You are on page 1of 4

PROFESSIONAL ENGINEERS PROJECT DRAWING M-502, CHILLED WATER LAYOUT

Size
Floor Elevation Forces / Expansion Joint Travel / Operating Deflection Details / Branch / Equipment
Material
204.2 m Top, Deflection= -2.0 mm (-0.1-in) - --------------- Min. distance to first support= 661 mm.
> DN65 Fan Coil
65 200.5 m
64 197.2 m Movement (FCU) above Anchor-1= -1.5 mm (-0.1-in) > DN65 Fan Coil
63 193.9 m Movement (FCU) above Anchor-1= -1.1 mm (0.0-in) > DN65 Fan Coil
62 190.9 m Movement (FCU) above Anchor-1= -0.7 mm (0.0-in) > DN65 Fan Coil

Estimated operating load= 730 N (170 lbs.) > DN65 Fan Coil
61 188.0 m Estimated max (design) load= 750 N (170 lbs.) xxx Anchor 1, Connected per Structural Eng's instructions
Movement (FCU) below Anchor-1= 0.0 mm (0.0-in) > Fan Coil
DN65
60 185.0 m I I Guide - Slide
= xxxxxxxx Part No: FP-5418-32, Copper
~ 183.6 m Estimated design expansion= -12.5 mm (-0.5-in) > DN50 Fan Coil
59 182.1 m Between anchors= 17.7 m (58.1ft) I I Pressure (including pump)= 516 kPag (74 psig)
58 179.1 m Movement (FCU) above Anchor-2= -1.4 mm (-0.1-in) > DN50 Fan Coil
57 176.2 m Movement (FCU) above Anchor-2= -1.1 mm (0.0-in) > DN50 Fan Coil
56 173.2 m Movement (FCU) above Anchor-2= -0.7 mm (0.0-in) > DN50 Fan Coil

Estimated operating load= 530 N (120 lbs.) > DN50 Fan Coil
55 170.3 m Estimated max (design) load= 520 N (120 lbs.) xxx Anchor 2, Connected per Structural Eng's instructions
~ 163.8 m Estimated design offset expansion= -1.0 mm (0.0-in) Offset, Min. riser to support= 179 mm (0.6')
Estimated operating load= 540 N (130 lbs.) > DN50 Fan Coil
54 167.3 m Estimated max (design) load= 590 N (140 lbs.) xxx Anchor 3, Connect per Structural Eng's instructions
53 164.4 m Movement (FCU) below Anchor-3= 0.0 mm (0.0-in) > DN50 Fan Coil
52 161.4 m Movement (FCU) below Anchor-3= 0.4 mm (0.0-in) > DN50 Fan Coil
51 158.5 m Movement (FCU) below Anchor-3= 0.7 mm (0.0-in) > DN50 Fan Coil
Movement (FCU) below Anchor-3= 1.1 mm (0.0-in) > Fan Coil
DN50
50 155.5 m I I Guide - Slide
= xxxxxxxx Part No: FP-5418-32, Copper
~ 154.1 m Estimated design expansion= -16.7 mm (-0.7-in) > DN50 Fan Coil
49 152.6 m Between anchors= 23.6 m (77.4ft) I I Pressure (including pump)= 805 kPag (115 psig)
48 149.6 m Movement (FCU) above Anchor-4= -1.1 mm (0.0-in) > DN40 Fan Coil
47 146.7 m Movement (FCU) above Anchor-4= -0.7 mm (0.0-in) > DN40 Fan Coil

Estimated operating load= 520 N (120 lbs.) > DN40 Fan Coil
46 143.8 m Estimated max (design) load= 520 N (120 lbs.) xxx Anchor 4, Connected per Structural Eng's instructions
45 140.8 m Movement (FCU) below Anchor-4= 0.0 mm (0.0-in) > DN40 Fan Coil
44 137.9 m Movement (FCU) below Anchor-4= 0.4 mm (0.0-in) > DN32 Fan Coil
43 134.9 m Movement (FCU) below Anchor-4= 0.7 mm (0.0-in) > DN32 Fan Coil
Movement (FCU) below Anchor-4= 1.1 mm (0.0-in) > Fan Coil
DN32
42 131.9 m I I Guide - Slide
= xxxxxxxx Part No: FP-5418-20, Copper
~ 130.5 m Estimated design expansion= -16.7 mm (-0.7-in) > DN32 Fan Coil
41 129.0 m Between anchors= 23.6 m (77.4ft) I I Pressure (including pump)= 1037 kPag (148 psig)
40 126.1 m Movement (FCU) above Anchor-5= -1.1 mm (0.0-in) > DN32 Fan Coil
39 123.1 m Movement (FCU) above Anchor-5= -0.7 mm (0.0-in) > DN32 Fan Coil

