PARTLY FIXED AND PARTLY SLIDING USING DELUXE SECTION OFM/S PAKISTAN
CABLES OR EQUIPMENT APPROVED FIRM HAVING FRAME OF SIZE 100MMX30MM AND
LEAF FRAME SECTION OF SIZE 45MM X 25MM/45MM X35MM, ALL OF 1.6MM THICKNESS
I/C 5MM THICK TINTED GLASS WITH RUBBER GASKET USING APPROVED STANDARD
LATCH, HARDWARE i/c USING IMPORTED BRUSHES FOR DUST PROOFING AND
IMPORTED RULAR. COMPLETE IN ALL RESPECT AND AS APPROVED BY THE ENGINEER
INCHARGE.
MATERIAL
M.S Falt frame for grill
2.50+3.50+2.50+3.50 =12
12@ 0.478Lbs=5.736 Lbs
5.736x0.454=2.6 2.6 Kg 78.1 P.Kg
M.s Square Bar 3/8"x3/8"
Straight 3.50x2x3 21
Flower 6x4x1.25 30
side 6x4x1.25 6
Front 6x1x2 12
Toatl 69
Add 5% wastage 3
Toatl 72 Lbs
72x0.478x0.454=16 16 Kg 78.1 P.Kg
Holdfast 6" 6 Nos 10 Each
Electrical charges
Electrode 0.33 Pkt 300 P.Pkt
Painting 3 coats MRS 2x8.75=17.50 17.5 Sft 384.55 %Sft
Say Rs.
Certified that Rates for material and labour are as per input rates as displayed on web site of finance
Department for the 2nd Bi Annual 2013
/16" FOR FRAME IN WINDOWS OF
N 3/4" X3/4"X1/8" PAINTING THREE
WELDING ETC COMPLETE IN ALL
203.06
2.604144
1249.6 34.416
60 16
99.00
67.30
1679.0 1678.96
322.3
2001.3
75.65
75.65
89
240.3
24.03
264.33
52.87
317.20
2318.48
271.49
271
as displayed on web site of finance
LADIES BLOCK
1 Providing and laying Porceline tiles FLOORING 16”x16”x3/8" Light colour
laid in white cement and matching pigment over 3/4" thick cement samd
mortar (1:2) i/c filling joints in white cement and matching pigment etc
complete in all respect and as approved by the Engineer Incharge. Master
Class SB PNM Series
3 P/L Ceramic Tile (Master Or Equalant ) Light Colour Bello (Bl) Series, Sb
Class 10" X 13" Size Laid Over A Bed Of 3/4" Thick Cement Sand Mortar 1:2
I/C Fillining Joints With White Cement Mixed With Matching Pigments
Complete In All Respect As Approved By The Engineer Incharge (For Floor)
2(6+13.625+11.125+2.5+39.75+12.125+46
+12.125+39.375+12.125+23)42 18291 Sft
18291 Sft
Total Rs.
Total Rs.
19721
107625
292077
2066883
2692556
2692500
isional Officer,
KITCHEN AND DINNING HALL
1 Providing and laying Porceline tiles FLOORING 16”x16”x3/8" Light colour
laid in white cement and matching pigment over 3/4" thick cement samd
mortar (1:2) i/c filling joints in white cement and matching pigment etc
complete in all respect and as approved by the Engineer Incharge. Master
Class SB PNM Series
2 Providing and fixing fair face Gutka Cladding upto required height using
special gutka of size 9"x2-1/4"x2-1/4" i/c cutting ghutka where necessary
laying in 1:3 cement sand motor mixed with red oxide pigment with 3/8" thick
joints an nominal filling the gap complete i/c cost of G.I wire 8 SWG iron
hoop and loops at every 4 ft center to center horizontally and in every 4th
course vertically of cladding, hoops / loops embedded half in the wall and
half embedded in cladding complete in all respect and as approved and
directed by the Engineer Incharge.
28 x 6 x 6 1,008 Sft
Total Rs.
Say Rs.
