PROJECT DRAWING M-605, HOT WATER LAYOUT

Floor Elevation Loads / Expansion Joint Travel / Operating Deflection Size Details / Branch / Equipment
84.5 m Top, Deflection= 12.8 mm (0.5-in) - --------------- Min. distance to first support= 1204 mm.
> DN32 Fan Coil
26 80.8 m
25 77.6 m Movement (FCU) above Anchor-1= 9.2 mm (0.4-in) > DN32 Fan Coil
24 74.3 m Movement (FCU) above Anchor-1= 6.2 mm (0.2-in) > DN32 Fan Coil

Estimated operating load= 150 N (40 lbs.) > DN32 Fan Coil
23 71.1 m Estimated max (staged) load= 200 N (50 lbs.) xxx Anchor 1, Connected per Structural Eng's instructions
Movement (FCU) below Anchor-1= 0.0 mm (0.0-in)
Branch deflection above Anchor-2= 29.5 mm (1.2-in) > DN50
22 67.5 m 2m Offset, Fan Coil, Min. riser to support= 779 mm (2.6')
21 64.5 m Movement (FCU) above Anchor-2= 26.1 mm (1.0-in) > DN50 Fan Coil
20 61.5 m Movement (FCU) above Anchor-2= 23.3 mm (0.9-in) > DN50 Fan Coil
19 58.5 m Movement (FCU) above Anchor-2= 20.4 mm (0.8-in) > DN50 Fan Coil
18 55.5 m Movement (FCU) above Anchor-2= 17.6 mm (0.7-in) > DN50 Fan Coil
17 52.5 m Movement (FCU) above Anchor-2= 14.7 mm (0.6-in) > DN50 Fan Coil
16 49.5 m Movement (FCU) above Anchor-2= 11.9 mm (0.5-in) > DN50 Fan Coil
15 46.5 m Movement (FCU) above Anchor-2= 9.1 mm (0.4-in) > DN50 Fan Coil
14 43.5 m Movement (FCU) above Anchor-2= 6.2 mm (0.2-in) > DN65 Fan Coil

Estimated operating load= 1,400 N (320 lbs.) > DN65 Fan Coil
13 40.0 m Estimated max (design) load= 1,400 N (310 lbs.) xxx Anchor 2, Connected per Structural Eng's instructions
12 37.0 m Movement (FCU) below Anchor-2= 0.0 mm (0.0-in) > DN65 Fan Coil
11 34.0 m Movement (FCU) below Anchor-2= -2.8 mm (-0.1-in) > DN65 Fan Coil
10 30.8 m Movement (FCU) below Anchor-2= -5.6 mm (-0.2-in) > DN65 Fan Coil
9 27.4 m Movement (FCU) below Anchor-2= -8.7 mm (-0.3-in) > DN65 Fan Coil
= xxxxxxxx Part No: Fan coil supplier Flex Loop, Copper
~ 25.9 m Estimated design expansion= 50.6 mm (2.0-in) > DN65 Fan Coil
8 24.4 m Between anchors= 30.8m (101.0ft) Pressure (including pump)= 968 kPag (139 psig)
7 21.0 m Movement (FCU) above Anchor-3= 14.5 mm (0.6-in) > DN65 Fan Coil
6 18.0 m Movement (FCU) above Anchor-3= 11.2 mm (0.4-in) > DN65 Fan Coil
5 15.1 m Movement (FCU) above Anchor-3= 8.4 mm (0.3-in) > DN65 Fan Coil
4 12.1 m Movement (FCU) above Anchor-3= 5.6 mm (0.2-in) > DN65 Fan Coil

Estimated operating load= 3,100 N (690 lbs.) > DN65 Fan Coil
3 9.1 m Estimated max (design) load= 3,300 N (740 lbs.) xxx Anchor 3, Connected per Structural Eng's instructions
2 6.2 m Movement (FCU) below Anchor-3= 0.0 mm (0.0-in) > DN65 Fan Coil
6.2 m Bottom, Deflection= -2.8 mm (-0.1-in) - --------------- Min. distance to first support= 779 mm.
DN65
1 0.0 m Pressure (including pump)= 1203 kPag (172 psig)

PROJECT NAME & RISER MATERIALS: RISER TITLE:


The St. Lawrence
Fiberglass insulation FCS UNIT RISER 9 SUPPLY
Copper Type L, Hard drawn pipe From Ground TO LEVEL 26
PROJECT # DATE: RISER CALCULATION No. SHEET REV.
ONT_0647977 Feb 14, 2020 FCS-R9 1 OF 3 1
Using RISERCALC version 1604.35.17.25
PROJECT DRAWING M-605, HOT WATER LOADS
Operating Loads Design Loads Test Loads Staged Loads
Description
[kg] [lbs] [kg] [lbs] [kg] [lbs] [kg] [lbs]
Mass of Water 18 39 18 39 0 0 18
Mass of Pipe 16 35 16 35 16 35 16
Mass of Insulation 6 12 6 12 0 0 0
Mass of Cladding 2 5 2 5 0 0 0
Anchor 1

Mass - Offset 4 9 4 9 4 9 4
Mass of Guides 0 0 0 0 0 0 0
Expansion Load -12 -27 -21 -47 0 0 0
Static Pressure Load 0 0 0 0 0 0 0
TOTAL 15 32 6 14 20 44 20
Mass of Water 115 253 115 253 0 0 115 253
Mass of Pipe 122 270 122 270 122 270 53 117
Mass of Insulation 26 56 26 56 0 0 0 0
Mass of Cladding 9 19 9 19 0 0 0 0
Anchor 2

