders). Then, tighten the nut to for
are
neatly
allow the feeders to be tightly installed. waterpro
sticked
without
of
toanythe feeders
3. If the feeders are to be connected to purpose N ALL route
outdoor equipment, route the feeders to correct
cross.
the conversion point to
along the that
designed and that
position
No bare photo
1. Sort the feeders ensure no the
cable crossing exists. Then, count 5tray.
route and secure them to the cable to 10 s.
conducto
sequence
3、Ensur
r inside
4. If the
feeder clipsfeeders
from are
the to
topbeofconnected
the feedersto
indoor equipment, route the feeders into of
e the
that
and then select a point to secure the wrapping
the feeder all
feeders
feeders towindow . Prepare
the equipment a drip
(the loop
turning taps
outside the feeder window
point is recommended). and route the is is
outdoor
feeders to the conversion point along the correct.
connecto
exposed.
2. Loosen the nut on the top of the feeder 4、Water
designed route. Then, use feeder clips to rs are
2、Color
clip and install the feeders to the feeder proof
sealed
secure the feeders inside the
clip (in most cases, a feeder clip can fix equipment rings
curves
for
are
room
threetofeeders).
the cableThen,tray and sealthe
tighten thenut
feeder
to are made
window. waterpro
sticked
allow the feeders to be tightly installed. for
of feeders
3. If the feeders are to be connected to to the
jumpers
purpose
correct N ALL color-
outdoor equipment, route the feeders to at that
and the ring
the conversion point to
along the that
designed position
1. Sort the feeders ensure no antenna
the
s.
routecrossing
cable and secure them Then,
exists. to thecount
cable5tray.
to 10 1、Jumpe
side and
sequence
3、Ensur
rs,
4. If the
feeder clipsfeeders are top
from the to beofconnected
the feedersto outdoor
of
indoor equipment,
and then select aroute
pointtheto feeders into
secure the e that
especial
feeders
wrapping
the feeder
feeders towindow . Prepare
the equipment a drip
(the loop
turning lyall
near the
the
taps
outdoor
Ethernet is
outside thepointfeeder window and route the
is recommended). feeder
correct.
feeders
2. Loosentothethenutconversion
on the top point along
of the the
feeder connecto
cables
window.
4、Water
rsforare
designed
clip route. Then,
and install use feeder
the feeders to theclips to
feeder 5、No
secure proof
sealed
communic
clip (in the
mostfeeders
cases, inside
a feeder theclip
equipment
can fix unnecess
curves
room
threetofeeders).
the cableThen,tray and sealthe
tighten thenut
feeder
to for
ation,
are ary
made
waterpro
allow the feeders window.to be tightly installed. are
adhesive
for
of
securely feeder
3. If the feeders are to be connected to tape
jumpers or
outdoor equipment, route the feeders to purpose
connecte N ALL clamps
cable
at
andd. the
that photo
the conversion point along the designed tie
antenna
theis
route and secure them to the cable tray. 2、The
left on
side
sequence
jumpersand
4.1.IfPrepare
the feeders are to be
1/2" jumpers connected
with a properto the
outdoor
of
indoor are
length based on the designed route.into
equipment, route the feeders feeders
feeders
wrapping
neatly
the feedercolor-codings
2. Attach window . Prepare a drip
to the loop
jumpers, near andthe
tapsandis
outside
remove the cable outlet module from the
the feeder window and route jumpers.
feeder
correct.
feeders tightly
bottom oftothe thecabinet,
conversion
andpoint
routealong the
the ends window.
4、Water
bound.
designed route. Then, use feeder
of the jumpers with a DIN connector from clips to 5、No
proof
The
securethethebottom
feeders inside the
into the cabinet. equipment unnecess
curves
room to3.the cable the
Connect trayjumpers
and seal to the
the feeder cable
are
ties ary
made
are jumpers
window.
corresponding ports on the RFU and seal adhesive
for
evenly route on
the cable outlets at the bottom of the tape
jumpers or
cabinet. spaced N ALL the
andcable
at face
the cabinet
4. Route the jumpers to the feeder tie
antenna
the sameis side
conversion points outside the cabinet, left
side on
and
connect the jumper to a feeder, wrap the directio
the
outdoor
n.
connectors with PVC insulation tape and feeders
3、The
waterproof tape, and ensure that the near andthe
connectors are protected with a layer of connecto
jumpers.
feeder
rs of
PVC insulation tape, three layers of window.
waterproof tape, and three layers of PVC the RF
5、No
cables
insulation tape. unnecess
are
ary
secured
adhesive
to avoid
tape
false or
cable
connecti
tiethat
on is
left
willon
causethe an
feeders
abnormal
and
voltage
2、The
jumpers
1. Prepare 1/2" jumpers with a proper
length based on the designed route. are
neatly
2. Attach color-codings to the jumpers, and