118000
2245875
245952
273168
229040
5576035
5576000
isional Officer,
MALE HOSTEL BLOCK
1 P/L Ceramic Tile (Master Or Equalant ) Light Colour Bello (Bl)
Series, Sb Class 10" X 13" Size Laid Over A Bed Of 3/4" Thick
Cement Sand Mortar 1:2 I/C Fillining Joints With White Cement
Mixed With Matching Pigments Complete In All Respect As
Approved By The Engineer Incharge
(For FLOOR)
2 ( 18+20+58.50+14+18+22.375+18+14
+58.50+18+20+31.75+31.75) x 29 19886.8 Sft
4 Marble (china verona ) full width over 3/4" thick cement plaster 1:2
cement sand mortor i/c chemical polishing complete in all respect
Total Rs 3282100
###
Say Rs. 3282100
###
3 Providing and fixing fair face Gutka Cladding upto required height
using special gutka of size 9"x2-1/4"x2-1/4" i/c cutting ghutka where
necessary laying in 1:3 cement sand motor mixed with red oxide
pigment with 3/8" thick joints an nominal filling the gap complete i/c
cost of G.I wire 8 SWG iron hoop and loops at every 4 ft center to
center horizontally and in every 4th course vertically of cladding,
hoops / loops embedded half in the wall and half embedded in
cladding complete in all respect and as approved and directed by the
Engineer Incharge.
2 ( 18+20+58.50+14+18+22.375+18+14
+58.50+18+20+31.75+31.75) x 29 19887 Sft
2 x 24 x 4 x 5 960 Sft
P/L Ceramic Tile (Master Or Equalant ) Light Colour Bello (Bl) Series, Sb
Class 10" X 13" Size Laid Over A Bed Of 3/4" Thick Cement Sand
Mortar 1:2 I/C Fillining Joints With White Cement Mixed With Matching
Pigments Complete In All Respect As Approved By The Engineer
Incharge
(For DADO/SKIRTING)
Rs. ###
6550718 ###
Rs. ###
6550700 ###
70 x 62 x 1 4340 Sft
4450 Sft
(210-67.22+21.84 = 164) 4450 Sft @ 164.00 P.Sft Rs.
3 marble (china verona ) full width over 1/2" thick cement plaster 1:2 cement
sand mortor i/c chemical polishing complete in all respect
4 P/L Ceramic Tile (Master Or Equalant ) Light Colour Bello (Bl) Series, Sb
Class 10" X 13" Size Laid Over A Bed Of 3/4" Thick Cement Sand Mortar
1:2 I/C Fillining Joints With White Cement Mixed With Matching Pigments
Complete In All Respect As Approved By The Engineer Incharge
Bath (For 2FLOOR)
x 16.5 x 14.75 487 Sft
Bath 8 x 5 x 3 120 Sft
Bath 2 x 5.75 x 5 58 Sft
1 x 18 x 18 324 Sft
1 x 25 x 4 100 Sft
1088 Sft
(120-67.22+21.84 = 75) 1088 Sft @ 75.00 P.Sft Rs.
P/L Ceramic Tile (Master Or Equalant ) Light Colour Bello
(Bl) Series, Sb Class 10" X 13" Size Laid Over A Bed Of
3/4" Thick Cement Sand Mortar 1:2 I/C Fillining Joints With
White Cement Mixed With Matching Pigments Complete In
All Respect As Approved By The Engineer Incharge
(For DADO/SKIRTING)
2 x ( 16.50 + 14.75) x 6 375 Sft
8 x 2 (5 + 3)x6 768 Sft
2 x 2 ( 5.75+5) x 6 258 Sft
1401 Sft
2 x 12 x 5 x 5 600 Sft
2 x 9 x 3 x 2 108 Sft
2 x 1 x 5 x 2 20 Sft
708 Sft
(680-436) 708 Sft @ 244.00 P.Sft Rs.
6 p/f M.s. Grill of 3/8"x3/8" sq bar i/c m.s flat 3/4"x3/16" for frame in windows
of approved design 6 nos holdfast 9" long of m.s iron 3/4" x3/4"x1/8" painting
three coats i/c cost of labour material and carriage welding etc complete in
all respect as approved by the engineer incharge.
2 x 12 x 5 x 5 600 Sft
2 x 9 x 3 x 2 108 Sft
2 x 1 x 5 x 2 20 Sft
708 Sft
708 Sft @ 271.00 P.Sft Rs.
Total Rs.
Say Rs.
