This document is a cost estimate from a machine manufacturer for a job dated January 3, 2006. It lists the raw material as E-8 weighing 0.99 units at a cost of $90. The total cost of cutting, lathe work, grinding, and overhead is $502.64. With a 15% markup for profit, the total cost is $578.04. Adding a $28.90 low volume allowance, the final part cost is $606.94.
This document is a cost estimate from a machine manufacturer for a job dated January 3, 2006. It lists the raw material as E-8 weighing 0.99 units at a cost of $90. The total cost of cutting, lathe work, grinding, and overhead is $502.64. With a 15% markup for profit, the total cost is $578.04. Adding a $28.90 low volume allowance, the final part cost is $606.94.
This document is a cost estimate from a machine manufacturer for a job dated January 3, 2006. It lists the raw material as E-8 weighing 0.99 units at a cost of $90. The total cost of cutting, lathe work, grinding, and overhead is $502.64. With a 15% markup for profit, the total cost is $578.04. Adding a $28.90 low volume allowance, the final part cost is $606.94.