remove the cable outlet module from the
bottom of the cabinet, and route the ends tightly
bound.
of the jumpers with a DIN connector from The
the bottom into the cabinet.
3. Connect the jumpers to the cable
corresponding ports on the RFU and seal ties are jumpers
evenly route on
the cable outlets at the bottom of the 1、Each
spaced N ALL the
cabinet. feeder
4. Route the jumpers to the feeder and face cable
theis same tray
conversion points outside the cabinet, connecte
directio
connect the jumper
1. Prepare to a feeder,
1/2" jumpers with a wrap the
proper d ton.the
connectors with PVC insulation
length based on the designed route.tape and jumper
3、The
2.waterproof tape, and ensure
Attach color-codings to thethat the
jumpers, with
connectothe
connectors are protected with a layer
remove the cable outlet module from the of same
PVC insulation tape, three layers of rs of
bottom of the cabinet, and route the ends color
the RF
waterproof
of the jumperstape,with
andathree layers offrom
DIN connector PVC rings.
The
insulation tape. cables
the bottom into the cabinet. 2、Color
color-
are
3. Connect the jumpers to the rings
ring
securedand
are color-
corresponding ports on the RFU and seal labels
to avoid ring and
the cable outlets at the bottom of the sticked
atfalse
both
to the N ALL labels
cabinet. ends
connecti of of
4. Route the jumpers to the feeder correct
the
on that
conversion points outside the cabinet, position
cables jumpers
will
connect the jumper
1. Prepare to a feeder,
1/2" jumpers with a wrap the
proper causes. an
are
connectors
length basedwithonPVC
theinsulation tape and
designed route. Proper
legible
abnormal
2.waterproof tape, and ensure
Attach color-codings to thethat the
jumpers, groundin
Ensure
voltage
connectors
remove the are protected
cable with a from
outlet module layertheof g
that
standing
PVC insulation
bottom tape, and
of the cabinet, three layers
route the of
ends measures
connecto
wave
waterproof
of tape,with
the jumpers andathree layers offrom
DIN connector PVC rs are
are
ratio
insulation
the bottom tape.
into the cabinet. taken
sealed
(VSWR). at
3. Connect the jumpers to the three
for
corresponding ports on the RFU and seal position
waterpro jumper
the cable outlets at the bottom of the s onofthe conversi
cabinet. outdoor
purpose N ALL on point
4. Route the jumpers to the feeder feeders.
and that photo
conversion points outside the cabinet, 3、Ensur
the
connect the jumper to a feeder, wrap the e that
sequence
connectors with PVC insulation tape and the
of
waterproof tape, and ensure that the connecto
wrapping
connectors are protected with a layer of rs of
taps is
PVC insulation tape, three layers of feeders
correct.
waterproof tape, and three layers of PVC and
1.Sort feederinsulation tape.
by color-coding/label in the jumpers
antenna side.Prepare and connect the are
installe jumpers
jumper from antenna to feeder. d and
2.Confirm the VSWR and cell service. then
do the waterproof for all the ports and securely N ALL antenna
and connecti
connector with the waterproof tape and PVC correctl on
insulation tape .
3.Fix the cable on the tower. y.
4、Ensur
e that
all
outdoor
connecto
rs are
sealed
for
waterpro
of
purpose
and that
the
sequence
of
wrapping
3、Ensur
feeder
position
e that
between
s.
the the
turn
Proper
connecto
of the
groundin
rsgof
feeder
feeders
and
measures the
and
equipmen
are
1.Sort feeder by color-coding/label in the tjumpers
taken room.at
antenna side.Prepare and connect the 2、antenare
three
jumper from antenna to feeder. installe
na is
position jumpers
2.Confirm the VSWR and cell service. then s ond the
installe and
securelyd
outdoor N ALL feeder
do the waterproof for all the ports and
connector with the waterproof tape and PVC and
indoors
feeders. connecti
correctl
3、Ensur: on
insulation tape . y.
3.Fix the cable on the tower. eBoth
that
4、Ensur
endstheof
efeeder
that
aconnecto
allof
have
rs
outdoor
been
feeders
connecto
grounded
and
rs are
through
jumpers
1.Sort feeder by color-coding/label in the sealed
an
antenna side.Prepare and connect the are
for
antenna
installe
jumper from antenna to feeder. waterpro
andd an
2.Confirm the VSWR and cell service. then of
indoor jumpers
securely N ALL
do the waterproof for all the ports and purpose
macro
and route
connector with the waterproof tape and PVC and that
cabinet
insulation tape . correctl
the
instead
y.
3.Fix the cable on the tower. sequence
of being
4、Ensur
of
grounded
e that
wrapping
directly
all
taps. is
outdoor
correct.
connecto
5、Water
outdoor
rs are
The
proof
macro
sealed
1.Install CMUEA monitoring signal cable monitori
cable(IBBS200D/IBBS200T- curves
base
for
IBBS200D/IBBS200T). connecti
are
waterpromade
station ng
on formeets