Estimated operating load= 1,800 N (410 lbs.) > DN32 Fan Coil
38 120.2 m Estimated max (design) load= 1,800 N (410 lbs.) xxx Anchor 5, Connected per Structural Eng's instructions
37 117.0 m Movement (FCU) below Anchor-5= 0.0 mm (0.0-in) > DN32 Fan Coil
117.0 m Bottom, Deflection= 0.4 mm (0.0-in) - --------------- Min. distance to first support= 211 mm.
> DN32 Fan Coil
36 113.3 m Pressure (including pump)= 1191 kPag (170 psig)

Refer to Legend…
Positive loads are down Positive Deflections are up Fiberglass insulation
Negative loads are up Negative Deflections are down Copper Type L, Hard drawn pipe

THIS DOCUMENT IS THE PROPERTY OF LEONINE INTERNATIONAL INC AND NONE. THE DATA HEREIN IS NOT TO BE DISCLOSED IN ANY FORM TO ANYONE WITHOUT THE
WRITTEN PERMISSION OF LEONINE INTERNATIONAL INC OR NONE.
CONTRACTOR:
Contractor Extraordinaire
Leonine International Inc.
Main Street Boulevard 19 Thorne Street, Suite 204
Toronto Cambridge, Ontario N13 1S3
Tel: (905) 123-5678, Fax: (905) 123-4567 Tel: +1 519 267 2198
PROJECT: RISER TITLE:
Downtown
Main Street West FAN COIL CWR- UPPER ZONE- R7
Toronto LEVEL 36 TO LEVEL 65
PROJECT # DATE: RISER CALCULATION No. SHEET REV.
0638 Jan 05, 2021 UZ-CWR3 1 OF 3 2
Using RISERCALC version 1608.85.19.95
PROFESSIONAL ENGINEERS PROJECT DRAWING M-502, CHILLED WATER LOADS
Operating Loads Design Loads Test Loads Staged Loads
Description
[kg] [lbs] [kg] [lbs] [kg] [lbs] [kg] [lbs]
Mass of Water 65 143 65 143 0 0 65
Mass of Pipe 55 121 55 121 55 121 55
Mass of Insulation 12 27 12 27 0 0 0
Mass of Cladding 4 9 4 9 0 0 0
Anchor 1

Mass - Expansion Joint 6 13 6 13 6 13 6


Mass of Guides 0 0 0 0 0 0 0
Expansion Load 0 0 -1 -1 0 0 0
Static Pressure Load 0 0 0 0 0 0 0
TOTAL 74 164 76 168 61 134 61
Mass of Water 35 78 35 78 0 0 35 78
Mass of Pipe 35 77 35 77 35 77 7 15
Mass of Insulation 8 18 8 18 0 0 0 0
Mass of Cladding 3 6 3 6 0 0 0 0
Anchor 2

Mass - Expansion Joint 10 22 10 22 10 22 10 22


Mass of Guides 0 0 0 0 0 0 0 0
Expansion Load -1 -1 -3 -7 0 0 0 0
Static Pressure Load 0 0 0 0 0 0 0 0
TOTAL 53 118 53 116 45 99 17 37
Mass of Water 35 78 35 78 0 0 35 78
Mass of Pipe 35 77 35 77 35 77 35 77
Mass of Insulation 8 18 8 18 0 0 0 0
Mass of Cladding 3 6 3 6 0 0 0 0
Anchor 3

