ENGINEERING- Machine manufacturer - xxx

Date : 03-01-2006 JOB - XXXXXX


S No Description
1 Qty 1
2 Raw material SS
3 RM Weight 1.00
4 RM cost 87.00
5 Cutting Charge 8.00
6 Lathe Work 170.00
7 Surface Grinding 80.00
8 Cylindrical Grinding 140.00
9 Total 485.00
10 Rejection 3% 14.55
11 Total 499.55
12 Overhead & Profit 15% 74.93
13 Total 574.48
14 Low Volume allowance 28.72
15 Part Final 603.21