of signal
2.Install battery cabinet monitoring the N ALL cable
signal cable(IBBS200D/IBBS200T-APM30H) jumpers
1、A
purpose
3.Install CMUEA monitoring signal anddesign
at that
the
cabinet connecti
1. Determinecbale(TMC11H-RFC)
the point for installing the requirem
antenna
is
the on
ground clip on a feeder based on the ents.
side.
installe
sequence
ground positions of the feeder and macro 6、No
d
of
base station. unnecess
outdoors
wrapping
2. Strip off the sheath at the determined tapsary
: is
point. During the operation, ensure that adhesive
On the
correct.
the length of the sheath to be stripped tape or
antenna
5、Water
off is the same as that of a ground clip cableA
side:
proof
(excluding the length of a PGND cable), tie is
feeder
curves feeder
and the conductor can be exposed after the leftbeen
has
are on
made and
sheath is stripped off. the
grounded
for ground
3. Install the ground clip of the feeder jumpers.
through N ALL clip
jumpers
onto the external conductor of the feeder atthethe connecti
and securely tighten the ground clip. antenna on photo
Then, waterproof the connector of the instead
side.
feeder exposed outdoors. of6、Nobeing
4. Securely connect the PGND cable of the grounded
unnecess
ground clip for the feeder to a nearby directly
ary
ground bar,apply antirust paint on the .
adhesive
ground point and wrap PVC insulation tape •On
tapethe or
around the bare wires and cable lugs to side
cable of
ensure that they are not exposed. tieanis
outdoor
left on
macro
the
cabinet:
jumpers.
Before a
feeder
is
routed
into an
1. Turn on the circuit breaker for
controlling the power supply to the power
distribution cabinet and the PWE switch of
the BBU. the Rctifier
Voltage
2. Check whether the DC output voltage of must N ALL rating
the DCDU ranges from –57.6 V to –38.4 V. display
3. Turn on the switches for the LOAD(X) follow photo
standar
ports on the DCDU;
4. Check whether the indicators on the
BBU, RFUs, or RRUs work properly.