625371
729800
261240
81619
116283
172752
191868
83436
2262368
2262300
ACADEMIC BLOCK
1 Providing and laying Porceline tiles FLOORING 16”x16”x3/8" Light colour
laid in white cement and matching pigment over 3/4" thick cement samd
mortar (1:2) i/c filling joints in white cement and matching pigment etc
complete in all respect and as approved by the Engineer Incharge. Master
Class SB PNM Series
science 1 x 48 24 1152 Sft
i/o 2 x 12 x 22 528 Sft
i/office 1 x 20 x 20 400 Sft
i/office 1 x 13 x 12 156 Sft
i/office 1 x 20 x 18 360 Sft
i/office 1 x 8.5 x 15 128 Sft
i/office 1 x 13 x 11.25 146 Sft
Cari /d 1 x 7 x 23 161 Sft
T-room 2 x 18 x 30 1080 Sft
Veranda 1 600 x 10 6000 Sft
First floor
1 x 74.5 x 24 1788 Sft
1 x 48 x 24 1152 Sft
1 x 600 x 10 6000 Sft
2 x 18 x 30 1080 Sft
20131 Sft
2 ( 48 + 24 ) x0.50 72 Sft
2 x 2( 12+22) x 0.50 68 Sft
1 x 2( 20+20) x 0.50 40 Sft
2 ( 13+12) x 0.50 25 Sft
2 ( 20+18) x 0.50 38 Sft
2 ( 18.50 + 12) x 0.50 24 Sft
2( 13+11.25 ) 0.50 24 Sft
2( 7+23) x 0.50 30 Sft
2x 2 ( 18+30) x 0.50 96 Sft
2 x (600 + 10) x 0.50 610 Sft
2 x ( 74.50 + 24) x 0.50 99 Sft
2 x ( 48+24) x 0.50 72 Sft
2 x (600 + 10) x 0.50 610 Sft
2 x 2 ( 18+30) x 0.50 96 Sft
1904 Sft
(164-67.22+21.84 = 118) 1904 Sft @ 118.00 P.Sft Rs. 224672
2 x 15 x 4 x 6 720 Sft
720 Sft
(680-436) 720 Sft @ 244.00 P.Sft Rs. 175680
4 P/F M.S.GRILL OF 3/8"X3/8" SQ BAR I/C M.S FLAT 3/4"X3/16" FOR
FRAME IN WINDOWS OF APPROVED DESIGN 6 NOS HOLDFAST 9"
LONG OF M.S IRON 3/4" X3/4"X1/8" PAINTING THREE COATS I/C COST
OF LABOUR MATERIAL AND CARRIAGE WELDING ETC COMPLETE IN
ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE.
2 x 15 x 4 x 6 720 Sft
720 Sft
720 Sft @ 271.00 P.Sft Rs. 195120
6 Providing and fixing fair face Gutka Cladding upto required height using
special gutka of size 9"x2-1/4"x2-1/4" i/c cutting ghutka where necessary
laying in 1:3 cement sand motor mixed with red oxide pigment with 3/8" thick
joints an nominal filling the gap complete i/c cost of G.I wire 8 SWG iron
hoop and loops at every 4 ft center to center horizontally and in every 4th
course vertically of cladding, hoops / loops embedded half in the wall and
half embedded in cladding complete in all respect and as approved and
directed by the Engineer Incharge.
34 x 6 x 6 1,224 Sft
1,224 Sft
(680-436) 1224 Sft @ 244.00 P.Sft Rs. 298656
34 x 6 x 6 1,224 Sft
1,224 Sft
1224 Sft @ 271.00 P.Sft Rs. 331704
5 Providing and fixing fair face Gutka Cladding upto required height using
special gutka of size 9"x2-1/4"x2-1/4" i/c cutting ghutka where necessary
laying in 1:3 cement sand motor mixed with red oxide pigment with 3/8" thick
joints an nominal filling the gap complete i/c cost of G.I wire 8 SWG iron
hoop and loops at every 4 ft center to center horizontally and in every 4th
course vertically of cladding, hoops / loops embedded half in the wall and
half embedded in cladding complete in all respect and as approved and
directed by the Engineer Incharge.