Mass - Expansion Joint 7 15 7 15 7 15 7 15


Mass of Guides 0 0 0 0 0 0 0 0
Expansion Load -15 -34 -27 -59 0 0 0 0
Static Pressure Load 0 0 0 0 0 0 0 0
TOTAL 142 314 137 302 129 285 60 132
Mass of Water 83 182 83 182 0 0 83 182
Mass of Pipe 66 145 66 145 66 145 66 145
Mass of Insulation 13 30 13 30 0 0 0 0
Mass of Cladding 4 10 4 10 0 0 0 0
Anchor 3

Mass - Expansion Joint 3 6 3 6 3 6 3 6


Mass of Guides 0 0 0 0 0 0 0 0
Expansion Load 28 61 48 105 0 0 0 0
Static Pressure Load 0 0 0 0 0 0 0 0
TOTAL 310 684 334 735 68 151 68 151
Mass of Water
Mass of Pipe
Mass of Insulation
Mass of Cladding
Mass of Joint
Mass of Guides
Expansion Load
Static Pressure Load
TOTAL
NOTES
Positive loads are DOWN, and negative loads are UP.
The structural Engineer shall verify the building capacity to support the anchor loads.
Estimated anchor loads include no factors, and are based on an ASME B31.9 pneumatic pressure test of 1,035 kPag (150 psig)
The loads may vary depending on the pneumatic test procedure and test pressure used by the Contractor.
The Contractor is responsible to ensure that a safe pneumatic pressure test procedure is used.
Seismic and dynamic loads are not included. Loads caused by water hammer are not included.
The pipe weights include a safety margin of 5.0 %.
THIS DOCUMENT IS THE PROPERTY OF FLEX PRESSION (ONTARIO) LTD. AND FLEX PRESSION LTD.. THE DATA HEREIN IS NOT TO BE DISCLOSED IN ANY FORM
TO ANYONE WITHOUT THE WRITTEN PERMISSION OF FLEX PRESSION (ONTARIO) LTD. OR FLEX PRESSION LTD..
CUSTOMER:
D. Zentil/Zencorp Mechanical Ltd.
Flex Pression (Ontario) Ltd.
633 Edgeley Blvd. 2244 Drew Road, Units 4 & 5
Concord, ON L4K 4H6 Mississauga, Ontario L5S 1B1
Tel: (905) 738-0569 Fax: (905) 738-5194 Tel: (905) 671-2244, Fax: (905) 671-1856
PROJECT: RISER TITLE:
The St. Lawrence
158 Front Street East FCS UNIT RISER 9 SUPPLY
Toronto, Ontario
From Ground TO LEVEL 26
PROJECT # DATE: RISER CALCULATION No. SHEET REV.
200130 Feb 14, 2020 FCS-R9 2 OF 3 1
Using RISERCALC version 1604.35.17.25
PROJECT DRAWING M-605, HOT WATER DEFLECTIONS
Deflection Results Operating Design Vertical Rise
Top (Floor 26) to Anchor 1 (Floor 23)-
12.75 mm 0.502 in 22.11 mm 0.871 in 13.4 m 44.13 ft
TOTAL
Anchor 1 (Floor 23) to Anchor 2 (Floor
29.48 mm 1.161 in 51.13 mm 2.013 in 31.1 m 102.03 ft
13)- TOTAL
Anchor 2 (Floor 13) to Anchor 3 (Floor
29.20 mm 1.150 in 50.63 mm 1.993 in 30.8 m 101.05 ft
3)- TOTAL
Anchor 3 (Floor 3) to Bottom (Floor 1)-
2.80 mm 0.110 in 4.85 mm 0.191 in 3.0 m 9.68 ft
TOTAL

Temperature Differential 55.556 °C 100.0 °F 77.778 °C 140.0 °F


Expansion Rate - Copper Type L, Hard
0.948 mm/m 1.14 in/100-ft 1.644 mm/m 1.97 in/100-ft
drawn

NOTES
Minus values indicate contraction (cold) movements, and positive values represent expansion (hot) movements.
Calculated pipe expansion for sizing the expansion joint, is based on 60.0 to -17.8 °C (140.0 to 0.0 °F) plus 25.0 % safety factor.
Calculated operating pipe expansion, is based on 60.0 to 4.4 °C (140.0 to 40.0 °F)
The calculated deflections do not include building creep and shrinkage.
Branches to be located so that the insulation clears the underneath of the slab sufficiently to allow for the movement of the pipe.
THIS DOCUMENT IS THE PROPERTY OF FLEX PRESSION (ONTARIO) LTD. AND FLEX PRESSION LTD.. THE DATA HEREIN IS NOT TO BE DISCLOSED IN ANY
FORM TO ANYONE WITHOUT THE WRITTEN PERMISSION OF FLEX PRESSION (ONTARIO) LTD. OR FLEX PRESSION LTD..
CUSTOMER:
D. Zentil/Zencorp Mechanical Ltd.
Flex Pression (Ontario) Ltd.
633 Edgeley Blvd. 2244 Drew Road, Units 4 & 5
Concord, ON L4K 4H6 Mississauga, Ontario L5S 1B1
Tel: (905) 738-0569 Fax: (905) 738-5194 Tel: (905) 671-2244, Fax: (905) 671-1856
PROJECT: RISER TITLE:
The St. Lawrence
158 Front Street East FCS UNIT RISER 9 SUPPLY
Toronto, Ontario From Ground TO LEVEL 26
PROJECT # DATE: RISER CALCULATION No. SHEET REV.

200130 Feb 14, 2020 FCS-R9 3 OF 3 1


Using RISERCALC version 1604.35.17.25