1. Turn on the circuit breaker for


controlling the power supply to the power
distribution cabinet and the PWE switch of
the BBU. BBU BBU
2. Check whether the DC output voltage of light
N ALL frontvie
the DCDU ranges from –57.6 V to –38.4 V. should w photo
3. Turn on the switches for the LOAD(X) be green
ports on the DCDU;
4. Check whether the indicators on the
BBU, RFUs, or RRUs work properly.
1. Power on the BBU and RFUs/RRUs.
2.Check whether the indicators on them
work properly.
3. Set the IP address of the portable The
computer and connect it to the software
commissioning port on the main control version
board in the BBU. must
4.Then, log in to the SMT, obtain the site must be software
management authority, and configure base in N ALL version
station parameters based on the site accordan
deployment and data list. Check the ce with
software version. Check the base station the
alarm information and connection status, contract
and handle theongenerated
1. Power alarms.
the BBU and After the
RFUs/RRUs.
single base station commissioning
2.Check whether the indicators on them is
complete, work
notify the OMC
properly. engineer.
3. Set the IP address of the portable The
computer and connect it to the broads
commissioning port on the main control informat
board in the BBU. ion must
4.Then, log in to the SMT, obtain the site must be
management authority, and configure base in N ALL brdinfo
station parameters based on the site accordan
deployment and data list. Check the ce with
software version. Check the base station the
alarm information and connection status, contract
and handle the generated alarms. After the
single base station commissioning is
complete, notify the OMC engineer.
1. Power on the BBU and RFUs/RRUs.
2.Check whether the indicators on them
work properly.
3. Set the IP address of the portable
computer and connect it to the
commissioning port on the main control
board in the BBU. No
4.Then, log in to the SMT, obtain the site engineer N ALL almaf
management authority, and configure base ing
station parameters based on the site almaf
deployment and data list. Check the
software version. Check the base station
alarm information and connection status,
and handle theongenerated
1. Power alarms.
the BBU and After the
RFUs/RRUs.
single base station commissioning
2.Check whether the indicators on them is
complete, work
notify the OMC
properly. engineer.
3. Set the IP address of the portable
computer and connect it to the Check
commissioning port on the main control the
board in the BBU. results
4.Then, log in to the SMT, obtain the site meet the
N ALL ETHPORT
management authority, and configure base configur
station parameters based on the site ation
deployment and data list. Check the requirem
software version. Check the base station ents
alarm information and connection status,
and handle theongenerated
1. Power alarms.
the BBU and After the
RFUs/RRUs.
single base
2.Check station
whether commissioning
the indicators is
on them
complete, work
notify the OMC engineer.
properly.
3. Set the IP address of the portable
computer and connect it to the Check
commissioning port on the main control the
board in the BBU. results
4.Then, log in to the SMT, obtain the site meet the
management authority, and configure base configur N ALL OMCH
station parameters based on the site ation
deployment and data list. Check the requirem
software version. Check the base station ents
alarm information and connection status,
and handle theongenerated
1. Power alarms.
the BBU and After the
RFUs/RRUs.
single base station commissioning
2.Check whether the indicators on them is
complete, work
notify the OMC
properly. engineer.
3. Set the IP address of the portable
computer and connect it to the Check
commissioning port on the main control the
board in the BBU. results
4.Then, log in to the SMT, obtain the site meet the Customiz
management authority, and configure base configur N ALL e MML
station parameters based on the site ation
deployment and data list. Check the requirem
software version. Check the base station ents
alarm information and connection status,
and handle the generated alarms. After the
single base station commissioning is
complete, notify the OMC engineer.
1. Set the test terminals and perform a
dialing test for each sector. Repeat steps
2 through 5 for each sector.
2. Perform mutual dialing tests for the
terminals and check whether the voice
connection is normal, whether the voice The
quality is good, and whether the call drop success
rate is low. Perform mutual video calling rate is N ALL DIALLING
tests for the terminals and check whether not less
the voice connection is normal, whether than
the voice quality is good, whether the 100%
video is smooth, and whether the call drop
rate (if it exists) is low.
3. Visit
1. Set the WAPtest
sites and check
terminals andwhether
performthe
a
site access rate is normal.
dialing test for each sector. Repeat steps
4. Perform 5text
2 through for message tests.
each sector.
2. Perform mutual dialing tests for the
terminals and check whether the voice
connection is normal, whether the voice The
quality is good, and whether the call drop success
rate is low. Perform mutual video calling rate is
N ALL ANSWEING
tests for the terminals and check whether not less
the voice connection is normal, whether than
the voice quality is good, whether the 100%
video is smooth, and whether the call drop
rate (if it exists) is low.
3.
1. Visit
Set theWAPtest
sites and check
terminals andwhether
performthe
a
dialingsite testaccess
for eachrate is normal.
sector. Repeat steps
4. Perform 5text
2 through for message tests.
each sector.
2. Perform mutual dialing tests for the
terminals and check whether the voice
connection is normal, whether the voice The
quality is good, and whether the call drop success
rate is low. Perform mutual video calling rate is
tests for the terminals and check whether not less N ALL HANDOVER
the voice connection is normal, whether than
the voice quality is good, whether the 100%
video is smooth, and whether the call drop
rate (if it exists) is low.
3. Visit
1. Set the WAPtest
sites and check
terminals andwhether
performthe
a