Mass - Expansion Joint 10 22 10 22 10 22 10 22


Mass of Guides 0 0 0 0 0 0 0 0
Expansion Load 1 2 4 9 0 0 0 0
Static Pressure Load 0 0 0 0 0 0 0 0
TOTAL 55 121 60 132 45 99 45 99
Mass of Water 29 64 29 64 0 0 29 64
Mass of Pipe 34 75 34 75 34 75 19 42
Mass of Insulation 11 24 11 24 0 0 0 0
Mass of Cladding 4 9 4 9 0 0 0 0
Anchor 4

Mass - Expansion Joint 6 14 6 14 6 14 6 14


Mass of Guides 0 0 0 0 0 0 0 0
Expansion Load 0 -1 -3 -6 0 0 0 0
Static Pressure Load 0 0 0 0 0 0 0 0
TOTAL 53 116 52 115 40 89 25 56
NOTES
Positive loads are DOWN, and negative loads are UP.
The structural Engineer shall verify the building capacity to support the anchor loads.
Estimated anchor loads include no factors, and are based on an ASME B31.9 pneumatic pressure test of 1,035 kPag (150 psig)
The loads may vary depending on the pneumatic test procedure and test pressure used by the Contractor.
The Contractor is responsible to ensure that a safe pneumatic pressure test procedure is used.
Seismic and dynamic loads are not included. Loads caused by water hammer are not included.
The pipe weights include a safety margin of 5.0 %.
THIS DOCUMENT IS THE PROPERTY OF LEONINE INTERNATIONAL INC AND NONE. THE DATA HEREIN IS NOT TO BE DISCLOSED IN ANY FORM TO ANYONE
WITHOUT THE WRITTEN PERMISSION OF LEONINE INTERNATIONAL INC OR NONE.
CONTRACTOR:
Contractor Extraordinaire
Leonine International Inc
Main Street Boulevard 19 Thorne Street, Suite 204
Toronto Cambridge, Ontario N13 1S3
Tel: (905) 123-5678, Fax: (905) 123-4567 Tel: +1 519 267 2198
PROJECT: DRAWING TITLE:
Downtown
Main Street West FAN COIL CWR- UPPER ZONE- R7
Toronto
LEVEL 36 TO LEVEL 65
PROJECT # DATE: RISER CALCULATION No. SHEET REV.
0638 Jan 05, 2021 UZ-CWR3 2 OF 4 2
Using RISERCALC version 1608.85.19.95
PROFESSIONAL ENGINEERS PROJECT DRAWING M-502, CHILLED WATER LOADS
Operating Loads Design Loads Test Loads Staged Loads
Description
[kg] [lbs] [kg] [lbs] [kg] [lbs] [kg] [lbs]
Mass of Water 15 33 15 33 0 0 15 33
Mass of Pipe 16 35 16 35 16 35 16 35
Mass of Insulation 6 14 6 14 0 0 0 0
Mass of Cladding 2 5 2 5 0 0 0 0
Anchor 5

