The document is a data sheet from a concrete technology practical test conducted by students. It records the initial and final setting times of a hydraulic cement paste. The test involves measuring the penetration of a needle into the cement paste at regular time intervals after mixing, with the initial and final set times determined as the times when the penetration reaches specific thresholds. The data sheet includes spaces to record the student name, test number, date, supervisor signature, time periods tested and corresponding needle penetrations.
The document is a data sheet from a concrete technology practical test conducted by students. It records the initial and final setting times of a hydraulic cement paste. The test involves measuring the penetration of a needle into the cement paste at regular time intervals after mixing, with the initial and final set times determined as the times when the penetration reaches specific thresholds. The data sheet includes spaces to record the student name, test number, date, supervisor signature, time periods tested and corresponding needle penetrations.
The document is a data sheet from a concrete technology practical test conducted by students. It records the initial and final setting times of a hydraulic cement paste. The test involves measuring the penetration of a needle into the cement paste at regular time intervals after mixing, with the initial and final set times determined as the times when the penetration reaches specific thresholds. The data sheet includes spaces to record the student name, test number, date, supervisor signature, time periods tested and corresponding needle penetrations.
COLLEGE OF ENGINEERING CIVIL DEPARTMENT CONCRETE TECHNOLOGY - PRACTICAL
DATA SHEET 2-Initial and Final setting times of Hydraulic Cement Paste
Test Name: Student Name:
No. of Test: Group No. : Date of Test: Supervisor Signature:
Time Periods Penetration of
Needle, mm 30 sec. immediately after completion of 30 min. cure First rest period (15 mint. For all types of Portland cement ) 30 seconds Second rest period 30 seconds Third rest period 30 seconds Fourth rest period 30 seconds Fifth rest period 30 seconds • Time to reach 34±1 mm penetration to the nearest minute= __________ • This value is obtained by interpolating between the last two test results obtained, one being above and the other below 34 mm.