site access rate is normal.
dialing test for each sector. Repeat steps
4. Perform 5text
2 through for message tests.
each sector.
2. Perform mutual dialing tests for the
terminals and check whether the voice
connection is normal, whether the voice The
quality is good, and whether the call drop success
rate is low. Perform mutual video calling rate is
tests for the terminals and check whether not less N ALL SMS
the voice connection is normal, whether than
the voice quality is good, whether the 100%
video is smooth, and whether the call drop
rate (if it exists) is low.
3. Visit WAP sites and check whether the
site access rate is normal.
4. Perform text message tests.
1. Set the test terminals and perform a
dialing test for each sector. Repeat steps
2 through 5 for each sector.
2. Perform mutual dialing tests for the
terminals and check whether the voice
connection is normal, whether the voice The
quality is good, and whether the call drop success
rate is low. Perform mutual video calling rate is N ALL MMS
tests for the terminals and check whether not less
the voice connection is normal, whether than
the voice quality is good, whether the 100%
video is smooth, and whether the call drop
rate (if it exists) is low.
3. Visit
1. Set the WAPtest
sites and check
terminals andwhether
performthe
a
site access rate is normal.
dialing test for each sector. Repeat steps
4. Perform 5text
2 through for message tests.
each sector.
2. Perform mutual dialing tests for the
terminals and check whether the voice
connection is normal, whether the voice The
quality is good, and whether the call drop success
rate is low. Perform mutual video calling rate is
N ALL PING
tests for the terminals and check whether not less
the voice connection is normal, whether than
the voice quality is good, whether the 100%
video is smooth, and whether the call drop
rate (if it exists) is low.
3.
1. Visit
Set theWAPtest
sites and check
terminals andwhether
performthe
a
dialingsite testaccess
for eachrate is normal.
sector. Repeat steps
4. Perform 5text
2 through for message tests.
each sector.
2. Perform mutual dialing tests for the
terminals and check whether the voice
connection is normal, whether the voice The
quality is good, and whether the call drop success
rate is low. Perform mutual video calling rate is
tests for the terminals and check whether not less N ALL HTTP
the voice connection is normal, whether than
the voice quality is good, whether the 100%
video is smooth, and whether the call drop
rate (if it exists) is low.
3. Visit
1. Set the WAPtest
sites and check
terminals andwhether
performthe
a
site access rate is normal.
dialing test for each sector. Repeat steps
4. Perform 5text
2 through for message tests.
each sector.
2. Perform mutual dialing tests for the
terminals and check whether the voice
connection is normal, whether the voice The
quality is good, and whether the call drop success
rate is low. Perform mutual video calling rate is
tests for the terminals and check whether not less N ALL FTPSPEED
the voice connection is normal, whether than
the voice quality is good, whether the 100%
video is smooth, and whether the call drop
rate (if it exists) is low.
3. Visit WAP sites and check whether the
site access rate is normal.
4. Perform text message tests.
1. Set the test terminals and perform a
dialing test for each sector. Repeat steps
2 through 5 for each sector.
2. Perform mutual dialing tests for the
terminals and check whether the voice
connection is normal, whether the voice The
quality is good, and whether the call drop success
rate is low. Perform mutual video calling rate is N ALL HTTPSPEE
tests for the terminals and check whether not less D
the voice connection is normal, whether than
the voice quality is good, whether the 100%
video is smooth, and whether the call drop
rate (if it exists) is low.
3. Visit
1. Set the WAPtest
sites and check
terminals andwhether
performthe
a
site access rate is normal.
dialing test for each sector. Repeat steps
4. Perform 5text
2 through for message tests.
each sector.
2. Perform mutual dialing tests for the
terminals and check whether the voice
connection is normal, whether the voice The
quality is good, and whether the call drop success
rate is low. Perform mutual video calling rate is THIRDTOO
N ALL
tests for the terminals and check whether not less L
the voice connection is normal, whether than
the voice quality is good, whether the 100%
video is smooth, and whether the call drop
rate (if it exists) is low.
3.
1. Visit
Set theWAPtest
sites and check
terminals andwhether
performthe
a
dialingsite testaccess rate
for each is normal.
sector. Repeat steps
4. Perform 5text
2 through for message tests.
each sector.
2. Perform mutual dialing tests for the
terminals and check whether the voice
connection is normal, whether the voice The
quality is good, and whether the call drop success
rate is low. Perform mutual video calling rate is
tests for the terminals and check whether not less N ALL PIM
the voice connection is normal, whether than
the voice quality is good, whether the 100%
video is smooth, and whether the call drop
rate (if it exists) is low.
3. Visit WAP sites and check whether the
site access rate is normal.
4. Perform text message tests.
1. Power on the site master, set the
frequency, and press START CAL on a The VSWR
calibrator to perform calibration. must be
2. Remove the connector of the jumper to less
be tested, and connect the jumper to the than 1.5
VSWR
test port on the site master. Then, use dB or N ALL Value
the ∧, ∨, and ENTER keys on the site meet the
master to set the items. project
3. Measure the VSWR and record the value. requirem
and connect the DIN terminal of the jumper ents
to the equipment.
1.Insert a plastic stick to stop the
rectifier fan and wait several minutes to Rectifie
check the rectifier fault. View the active r alarm
alarm information on the LCD, and view the results
rectifie
alarm information on M2000 to check if the meets N ALL r alarm
alarm is reported. inspecti
2.Remove the stick. View the active alarm on test
information on LCD, and view the alarm operatio
information on M2000 to check if the alarm n
disappeared.