Mass - Expansion Joint 0 1 0 1 0 1 0 1


Mass of Guides 0 0 0 0 0 0 0 0
Expansion Load 0 -1 -2 -5 0 0 0 0
Static Pressure Load 0 0 0 0 0 0 0 0
TOTAL 183 405 182 402 17 36 17 36
Mass of Water
Mass of Pipe
Mass of Insulation
Mass of Cladding
Mass of Joint
Mass of Guides
Expansion Load
Static Pressure Load
TOTAL
Mass of Water
Mass of Pipe
Mass of Insulation
Mass of Cladding
Mass of Joint
Mass of Guides
Expansion Load
Static Pressure Load
TOTAL
Mass of Water
Mass of Pipe
Mass of Insulation
Mass of Cladding
Mass of Joint
Mass of Guides
Expansion Load
Static Pressure Load
TOTAL
NOTES
Positive loads are DOWN, and negative loads are UP.
The structural Engineer shall verify the building capacity to support the anchor loads.
Estimated anchor loads include no factors, and are based on an ASME B31.9 pneumatic pressure test of 1,035 kPag (150 psig)
The loads may vary depending on the pneumatic test procedure and test pressure used by the Contractor.
The Contractor is responsible to ensure that a safe pneumatic pressure test procedure is used.
Seismic and dynamic loads are not included. Loads caused by water hammer are not included.
The pipe weights include a safety margin of 5.0 %.
THIS DOCUMENT IS THE PROPERTY OF LEONINE INTERNATIONAL INC AND NONE. THE DATA HEREIN IS NOT TO BE DISCLOSED IN ANY FORM TO ANYONE
WITHOUT THE WRITTEN PERMISSION OF LEONINE INTERNATIONAL INC OR NONE.
CONTRACTOR:
Contractor Extraordinaire
Leonine International Inc.
Main Street Boulevard 19 Thorne Street, Suite 204
Toronto Cambridge, Ontario N13 1S3
Tel: (905) 123-5678, Fax: (905) 123-4567 Tel: +1 519 267 2198
PROJECT: DRAWING TITLE:
Downtown
Main Street West FAN COIL CWR- UPPER ZONE- R7
Toronto LEVEL 36 TO LEVEL 65
PROJECT # DATE: RISER CALCULATION No. SHEET REV.
0638 Jan 05, 2021 UZ-CWR3 3 OF 4 2
Using RISERCALC version 1608.85.19.95
PROFESSIONAL ENGINEERS PROJECT DRAWING M-502, CHILLED WATER DEFLECTIONS
Deflection Results Operating Design Vertical Rise
Top (Floor 65) to Anchor 1 (Floor 61)-
-1.98 mm -0.078 in -11.45 mm -0.451 in 16.2 m 53.15 ft
TOTAL
Anchor 1 (Floor 61) to Anchor 2 (Floor
-2.16 mm -0.085 in -12.51 mm -0.493 in 17.7 m 58.07 ft
55)- TOTAL
Anchor 2 (Floor 55) to Anchor 3 (Floor
-0.36 mm -0.014 in -2.09 mm -0.082 in 3.0 m 9.68 ft
54)- TOTAL
Anchor 3 (Floor 54) to Anchor 4 (Floor
-2.88 mm -0.114 in -16.68 mm -0.657 in 23.6 m 77.43 ft
46)- TOTAL
Anchor 4 (Floor 46) to Anchor 5 (Floor
-2.88 mm -0.114 in -16.68 mm -0.657 in 23.6 m 77.43 ft
38)- TOTAL
Anchor 5 (Floor 38) to Bottom (Floor
-0.38 mm -0.015 in -2.23 mm -0.088 in 3.2 m 10.33 ft
36)- TOTAL

Temperature Differential 7.222 °C 13.0 °F 33.334 °C 60.0 °F


Expansion Rate - Copper Type L, Hard
-0.122 mm/m -0.15 in/100-ft -0.707 mm/m -0.85 in/100-ft
drawn

NOTES
Differential Deflection: minus values indicate contraction (cold) movements and positive values represent expansion (hot) movements.
Calculated pipe contraction for sizing the expansion joint is based on 37.8 to 4.4 °C (100.0 to 40.0 °F) plus 25.0 % safety factor.
Calculated operating pipe contraction is based on 21.1 to 13.9 °C (70.0 to 57.0 °F)
The calculated deflections do not include building creep and shrinkage.
Branches to be located so that the insulation clears the underneath of the slab sufficiently to allow for the movement of the pipe.
THIS DOCUMENT IS THE PROPERTY OF LEONINE INTERNATIONAL INC AND NONE. THE DATA HEREIN IS NOT TO BE DISCLOSED IN ANY FORM TO
ANYONE WITHOUT THE WRITTEN PERMISSION OF LEONINE INTERNATIONAL INC OR NONE.
CONTRACTOR:
Contractor Extraordinaire
Leonine International Inc.
Main Street Boulevard 19 Thorne Street, Suite 204
Toronto Cambridge, Ontario N13 1S3
Tel: (905) 123-5678, Fax: (905) 123-4567 Tel: +1 519 267 2198
PROJECT: DRAWING TITLE:
Downtown
Main Street West FAN COIL CWR- UPPER ZONE- R7
Toronto LEVEL 36 TO LEVEL 65
PROJECT # DATE: RISER CALCULATION No. SHEET REV.

0638 Jan 05, 2021 UZ-CWR3 4 OF 4 2


Using RISERCALC version 1608.85.19.95