P/L Ceramic Tile (Master Or Equalant ) Light Colour Bello (Bl) Series, Sb
Class 10" X 13" Size Laid Over A Bed Of 3/4" Thick Cement Sand Mortar 1:2
I/C Fillining Joints With White Cement Mixed With Matching Pigments
Complete In All Respect As Approved By The Engineer Incharge
(For FLOORING)
2 x 6 x 7.5 90 Sft
2 x 5 x 9 90 Sft
2 x 16 x 16 512 Sft
692 Sft
(120-67.22+21.84 = 75) 692 Sft @ 75.00 P.Sft Rs. 51900
P/L Ceramic Tile (Master Or Equalant ) Light Colour Bello (Bl) Series, Sb Class
10" X 13" Size Laid Over A Bed Of 3/4" Thick Cement Sand Mortar 1:2 I/C
Fillining Joints With White Cement Mixed With Matching Pigments Complete In
All Respect As Approved By The Engineer Incharge
(For DADO/SKIRTING)
2 x 2 ( 6 + 7.50 ) x 6 324 Sft
2 x2(5+9)x6 336 Sft
2 x2(5+5)x6 240 Sft
1 x 2 ( 5.25 + 5 ) x 6 123 Sft
1 x 2 ( 8.5 + 7.25 ) x 6 189 Sft
1212 Sft
AUDITORIUM BLOCK
1 Providing and laying Porceline tiles FLOORING 16”x16”x3/8" Light colour
laid in white cement and matching pigment over 3/4" thick cement samd
mortar (1:2) i/c filling joints in white cement and matching pigment etc
complete in all respect and as approved by the Engineer Incharge. Master
Class SB PNM Series
Stage 1 x 52 23 1196 Sft
Hall 1 x 52 x 17 884 Sft
VIP 1 x 14.5 x 8.5 123 Sft
2203 Sft
(156-67+21.83 = 110) 2203 Sft @ 110.00 P.Sft Rs. 242358
P/L Ceramic Tile (Master Or Equalant ) Light Colour Bello (Bl) Series, Sb
Class 10" X 13" Size Laid Over A Bed Of 3/4" Thick Cement Sand Mortar 1:2
I/C Fillining Joints With White Cement Mixed With Matching Pigments
Complete In All Respect As Approved By The Engineer Incharge
(For FLOORING)
P/L Ceramic Tile (Master Or Equalant ) Light Colour Bello (Bl) Series, Sb Class
10" X 13" Size Laid Over A Bed Of 3/4" Thick Cement Sand Mortar 1:2 I/C
Fillining Joints With White Cement Mixed With Matching Pigments Complete In
All Respect As Approved By The Engineer Incharge
(For DADO/SKIRTING)
3 Providing and fixing fair face Gutka Cladding upto required height using
special gutka of size 9"x2-1/4"x2-1/4" i/c cutting ghutka where necessary
laying in 1:3 cement sand motor mixed with red oxide pigment with 3/8" thick
joints an nominal filling the gap complete i/c cost of G.I wire 8 SWG iron
hoop and loops at every 4 ft center to center horizontally and in every 4th
course vertically of cladding, hoops / loops embedded half in the wall and
half embedded in cladding complete in all respect and as approved and
directed by the Engineer Incharge.
1x ( 18+61.125+30+61.125+8+51.75+49.75
+51.75+16+17+8) x15 5588 Sft
5588 Sft
5588 Sft @ 113.00 P.Sft Rs. 631388
4 P/L Ceramic Tile (Master Or Equalant ) Light Colour Bello (Bl) Series, Sb
Class 10" X 13" Size Laid Over A Bed Of 3/4" Thick Cement Sand Mortar 1:2
I/C Fillining Joints With White Cement Mixed With Matching Pigments
Complete In All Respect As Approved By The Engineer Incharge
(For FLOORING)
Bath 2 x 7.25 x 3.625 53 Sft
Bath 2 x 7.25 x 8 116 Sft
Bath 2 x 7.25 x 4 58 Sft
Bath 1 x 8 x 7.125 57 Sft
Bath 1 x 5 x 8 40 Sft
324 Sft
(120-67.22+21.84 = 75) 324 Sft @ 75.00 P.Sft Rs. 24267
5 P/L Ceramic Tile (Master Or Equalant ) Light Colour Bello (Bl) Series, Sb Class
10" X 13" Size Laid Over A Bed Of 3/4" Thick Cement Sand Mortar 1:2 I/C
Fillining Joints With White Cement Mixed With Matching Pigments Complete In
All Respect As Approved By The Engineer Incharge
(For DADO/SKIRTING)
2 x 2 ( 7.25+3.625 ) x 6 261 Sft
2 x 2 ( 7.25+ 8 ) x 6 366 Sft
2 x 2 ( 7.25 + 4 ) x 6 270 Sft
1 x 2 ( 8 + 7.125 ) x 6 182 Sft
1 x2(5+8)x6 156 Sft
1235 Sft
A MATERIAL
Total: - Rs 38370
Add 20% contractor profit & overhead charge Rs 7674
Total: - A Rs 46043
B LABOUR FOR 300-SFT
Total: - Rs 7933
Add 10% Sundries charges. Rs 793.25
Rs 8726
Add 20% contractor profit & overhead charge Rs 1745
Total: - Rs 10471
i. Certified that rates for above items are not avalibale on the website
of Finance Department for the month of 2nd Bi Annual 2013 and as such the
rate of Rs.495/- P.Sft has been applied after ascertaining it, from the
markete.