1.Power on the system normally with


battery back up.
2.Switch off the AC input breaker and wait
several minutes, view the active alarm AC power
results
information on the LCD, and view the alarm meets AC power
information on M2000 to check if the alarm
inspecti N ALL alarm
is reported. on test
3.Switch on the AC input breaker, view the
active alarm information on LCD, and view operatio
n
the alarm information
on M2000 to check if the alarm
disappeared.

Door
1.Open the door of Cabinet or shelter to alarm
check the active alarm information on results door
M2000 with OMC. meets
2. Close the door of Cabinet or shelter toinspecti N ALL alarm
Theon site test
check if the alarm is disappeared on M2000
with OMC. room
operatio
should
n
be
clean,
1. Sort onsite tools. obsolete
2. Remove the redundant materials. crates
3. Clean the equipment room and the area and
for installing the antenna system. Then, other
pack onsite garbage and take it when debris
leaving the site. should environm
4. Based on requirements in Project PAT be ent of
Document, take photos, which will be used removed. N ALL site
for preparing acceptance documents. Install before
5. Fill in the registration form for the leaving
equipment room visit. remainin
6. Lock the door of the equipment room, g spare
and notify the NMC engineer of alarm items
information checking. If no alarm is should
generated, leave the site. be neat
and
reasonab
le
stacking
.
1. Sort onsite tools.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated,
2. Remove leave thematerials.
the redundant site.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated, leave the site.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated, leave the site.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking. If no alarm is
generated, leave the site.
1. Sort onsite tools.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated,
2. Remove leave thematerials.
the redundant site.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated, leave the site.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated, leave the site.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking. If no alarm is
generated, leave the site.
1. Sort onsite tools.
2. Remove the redundant materials.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when
leaving the site. Need to Need to
4. Based on requirements in Project PAT answer answer
Document, take photos, which will be used by N ALL by
for preparing acceptance documents. Yes/No/N Yes/No/N
5. Fill in the registration form for A A
equipment room visit.
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking.
1. Sort onsite If no alarm is
tools.
generated,
2. Remove leave thematerials.
the redundant site.
3. Clean the equipment room and the area
for installing the antenna system. Then,
pack onsite garbage and take it when Tool
leaving the site. Installa photo(to
4. Based on requirements in Project PAT tion rque
Document, take photos, which will be used tools N ALL wrench,c
for preparing acceptance documents. are ompass,i
5. Fill in the registration form for ready. nclinome
equipment room visit. ter)
6. Lock the door of the equipment room,
and notify the NMC engineer of alarm
information checking. If no alarm is
generated, leave the site.
图片压缩 距离偏差 是否KCP
类型 精度 最小值 最大值 枚举值 是否必填
比 值 控制

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N

图片 原始图片 200 N N
图片 原始图片 200 N N

图片 原始图片 200 N N
是否是
条目类型 默认值 严重级别 样例图片
EHS

N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Major

N Major
N Critical

N Critical

N Critical

N Major
N Critical

N Critical

N Major

N Major
N Critical

N Critical

N Critical

N Major
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Major

N Major

N Major

N Major
N Major

N Major

N Major

N Major
N Major

N Major

N Major

N Major
N Major

N Major

N Major

N Major
N Major

N Major

N Major

N Major
N Major

N Major

N Major

N Major
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical

N Critical

N Critical
N Critical

N Critical
Installation Quick Guide
9.Install a power input cable for a BTS3900A or APM30
1.Make preparations before site visit:Before visiting a site, check site 5.Install AISG to ANT:Install the upper and lower antenna supports, cabinet:Prepare a power cable according to the cable route and route
preparations, especially site access, design files, and materials, based prepare jumpers, and connect jumpers to the antennas. Then, the cable into the cabinet. Install the corrugated pipe for the cable
on Site Preparation Checklist Before Site Visit. waterproof the cable joints and install nameplates for the cables. outside the cabinet and then route the cable towards the power
supply equipment. Then, prepare a connector for the cable and
connect the connector to the power supply equipment.

10.Install the transmission fiber cable for outdoor cabinet:Route


2.Prepare the installation for new network deployment
scenarios:Check and confirm related information, especially site 6.Install a radio antenna (including adjustment):Assemble the antenna optical fibers into the cabinet and connect them to the BBU. Then,
information, installation environment, and materials required onsite, support, and install the antenna according to designed antenna coat optical fibers outside the cabinet with corrugated pipes, and
based on Site Preparation Checklist Before Installation. azimuth and downtilt. route the optical fibers to the transmission cabinet/ODF for
connection.

7.Install a BTS3900A cabinet:Determine the position for installing the


3.Check the materials for Wireless BTS:Unpack the packaging, check cabinet, and install the base. Then, adjust the base, place the upper 11.Install the transmission E1 cable for outdoor cabinet:Cut off an E1
the materials, and place them based on installation positions and cable according to the cable route and prepare connectors for it. Then,
cabinet onto the top of the lower cabinet, and secure the cabinet to
sequences. the base. route the cable to the transmission equipment.

12.Install the transmission GE/FE cable for indoor cabinet:Route


8.Install a PGND cable for a BTS3900A cabinet:Cut off a PGND cable
4.Pre-install an antenna with six fixed-length jumpers:Install the upper based on the actual cable route, prepare connectors for the cable, and optical fibers into the cabinet and connect them to the BBU. Then,
and lower antenna supports, connect jumpers to the antennas, and coat optical fibers outside the cabinet with corrugated pipes, and
use the cable to connect the cabinet ground point and outdoor ground
waterproof the cable joints. Then, install nameplates for the cables. route the optical fibers to the transmission cabinet/ODF for
bar. connection.
Installation Quick Guide
13.Install the transmission fiber cable for indoor cabinet:Route the 21.Check the hardware installation:Check hardware installation based
network cable through the cabinet and connect it to the BBU. Then, 17.Connect jumper to feeder:
route the other end of the cable to the transmission equipment. on the design drawings and quality requirements.

14.Prepare and partially tighten a 7/8" feeder:Determine the cable 22.Conduct a power-on check (radio network):Verify that equipment
route and length, and cut the cables and prepare connectors. Then, 18.Install a BTS3900A monitoring signal cable: and cables are correctly installed, and power on the equipment based
hoist and partially fix the feeder. on the power-on process.

15.Secure a 7/8" feeder:Sort out the feeder, route it based on the 19.Ground a feeder:Determine the ground point for the feeder. Then, 23.Commission a single radio site (local):After the equipment is
powered on, connect a portable computer to the commissioning port
design route, and then secure it to the cable tray. strip off the cable sheath and install the ground clip for grounding.
and commission the equipment.

16.Install jumpers for a BTS3900A cabinet:Attach color-codings to the


jumpers and route them into the cabinet. Then, install the jumpers 20.Prepare labels:Correctly fill in/prepare labels in compliance with the
and route them to the feeder conversion points. Connect the jumpers 24.Setting monitoring parameters:Setting the Display
specifications and attach/install them to cables and equipment.
to the feeders based on color-codings, and then waterproof the
connectors.
Installation Quick Guide
25.Conduct a dialing test:Set the test terminals and complete voice, 29.Door alarm test:Open the door of Cabinet or shelter to check the
SMS, and website access tests. active alarm information on M2000 with OMC

26.Conduct a VSWR test:Conduct a voltage standing wave ratio 30.Clean the site before leaving:Clean the construction area, take
(VSWR) test using a site master, and check and rectify faults if the photos based on the requirements, and take records.
VSWR value exceeds the specified threshold.

27.Rectifier alarm test:

28.AC power alarm test:


Standard Inspect Procedure(SIP)
Site name: Date: Construction team: Supervisor: Overseer:

Busines Audit Audit score Audit Improvemen


Audit
No. s Owner Quality Standards or Requirements Audit method (100 Resul t
item suggestions
Activity method Tools/IT ) t
Equipment for outdoor installation should be waterproof, anticorrosive management;
Equipme RRU equipment maintenance cavity waterproof rubber plug can not be cut, fail to Visually Audit onsite 8
Subcont Equipm cabling interface to use waterproof glue stick plug;
nt cabinet
1 ractor / ent Visually
installatio Rack (shelf ) reliable fixation, bolt loaded full, according to the insulation plate/flat
Huawei cabinet Audit+Torque onsite 8
n washer/spring washer/nut installation order properly installed;
wrench
Cabinet inlet holes shall be closed disposal; Visually Audit onsite 4
Power line, ground line used whole material, intermediate are not allowed to have
tab;Connection are correct and reliable; RRU equipment power line feeding the Visually Audit onsite 8
power window grounding and waterproofing disposal, have drip loop ;
Subcont
cable Power line, ground wire onsite pressure connection, solder or crimp should be solid
ractor / Visually Audit onsite 4
/ground and reliable, no exposed copper wire;
Huawei
cable Visually Audit(Focus on
Power line/ground line and signal line should be separate lay; central equipment room ) onsite 4