ii. Certified that input rates incorporated in the rate analsis of non-Standardized
items are as per input rates displayed on the Web site by Finance Department for
the month of 2nd Bi Annual 2013/Market rates.
1 P/F 1/2'' thick marble (china verona) full width over 1/2''thick
cement plaster 1:2 cement sand mortor I/c rubbing and chemical
polishing complete as approved by the Engineer Incharge.
100 Sft
add 10% wastage. 15
115 Sft
@ Rs 150/- P.Sft Rs 17250.00
B LABOUR.
Mason 1-1/2-Nos @ Rs 300/- P.day Rs 450.00
Total:- Rs 20322.50
i. Certified that rates for above items are not avalibale on the website
of Finance Department for the month of 1st quarter of 2009 and as such the
rate of Rs. 240.00 P.Sft has been applied after ascertaining it, from the
markete.
ii. Certified that input rates incorporated in the rate analsis of non-Standardized
items are as per input rates displayed on the Web site by Finance Department for
the month of 1st quarter of 2009/Market Rates.
ANALYSIS OF RATE FOR Y.C. 8 PIECES COMMON LEGAL BATH SET MASTER WITH WALL SHOWER,
BIB COCK STOP COCK, MIXING VALVE, MUSLIM SHOWER ITEM NO. 3018A (035/1,392B/1,068/3,
070/1,085/1,2015/1)COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE.
B LABOUR
i. Certified that rates for above items are not avalibale on the website
of Finance Department for the 3rd Qtr. Of 2006 and as such the
rate of Rs. 15500 Each has been applied after ascertaining it, from the
markete.
ii. Certified that input rates incorporated in the rate analsis of non-Standardized
items are as per input rates displayed on the Web site by Finance Department for
the 3rd Qtr. Of 2006.
ANALYSIS OF RATE
100 Sft
add 10% wastage. 15
115 Sft
@ Rs 210/- P.Sft Rs 24150.00
B LABOUR.
Mason 1-1/2-Nos @ Rs 300/- P.day Rs 450.00
Total:- Rs 26880.60
i. Certified that rates for above items are not avalibale on the website
of Finance Department for the month of 1st quarter of 2007 and as such the
rate of Rs. 322.00 P.Sft has been applied after ascertaining it, from the
markete.
ii. Certified that input rates incorporated in the rate analsis of non-Standardized
items are as per input rates displayed on the Web site by Finance Department for
the month of 1st quarter of 2007/Market Rates.
ANALYSIS OF RATE
P/F M.S iron grill on B/wall consisting of 1/2" sqaure bars @ 5"C/C
with one post of double angle iron 1-1/2"x1-1/2"x1/4" at
every 7' distance with 3-Nos flat iron 1-1/2"x3/16" horizontal,
6-Nos M.S spike in every 7' distance and architectural feature
of M.S flat 3/4"x1/8" on top of 3-Nos sqaure bars I/c 3-coats of
painting and embeded each post in plain cement concrete 1:2:4
9"x9"x9" size as per drawing and as approved by the Engineer incharge.
UniP.Sft
A MATERIAL Take Length = 7.125x2.50=17.81-Sft
10 x 2 20 Rft
6 x 1.67 10 Rft
30 Rft
Add 5% wastage. 1.5 Rft
31.5 Rft
31.5 x 0.85 x 0.4536 12.15 Kg
6 Nos
30 Kg
2x17.5 35 Sft
Contd: P-2
P-2
Add: 10% Sundries charges on item No.vi Rs. 585.00 Rs. 58.50
Add: 10% Contractor profit and 10% over head charges Rs. 429.40
on Rs.2147/-.