Cable Pole screw of battery line should be sure to tighten Visually Audit onsite 4
2 installatio Subcont
Signal Signal cable should not be damaged, fracture, tab, signal cable plug without
n ractor / Visually Audit onsite 4
cable damage, the plug connection are correct and reliable;
Huawei
Pigtail routed outside the cabinet, must take protective measures, such as adding
protection tube or channel.RRU equipment optical fiber (CPRI) into the window Visually Audit onsite 4
Subcont before have drip loop;
Without use of optical fiber head and single board interface should be protected by
ractor / Cable Visually Audit onsite 4
protective cap (plug);
Huawei
A tail fiber in the cabinet shall be neatly coiled fiber in disc box or wound into a
Visually Audit+Tape onsite 4
diameter greater than 8cm ring fixed;
Feeder, lightning arrester connection is reliable, outdoor do waterproof processing.
Feeder Subcont Visually Audit onsite 8
Should done drip loop before inter room.
3 installatio ractor / Feeder Feeder grounding in accordance with design, and waterproofing. Visually Audit onsite 4
n Huawei
Bending radius is not less than the diameter of the feeder 10 times. Visually Audit+Tape onsite 4
For 1.2m and above the microwave antenna must be installed reinforcing bar
Visually Audit onsite 4
Antenna Subcont correctly.
4 installatio ractor / Antenna Compare design
n Huawei Microwave /radio antenna model, caliber, hanging high file,visually audit or use onsite 8
telescope to check
Tag Subcont
Power line, ground line, signal cable , optical fiber sticking reliable and neat, label
5 specificat ractor / Tag Visually Audit onsite 4
filled out correctly, meet customer requirements.
ion Huawei
Check the site self-inspection
Hardware Subcont Self- After the subcontractor complete the site installation , according to installation reports,whether self-inspection onsite/
6 self- ractor / inspect standards on the site for the 100% self-inspect and output reports. results is the same whit onsite, remot 8
whether self-inspection
inspect Huawei report qualified to cutover network e
Subcont
Finished Site
7 ractor / The rack should be clean, no debris. Visually Audit onsite 4
cleaning cleaning
Huawei
Standard Tools

Antenna
install
ation
tool Fixed pulley,
Open-end wrench lifting sling, and
Compass 1PCS 2PCS quick hook
1SET

Auxilia
ry
Tools
Paper and Broom and
Scissor 1PCS Camera 1PCS
pencil 1PCS dustpan 1PCS

Cable
connect
or
process
ing and
Phillips
connect
ion Long measuring Cable cutter screwdriver and Diagonal pliers Torque wrench Hydraulic 7/8" feeder File and brush
Tools and utility knife flat-head pliers and heat 2SET
tape 1PCS 1PCS 2PCS gun 2SET cutter 1PCS
1SET screwdriver (6
mm) 1SET
Cabinet
s &
Module Hammer drill,
Install vacuum cleaner,
ation Goggle,
Tools Inclinometer Multimeter Measuring tape Earplug, claw
1PCS 1PCS (5 m) 1PCS hammer, level
meter, marker
(marking-off
template) 1SET
Testing
tools

Test terminal
SiteMaster 1PCS Laptop 1PCS
1PCS
Standard Tools

EHS
Tools
Aerial anti-
dropping
Helmet&Safety
Seat belts 2PCS Shoes 4SET device/Self-
locking device
2SET
Main Equipment List

No. Name Picture Function No Name Picture Function

1 Label 2 Base

Wireless Macro
station outdoor
3 Expansion bolt 4 BTS3900A equipment, built
DCDU, BBU, RFU (full
with 6PCS)

5 Spacer PGND
6 cable for cabinet

7 14-8 OT terminal 8 Heat shrink tube

9 14-6 OT terminal 10 Board

11 Cable tie 12
Alarm signal cable
Special Requirement
CraftName Custom Requirement