Total:-2838.06
Rate P.Sft
2838.06/17.81 = 159.35
ANALYSIS OF RATE.
A MATERIAL
B LABOUR
Total: - Rs 2850.00
Total: - Rs 3420.00
Say Rs 3400.00
i. Certified that rates for above items are not avalibale on the website
of Finance Department for the month of 3rd quarter of 2008 and as such the
rate of Rs.3400.00 Each has been applied after ascertaining it, from the
markete.
ii. Certified that input rates incorporated in the rate analsis of non-Standardized
items are as per input rates displayed on the Web site by Finance Department for
the 3rd quarter of 2008/Market Rates.
Executive Engineer, Sub Divisional Officer,
ANALYSIS OF RATE
A MATERIAL
1 Shisham wood strip frame. 11x1/3x3/4x10 27.50 Cft
Total 27.5 Cft
Add 5% wastage. 1.375 Cft
28.875 Cft
28.88 Cft @ Rs 550 P.Cft Rs 15881
2 Commercial ply 6-mm thick. 1x10x10 100 Sft
Total 100 Sft
Add 5% wastage. 5 Sft
105 Sft
105 Sft @ Rs 13 P.Sft Rs 1365
3 Decorative wall cloth I/c chemica1x10x10 100 Sft
lotion. Total 100 Sft
Add 5% wastage. 5 Sft
105 Sft
105 Sft @ Rs 26 P.Sft Rs 2730
Spraying anti-termite liquid 2-time spraying.
100 Sft @ Rs 185.4 % Sft Rs 185
5 P/L polythene sheet 500-gauge.
100 Sft @ Rs 165 % Sft Rs 165
6 Cost of Nails. L.S. Rs 100
G.Total:- Rs 27333.80
Rate Per Sft. 27333.80/100 = 273.34
Say Rs = 273 P.Sft
i. Certified that rates for above items are not avalibale on the website
of Finance Department for the month of 2nd Qtr: 2008 and as such the
rate of Rs.273 P.Sft has been applied after ascertaining it, from the
markete.
ii. Certified that input rates incorporated in the rate analsis of non-Standardized
items are as per input rates displayed on the Web site by Finance Department for
the 2nd quarter of 2008/Market Rates.
Material
i M.S square bar 3/8"x3/8"
2x(6+8) 28 Rft
4x0.33 1.32 Rft
29.32 Rft
Add 10% wastage 2.93 Rft
32.20 Rft
@ Rs. 35 P.Rft Rs 1127.00
LABOUR
0.25 Mason
@ Rs. 170 P. Day Rs 42.50
Total:- Rs 6421
i. Certified that rates for above items are not avalibale on the website
of Finance Department for the month of 2nd Qtr: 2008 and as such the
rate of Rs.158/- P.Sft has been applied after ascertaining it, from the
markete.
ii. Certified that input rates incorporated in the rate analsis of non-Standardized
items are as per input rates displayed on the Web site by Finance Department for
the 2nd quarter of 2008/Market Rates.
MATERIAL
M.S Falt frame for grill
2.50+3.50+2.50+3.50 =12
12@ 0.478Lbs=5.736 Lbs
5.736x0.454=2.6 2.6 Kg 78.1 P.Kg
M.s Square Bar 3/8"x3/8"
Straight 3.50x2x3 21
Flower 6x4x1.25 30
side 6x4x1.25 6
Front 6x1x2 12
Toatl 69
Add 5% wastage 3
Toatl 72 Lbs
72x0.478x0.454=16 16 Kg 78.1 P.Kg
Holdfast 6" 6 Nos 10 Each
Electrical charges
Electrode 0.33 Pkt 300 P.Pkt
Painting 3 coats MRS 2x8.75=17.50 17.5 Sft 800.05 %Sft
Say Rs.
Certified that Rates for material and labour are as per input rates as displayed on web site of finance
Department for the 1st Bi Annual 2014.
/16" FOR FRAME IN WINDOWS OF
N 3/4" X3/4"X1/8" PAINTING THREE
WELDING ETC COMPLETE IN ALL
203.06
2.604144
1249.6 34.416
60 16
99.00
140.01
1751.7 1751.67
322.3
2074.0
75.65
75.65
89
240.3
24.03
264.33
52.87
317.20
2391.20
280.00
280
as displayed on web site of finance